The presence of technological voids in deep geological repositories for high-level radioactive nuclear waste can have negative effects on the hydro-mechanical properties of the engineered barrier system when groundwater infiltrates from the surrounding rock. This study conducted hydration tests along with image acquisition and X-ray CT analysis on compacted Korean bentonite samples, which simulated technological voids filling to investigate the behavior of fracturing (piping erosion) and cracking deterioration. We utilized a dual syringe pump to inject water into a cell consisting of a bentonite block and technological voids at a consistent flow rate. The results showed that water inflow to fill technological voids led to partial hydration and self-sealing, followed by the formation of an erosional piping channel along the wetting front. After the piping channel generated, the cyclic filling-piping stage is characterized by the repetitive accumulation and drop of water pressure, accompanied by the opening and closing of piping channels. The stoppage of water inflow leads to the formation of macro- and micro cracks in bentonite due to moisture migration caused by high suction pressure. These cracks create preferential flow paths that promote longterm groundwater infiltration. The experimental test and analysis are currently ongoing. Further experiments will be conducted to investigate the effects of different dry density in bentonite, flow rate, and chemical composition of injected water.
The engineered barrier system (EBS) for deep geological disposal of high-level radioactive waste requires a buffer material that can prevent groundwater infiltration, protect the canister, dissipate decay heat effectively, and delay the transport of radioactive materials. To meet those stringent performance criteria, the buffer material is prepared as a compacted block with high-density using various press methods. However, crack and degradation induced by stress relaxation and moisture changes in the compacted bentonite blocks, which are manufactured according to the geometry of the disposal hole, can critically affect the performance of the buffer. Therefore, it is imperative to develop an adequate method for quality assessment of the compacted buffer block. Recently, several non-destructive testing methods, including elastic wave measurement technology, have been attempted to evaluate the quality and aging of various construction materials. In this study, we have evaluated the compressive wave velocity of compacted bentonite blocks via the ultrasonic velocity method (UVM) and free-free resonant column method (FFRC), and analyzed the relationship among compressive wave velocity, dry density, thermal conductivity, and strength parameter. We prepared compacted bentonite block specimens using the cold isostatic pressure (CIP) method under different water content and CIP pressure conditions. Based on multiple regression analysis, we suggest a prediction model for dry density in terms of manufacturing conditions. Additionally, we propose an empirical model to predict thermal conductivity and unconfined compressive strength based on compressive wave velocity. The database and suggested models in this study can contribute to the development of quality assessment and prediction techniques for compacted buffer blocks used in the construction of a disposal repository.
When a rapid groundwater inflow is introduced from the adjacent rock mass in the early stage of disposal, hydraulic pressure build-up occurs, which may cause piping erosion at the buffer material itself and the interface of the gap-filling material. Such piping erosion in compacted bentonite buffer via interaction between the buffer and the adjacent rock mass may deteriorate the performance of the buffer material. Therefore, it is necessary to understand the conditions and scenarios in which the piping phenomenon around the buffer material occurs for the long-term health of the repository. In this study, laboratory-scale experimental tests of piping erosion in buffer and interfacial rock was introduced. ø 100 mm × 200 mm height compacted bentonite specimens were placed in a cylindrical acetal cell, and the distilled water was continuously injected at a flow rate of 0.068 L/min using a dual syringe pump. The inflow of water was generated from the bottom and side cell of buffer material. During water injection, injected water pressure and amount were measured with visual observation. The results showed that the external saturation of buffer firstly occurs followed by piping crack generation along the wetting front. The additional piping channels were generated and merged with others. As the injection stopped, the swelling and self-sealing behavior of buffer material were observed. Moreover, X-ray CT scanning of the cell was conducted after the piping simulation to analyze the piping channels and saturation depth. The results highlight the piping erosion phenomenon mainly occurs due to the presence of a gap outside the buffer material. Further experimental cases is need to comprehensively understand piping phenomena in buffer material for assessing the long-term stability of underground radioactive waste disposal systems.