검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 50

        3.
        2024.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study provides a micro-level analysis of the changes in Cheongnyong-dong, aiming to identify the interactions between function and form within the historical flow of urban architecture. Focusing on the characteristics of urban architecture in Cheongnyong-dong, this research particularly examines the transformations in layout and façade from the 1970s to the 1990s. By analyzing materials and windows of both the front and rear façades, as well as the differences between the first and upper floors, the study sheds light on the evolving patterns of urban architecture. From the 1970s to the 1990s, residential buildings accelerated changes in urban architecture by reinforcing unity in materials and creating more volumetric façades. In contrast, neighborhood facilities and mixed-use buildings displayed a clearer distinction between commercial and residential functions, with pronounced differences in material usage between the first and upper floors, as well as between the front and rear façades. This implies that while residential buildings change based on plots, commercial and mixed-use buildings transform according to their functions, resulting in varying speeds of physical change.
        4,900원
        19.
        2020.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The general contractor business in South Korea settled in the railway construction during the Daehan Empire, but depending on the construction intention and circumstances of the railroad, relationship among employer-contractor-subcontractor and their roles under the system of the construction process had changed. At the time of laying the Gyeongin and Gyeongbu-rail, the Empire, which had no capital and technology, passed all the power and responsibility of the rail laying to the contractor, who was involved in most of the process. After this, the empire tried to lay Gyeongui-railroad without the help of other countries. Japan prepared for the Russo-Japanese War and decided to construct the railway rapidly, and completed the railway in parallel with direct management work and contract work. From that time on, the general contractor would only do the work. During the construction of railroad in Daehan empire, the general contract business system was established. The ambiguous process was sorted out and divided. At this time, subjects in charge of design and construction has been divided. The internal organization of the project owner and the contractor were organaized and specialized.
        4,300원
        1 2 3