This study aims to present a performance based design for apartments through evacuation safety assessment and damage impact assessment due to acrylonitrile leakage. In the evacuation safety evaluation, ASET was analyzed as 25 min or more and 60 min or less when the ventilation rate was once per hour, and RSET was 22.6 min. Evacuation safety is satisfied when the number of ventilation per hour is less than 1, so it is necessary to design the number of ventilation to be 1 or less. In the damage impact assessment, the 0% structural collapse rate due to overpressure was measured to be between 71m and 90m, and the 0% fatality rate due to radiant heat was measured to be between 136m and 353m. Therefore, maintain a safe distance of 353m or more.
This study aims to present safety distances by the damage impact assessment of the leakage of propylene oxide. As a result of the experiment, the pressure 1psi range was 52m to 169m, the radiant heat 18kW/㎡ range was 63m to 163m, the AEGL-2 range was analyzed as 224m to 414m, and the fire ball diameter was analyzed to be 45m to 121m. Additionally, the extent of damages was proportional to the amount of propylene oxide stored or handled. The safe distance for a 10% lethality due to overpressure and radiant heat was calculated to be 134m, and the safe distance for a 0% lethality was 169m. Toxicity was measured at 134m with a lethality 0%. Therefore, the safety distance due to leakage of propylene oxide is calculated to be between 134m and 169m.
Looking at recent safety accidents in buildings, most of them due to lack of FM expertise, and this is due to human resources. In each all industry areas, some companies are competitive, representational, and leading in the market through long-term expertise and research in their respective fields. In the field of FM industry, some companies offer core-competencies in internal and external innovative building management through competition with others. However, old custom and old management form still exist in the FM field. However, an old custom and old management system still exist in the FM field; it forces cost-cutting and caused by carelessness in technical development competitiveness and safety measures. The government control by safety inspection and facility inspection through legislation of building management, but the management is still weak as a side of in the facility management section due to inspect sth as a mere formality and submit a paper report. These facts exist different kind of usage of the building have a three-party encounter between a building owner, user, and FM enterprises. In this research identify survey, especially building owner (manager)’s choice perception priority for optional factors to choose FM enterprises. Based on this, FM enterprises will be forced to seek a new dimension for better building management. In this light, the purpose of the research is to shape changes in the FM market culture safely and providing better service in building management and understanding building owner's insight through this research's information.