검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 7

        2.
        2014.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Fire detectors are designed to minimize loss of life from a fire alarm system as an alarm to help evacuate more quickly until the completion of the evacuation alarm should be continued. the purpose of such alarms in order to achieve the characteristic fire heat release rate reaches a certain level, or when a certain time has elapsed, when the heat detector is to be alarms to answer. Requires a quick response, it is desirable to install the sensor as much as possible, but taking into account the cost of installation problems by engineering approach to minimize the quantity and rapidity of detection capability should be increased. In order to increase the rapidity of fire detectors in a room according to the height of the sensing period is to be maintained the optimum distance of the fire detector detects characteristics should be considered. Differential spot-type heat detectors installed domestic basis, depending on the type of sensor that can detect one sensor area is limited and less than 4m ceiling height regulations and simply double the number in excess of 4m and intended to be installed
        4,200원
        3.
        2014.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study is performed to determine the priorites of the evaluation factors for the improvement of fire emergency medical service by increasing it’s efficiency to protect the people’s lives effectively, and by recognizing it’s mid-long term development. Based on the output of the analysis, the critical evaluation factors of the fire emergency medical services to be improved shall be identified, and shall be intended to use strategically for increasing the efficiency of all the activity in the EMT service, and also for providing the basic date to product and manage the good quality services. To calculate the priority of the evaluation factor for each level as shown on this study, AHP(anaysis hierarchy process) with pairwise comparison method is applied. According to the priority analysis for the evaluation factors in main category (evaluation zone), ‘medical service professional aspect’ is recognized as highest one, and ‘service infrastructure aspect, ‘service management aspect’ are indicated in order. According to the priority analysis for the evaluation factors in evaluation index, ‘professional personal arrangement’ in the service infrastructure aspect, ‘appropriateness and timeliness of emergency medical care’ in the medical service professional aspect, and ‘clinical training’ in the service management aspect are respectively recognized as most important factors.
        4,000원
        5.
        2014.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Using a high-rise building water piping after hydrostatic test of the reliability of the leak to be completed if the pressure is maintained until the leak is not commercially available considered. Due to the nature of high-rise buildings and the construction period will take several years from the lower levels of use of the water supply and fire fighting water pipe construction is in progress, the order of which I do most of the first pipe to the construction and more than three years. So kind of riser pipe is complete, install the valve in the basement by installing an automatic pump to maintain a constant pressure after hydrostatic test and after each floor plumbing piping is complete, the progress of the hydrostatic test without undergoing a separate branch pipe the valve is opened automatically when the number of the pressing pressure of the structure. I kind of do and keep working pressure of pipe until the completion of the construction work to keep the damage to human error when it is intended to prepare. In winter, the frost protection and an alternative to drainage water pipe is damaged or deformed, even if unaware of the finishing work to the building, the use of the damage caused by a leak in a after construction of finish work to be expected. Alternative to reduce this damage if the pressure test without fear of freezing to help maintain long-term commercial pressures may be considered.
        4,000원
        6.
        2014.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Advanced Safety Management System(SMS) of Korea Railroad Corporation for risk management should be established applying contents-centered domestic standard according to Railway Safety Act and process-centered international standards suggested by Lloyd's Register Company. Besides, laws, regulations, guidelines and manuals which are optimized for each sector should be systematically integrated to strengthen the consistency of SMS of KORAIL. New safety regulations and guidelines for safety management/train operations/maintenance should be established according to the safety policy of KORAIL to boost effective field work by regulations, guidelines, manuals, etc. The advanced Safety Management System will lead KORAIL as a competent global enterprise with its boosted reputation in the international railway market.
        4,000원
        7.
        2007.06 KCI 등재 서비스 종료(열람 제한)
        GPS 환경에서 다중경로 신호는 의사거리 측정 정확도의 성능을 감소시키므로 GPS에 기반한 응용에서 위치 성능 감소로 나타나며, 이는 특히 고층 건물이 많은 도심환경 및 수면에 의한 반사가 많은 해양에서 문제가 된다. 다중경로 신호는 GPS 수신기 내부 상관기에서 상관 함수의 Early-Late 간 비대칭을 유발하므로, 본 논문에서는 Late 상관 값의 비대칭 정도를 보상하여 다중경로 오차를 제거하기 위한 가중 상관기 구조를 소프트웨어 GPS 수신기를 이용하여 구현하고, 그 성능을 평가하였다. 가중 상관기는 2개의 상관 암으로 이루어진 다중 상관기를 사용하여 상관함수의 비대칭 여부를 판단하고, 비대칭성을 감소시키기 위한 보정치를 생성한다. 이 구조는 다중 상관기에 비하여 연산 처리량 부하는 감소시키는 반면, 비슷한 다중경로 오차 제거 성능을 제공한다. 본 논문에서는 다중경로 신호 생성 블록을 포함한 GPS 신호 발생기와 가중 상관기 구조를 포함한 소프트웨어 GPS 수신기를 이용하여 다중경로 오차 제거 성능을 검증하였다. 실험을 통하여 가중 상관기가 일반 상관기와 협대역 상관기보다 더 나은 오차 제거 성능을 보임을 확인하였다.