검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 13

        1.
        2025.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The purpose of this study is to explore the applicability of satellite-based synthetic aperture radar (SAR) data combined with pavement management system (PMS) indicators for effective road condition monitoring on mountainous local roads. Field survey data, including the International Roughness Index (IRI) and rutting measurements, were used as the ground truth, whereas Sentinel-1 and COSMO-SkyMed SAR images were processed using the time-series InSAR analysis to detect surface displacement and pavement deformations. In addition, a deep learning framework integrating PMS data and SAR imagery was developed, consisting of a swine transformer and CNN–LSTM networks for the classification and localization of pavement defects. The results demonstrated that X-band SAR backscatter values were correlated with IRI variations and that the proposed hybrid two-stage approach (CNN for surface damage and LSTM for rutting) enhanced the accuracy of defect detection compared with conventional single-model approaches. These findings highlight the potential of combining remote sensing and AI-based analysis with existing PMS datasets to provide a cost-effective and scalable solution for road asset management and maintenance prioritization.
        4,000원
        3.
        2024.10 구독 인증기관·개인회원 무료
        본 논문에서는 건설 현장 관리의 과제를 다루고 IoT 기술 활용을 위한 기술 적용에 대해 정리하였다. 도로 포장 장비의 유휴 시간을 모니터링하는 IoT 장치를 설계 및 구현하여 효율적인 장비 관리 시스템을 개발하는 것을 목표한다. 또한, 본 연구에서는 통신방식 선 정, 사용자 친화적인 플랫폼 설계, 데이터 수집 및 분석을 위한 진동센서 기반 IoT 디바이스 개발을 통한 실시간 관리에 중점을 두고 있다. 플랫폼을 통해 공사현황을 실시간으로 모니터링하고 장비 유휴시간을 관리해 효율성을 높일 수 있으며, IoT 디바이스는 90% 이 상의 데이터 정확도를 보장한다. 현장 테스트를 통해 장비 사용 추적 효과가 확인되어 보다 효율적인 건설 관리에 기여하고자 한다.
        4.
        2023.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : The evaluation of the low-temperature performance of an asphalt mixture is crucial for mitigating transverse thermal cracking and preventing traffic accidents on expressways. Engineers in pavement agencies must identify and verify the pavement sections that require urgent management. In early 2000, the research division of the Korea Expressway Corporation developed a three-dimensional (3D) pavement condition monitoring profiler vehicle (3DPM) and an advanced infographic (AIG) highway pavement management system computer program. Owing to these efforts, the management of the entire expressway network has become more precise, effective, and efficient. However, current 3DPM and AIG technologies focus only on the pavement surface and not on the entire pavement layer. Over the years, along with monitoring, further strengthening and verification of the feasibility of current 3DPM and AIG technologies by performing extensive mechanical tests and data analyses have been recommended. METHODS : First, the pavement section that required urgent care was selected using the 3DPM and AIG approaches. Second, asphalt mixture cores were acquired from the specified section, and a low-temperature fracture test, semi- circular bending (SCB) test, was performed. The mechanical parameters, energy-release rate, and fracture toughness were computed and compared. RESULTS : As expected, the asphalt mixture cores acquired from the specified pavement section ( poor condition – bad section) exhibited negative fracture performances compared to the control section (good section). CONCLUSIONS : The current 3DPM and AIG approaches in KEC can successfully evaluate and analyze selected pavement conditions. However, more extensive experimental studies and mathematical analyses are required to further strengthen and upgrade current pavement analysis approaches.
        4,000원
        8.
        2020.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : For large-scale construction, such as a concrete pavement, design and construction are not entirely consistent. If the inconsistency between design and construction is very large, construction quality is significantly degraded, affecting performance life span and driving comfort. The quality of pavement construction is managed according to standards. However, it is difficult to improve construction quality as the standard measures construction quality after construction is completed. Therefore, this study developed a system to measure the construction quality of concrete pavement in real-time and presented the corresponding standards. METHODS : A basic module for simultaneously measuring the width, thickness, and roughness of the concrete pavement was designed. Based on the measurement results of the distance measurement sensor, a calibration method is presented that can remove noise. The system process was developed to measure construction quality based on location and distance data, measured in real-time using GPSs and sensors. The field application experiment was conducted and the results were analyzed. RESULTS : The measurement module is properly designed to be used in concrete pavement construction sites. Noise was removed from the distance measurement sensor results according to the presented calibration method, leaving only the wave of pavement surface irregularities. As a result of applying the system process in the field application, a reasonable level of PRI was observed. CONCLUSIONS : In the past, the width, thickness, and roughness were measured after construction was completed and, if the standard was not met, construction quality control was performed via reconstruction or repair. Through this study, it is expected that the width, thickness, and roughness of the concrete pavement can be measured in real-time and, if the standard is not met, construction quality can be immediately controlled during construction to maintain high quality.
        4,000원
        9.
        2020.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : Pavement growth (PG) of concrete pavement has been recognized as a major concern to highway and airport engineers as well as to road users for many years. PG is caused by the pressure generation in the concrete pavement as a result of a rise of the concrete temperature and moisture. PG could result in concrete pavement blowup and damage the adjacent or the nearby structures such as bridge structures. The amount of the PG is affected by the complicated interactions of numerous factors such as climatic condition, amounts of incompressible particles (IP) infiltration into the joints, pavement structure, and materials. Trigger temperature for pavement growth (TTPG) is defined as the concrete temperature when all transverse cracks or joints within the expansion joints completely close and generating a pressure in the pavement section. It is one of the most critical parameters to evaluate the potential of PG occurring in the pavement. Unfortunately, there are no available methods or guidelines for estimating TTPG. Therefore, this study aims to provide a methodology to predict TTPG of a concrete pavement section. METHODS : In this study, a method to evaluate the TTPG and its influencing factors using the field measured data of concrete pavement expansions is proposed. The data of the concrete pavement expansions obtained from the long-term monitoring of three concrete pavement sections, which are I-70, I-70N, and Md.458, in Maryland of United Stated, were used. The AASHTO equation to estimate the joint movement in concrete pavement was used and modified for the back-calculation of the TTPG value. A series of the analytical and numerical solutions presented in the literatures were utilized to predict the friction coefficient between the concrete slab-base and to estimate the maximum concrete temperature of these three pavement sections. RESULTS : The estimated maximum concrete temperature of these three pavement sections yearly exhibited relatively constant values, which range from 40 to 45 °C. The results of the back-calculation revealed that the TTPG of the I-70 and Md.58 sections decreased with time. However, the TTPG of the I-70N section tended to be relatively constant from the first year of the pavement age. CONCLUSIONS : The estimation of the TTPG for the three concrete pavement sections showed that the values of the TTPG gradually decreased although the yearly maximum concrete pavement temperature did not change significantly.
        4,000원
        10.
        2015.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES: This paper describes the expansion caused by the alkali-aggregate reaction (AAR) in concrete pavement currently in service. It also discusses the effects of joints installed to release the stress induced by the AAR expansion. METHODS: The expansion effect on concrete pavement was verified by a visual inspection and long-term measurement of the joint width of a cut-section. The behaviors of 16 newly installed joints were monitored as part of the investigation and long-term monitoring was carried out for three years after cutting. RESULTS: The behavior of a bridge was affected when AAR occurred in the connected pavement. The newly installed joints shrank in the longitudinal direction of the bridge after cutting. The width of the joints decreased over the six months after cutting. A large portion of the joint width (8.5cm) was found to have closed nine months after cutting. It had ultimately shrunk by about 92 percent when the final measurement was taken. CONCLUSIONS : The expansion of the pavement due to AAR was quantitatively described by visual inspection and the long-term monitoring of the newly cut joints. However, the width of the new joints decreased over the six to nine months after cutting. Additional research should be conducted to determine a means of controlling the expansion due to AAR in the pavement.
        4,000원
        11.
        2011.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구는 조립식 콘크리트 포장 공법을 이용하여 도심지 버스전용차로의 정거장 구간 아스팔트 포장을 강성 포장으로 교체하는 시공을 수행한 후 이러한 포장의 초기 공용성을 분석하기 위해 수행되었다. 추적조사 항목으로는 조립식포장의 진출입 구간에서 아스팔트 포장과 조립식포장과의 단차, 프리캐스트 슬래브간의 줄눈 간격 및 단차, 슬래브의 침하, 슬래브의 미끄럼저항 성능 등을 선정하였으며, 다이아몬드 그라인딩 공법의 적용성도 분석하였다. 추적조사 결과 조립식포장의 단차, 줄눈 간격, 미끄럼저항, 침하 등은 시간에 따라 변화가 거의 없었으며, 이를 통해 프리캐스트 슬래브가 차량하중을 안정되게 지지한다는 것을 알 수 있었다. 또한 다이아몬드 그라인딩 공법을 적용하면 슬래브의 단차 및 미끄럼저항 성능을 크게 개선할 수 있는 것도 확인할 수 있었다.
        4,000원
        13.
        2011.02 서비스 종료(열람 제한)
        도로포장의 유지관리를 위해서는 운전자가 직접적으로 느끼게 되는 평탄성에 대한 관리가 중요하며 이를 위해서는 지속적인 평탄성 측정 및 모니터링이 중요하다. 우리나라 일반국도의 경우 자동화된 포장조사장비를 이용하여 포장상태를 측정하여 관리하고 있는데, 이러한 자동화된 조사장비들은 매우 고가여서 보유대수가 부족하므로 지자체 등에서는 운영하기가 어려운 상황이다. 또한 평탄성은 도로 등급이나 사용 목적 및 용도 등에 따라 정밀도를 달리하여 측정하고 운영할 수 있어야 하지만 아직 이러한 적용은 하지 못하고 있는 상황이다. 본 연구에서는 기존에 개발된 저가의 장비를 이용한 평탄성 측정의 가능성을 확인하였다. 먼저 운행차량의 중량측정을 위한 운행차 하중측정 장치에 대해 살펴보고, 이 장치에서 사용되는 가속도계를 이용한 종방향 이동거리에 대한 도로구배의 측정이 가능함을 확인하였다. 도로구배 측정 결과를 θ값을 이용하여 고도 데이터로 변환하면 노면의 프로파일 형상을 얻을 수 있으며 이를 활용하면 그 구간에 대한 평탄성 측정이 가능할 것으로 파악되었다.