Comparison of the unit mass discharge from wastewater treatment facility in the industrial park with the estimation methods
The predictive capacity of wastewater treatment facility in the industrial park was estimated by the traditional method and on-the-spot survey such as certification of wastewater report and the invoices of water supply and ground water supply. The ratios of a converted wastewater to supplied industrial water between traditional method and on-the-spot survey in the estimation methods were different. By using traditional method, the business type of clothes, accessary and fur production had 77.18 % of waste ratio of wastewater and 10.72 m3/day·1000 m2 unit mass of wastewater as the highest among 9 business types. With the respect to the on-the-spot survey, food manufacturing business type had 75 % of waste ratio of wastewater and 8.35 m3/day·1000 m2 unit mass of wastewater as the highest values. The amount of wastewater from on-the-spot survey method was 541 m3/day less than one from traditional method.