검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 25

        21.
        2016.04 서비스 종료(열람 제한)
        The purpose of this study was to investigate deformation and reduction of initial clamping force in slip critical type connection under fatigue loading. And, the parameters of this study were the different clamping force and friction coefficient of surface of plate. As a result, the clamping force of all specimens were generally decreased in comparison with initial values under fatigue loading.
        22.
        2013.10 서비스 종료(열람 제한)
        The nomal method of field load test for bridge in the guide book is too complex to execute high-speed railroad bridge. So, the modificated method by regular schedule train is researched with the raw data of 14 bridge executed in the year of 2011 & 2012. By daily test train, the static measurement are within a range the relative error 1.2% and the common load capability are caculated within a range the relative error 1.4% comparing the nomal method.
        23.
        2013.09 서비스 종료(열람 제한)
        시설물의 안전관리에 관한 특별법에 의거 철도교량의 공용내하력을 산정하기 위한 현장재하시험을 실시함에 있어 철도 특성상 유지보수 및 각종 검측이 야간이 발생되어 최소 1개월 전에 시험일정 통보하여야 하며 일단 결정된 재하시험일정은 변경이 곤란할 뿐만 아니라 시험 당일 기후 악조건(장마 등)시에는 계측데이터에 예상치 않은 오차가 포함될 수밖에 없으며 1일 시험시간이 3시간 내에 제한되어 시험 중 계측 게이지에 문제 발생 시 대처할 수 없는 실정이다. 특히 고속철도는 일반철도에 비해 상기의 현장재하시험 조건이 더욱 더 까다로운 상태이다. 또한 주기적인 정밀안전진단시만 현장재하시험을 실시하는 경우에는 정밀안전진단 주기에만 과학적 유지관리가 가능하여 구조물의 기능저하, 보강 확인 등의 평상시 과학적 유지관리가 필요한 경우에는 상시운행열차의 유지관리 기준값이 없으므로 소요경비 및 시간이 과다하게 필요한 특정계획(일정통보, 열차수배)에 의한 재하시험을 실시할 수밖에 없는 실정이다. 고속철도 교량은 도로교 혹은 일반철도에 비해 거의 동일한 크기의 하중이 정해진 레일을 주행하는 조건이므로 하중의 작용조건이 명확하다. 이러한 이점을 적극 활용하기 위하여 정밀안전진단 세부지침서에 제시된 재하시험열차를 이용한 표준 현장재하시험 방법보다 상시운행열차을 이용한 개선된 현장재하시험의 적용 가능성을 파악해볼 필요가 있다. 여기에서는 기존에 실시하였던 재하시험열차에 의한 계측결과와 상시운행열차에 의한 계측 결과를 분석하여 상시운행열차에 의한 현장재하시험 가능성에 대해 분석하여 보았다.
        24.
        2012.11 서비스 종료(열람 제한)
        According as tracks are twisted on running, wheel loads applied to outer rail are increased on curved track. Canting on tracks considering the balance cant allows to have permissible cant deficiency. The test bed area of Ho-Nam high railway is planed for 400km/h Speedup test, cant deficiency is expected to generate centrifugal load in the curve. Therefore, Korean design criteria recommend to increase maximum 20% of wheel load. This study shows that normalized wheel load variations are analyzed its stationary in inner and outer rail when centrifugal forces in outer rail of a curve are caused by curve radius, cant, velocity. Vertical wheel loads are reviewed on the behaviors of each structural element according to the increase of velocity.
        25.
        2007.05 KCI 등재 서비스 종료(열람 제한)
        편심 하중을 받는 철근 콘크리트 기둥에서 띠철근과 콘크리트 강도의 영향을 파악하기 위하여 콘크리트 압축강도, 띠철근 배근간격 및 형상, 편심비를 주요 변수로 하여 단면 200mm×200mm의 시험체 24개를 실험하였다. 이러한 연구를 통하여 콘크리트 기둥은 편심거리비, 띠철근 배근간격, 띠철근 배근형태 등에 관계없이 콘크리트 강도가 증가할수록 취성적으로 거동하였고, 편심거리비가 증가할수록 띠철근 배근에 의한 연성 증가 효과는 감소함을 알 수 있었다. 띠철근 배근간격이 100mm에서 30mm로 줄어들 경우, 최대 내력은 10~20% 증가하였으며, 최대 내력 이후에도 보다 연성적으로 거동하였다. 그러므로 고강도 콘크리트 기둥에서 적당한 연성과 강도를 확보하기 위해서는 일반강도 콘크리트에 비하여 더 많은 띠철근 체적비와 밀실한 띠철근 배근이 필요하였으며, 띠철근 배근 간격만을 제한하는 현재의 대한건축학회 내진 기준은 고강도 콘크리트 사용 시 띠철근의 배근 효과와 부재 연성 확보 측면에서 불안전하였으며, 띠철근을 콘크리트 강도와 연계하는 새로운 내진 기준이 필요한 것으로 나타났다.
        1 2