검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 1,225

        101.
        2023.05 구독 인증기관·개인회원 무료
        The domestic Nuclear Power Plant (NPP) decommissioning project is expected to be carried out sequentially, starting with Kori Unit 1. As a license holder, in order to smoothly operate a new decommissioning project, a process in terms of project management must be well established. Therefore, this study will discuss what factors should be considered in establishing the process of decommissioning NPPs. Various standards have been proposed as project management tools on how to express the business process in writing and in what aspects to describe it. Representatively, PMBOK, ISO 21500, and PRICE 2 may be considered. It will be necessary to consider IAEA safety standards in the nuclear decommissioning project. GSR part 6 and part 2 can be considered as two major requirements. GSR part 6 presents a total of 15 requirements, including decommissioning plans, general safety requirements until execution and termination. GSR part 2 presents basic principles for securing the safety of nuclear facilities, and there are a total of 14 requirements. Domestic regulatory guidelines should be considered, and there will be largely laws and regulations related to the decommissioning of nuclear facilities, guidelines for regulatory agencies, and guidelines and regulations related to HSE. The Nuclear Safety Act, Enforcement Decree, Enforcement Rules, and NSSC should be considered in the applicable law for nuclear facilities. Since the construction and operation process has been established for domestic decommissioning project, there will be parts where existing procedures must be applied in terms of life cycle management of facilities and the same performance entity. As a management areas classification in the construction and operation stage, it seems that a classification similar to Level 1 and Level 2 should be applied to the decommissioning project. This study analyzed the factors to be considered in the management system in preparing for the first decommissioning project in Korea. Since it is project management, it is necessary to establish a system by referring to international standards, and it is suggested that domestic regulatory reflection, existing business procedures, and domestic business conditions should be considered.
        102.
        2023.05 구독 인증기관·개인회원 무료
        Among the twenty six nuclear power plants in Korea, twenty four plants are currently in operation excluding the two permanently shut-down Kori #1 and Wolsung #1 plants. The decommissioning process includes many tasks such as cutting, decontamination, disposal and treatment. Among the tasks, because cutting is one of the tasks performed close to the target structure, there is a possibility for the workers to be exposed excessively to the radiation. There are representative large structures such as steam generators, nuclear reactors, reactor coolant pump, and pressurizer, made of metals, and radioactive concrete, made of concrete. Especially, compared to the trend of research to manage the radiation exposure of steam generators that are directly connected to pressurizers, the trend of research to manage the radiation exposure of pressurizers to workers is not satisfactory. Moreover, although there have been many studies on radioactive concrete, the studies to manage the radiation exposure to workers with a systematic cutting scenario are insufficient. In this study, radioactive concrete, a representative large structure made of concrete, was selected as the target for evaluation. The conditions for evaluation were cutting speed (1~10 m2/hr) and the time for cutting (permanent shutdown~30 years after the shutdown). A cutting scenario was developed by applying the situation for abrasive decontamination beforehand and Hot-to-Cold and Cold-to-Hot, and effort was made to derive a reasonable plan. The evaluation result derived were hourly radiation dose distribution of 1.19~0.103 mSv/hour and 1.29~0.0113 mSv/hour for a scenario without abrasive decontamination (in the order of Hot to Cold, Cold to Hot), and hourly radiation dose distribution of 0.547~0.0479 mSv/hour and 0.608~0.0522 mSv/hour for a scenario with abrasive decontamination. The maximum value of collective dose derived was 1.54E+04 mSv at the cutting time of permanent shutdown with cutting speed of 1 m2/hour in the Cold to Hot scenario before abrasive decontamination, and the minimum value derived was 5.15E+01 mSv at the cutting time of 30-year after the permanent shutdown with cutting speed of 10 m2/hour in the Hot to Cold scenario after abrasive decontamination.
        103.
        2023.05 구독 인증기관·개인회원 무료
        In case of Korea, unlike overseas nuclear power plants, adjacent units are located in permanently stopped nuclear power plants. Radioactive substances from airborne and liquid effluents are released into the environment from the NPP, and the radioactivity of the released substances must be reported to the regulatory authorities. Radioactive effluents are released into the environment not only in operation but also after permanent shutdown. Due to domestic conditions in which multiple units exist on the same site, it is necessary to consider radioactive effluents generated after permanent shutdown of NPPs. In particular, liquid effluent may have an increased tritium concentration due to draining the spent fuel pool. This paper summarizes the annual liquid emissions of PWR power plants that have been permanently shut down. The data was obtained from the Nuclear Regulatory Commission’s (NRC) annual radioactive effluent release report, which provides information on the annual emissions power plants into the environment. The liquid emissions of each plant were organized into an annual table, providing an overview of the amount of liquid released by each plant. This study aims to raise awareness about the potential environmental impact of permanently shut down nuclear power plants and the need for proper management of their liquid emissions. The findings of this study can used by operator, policymakers, and other stakeholders to make informed decisions regarding the decommissioning and management of nuclear power plants.
        104.
        2023.05 구독 인증기관·개인회원 무료
        Concrete decontamination tools capable of removing the nuclear contaminated surface are necessary to minimize the amount of concrete waste generated in the process of decontamination and dismantling of nuclear power plants. Laser scabbling is a decontamination technique that removes the contaminated surface layers concrete surface by inducing internal explosion. The application principle of laser scabbling technology uses the porous nature of concrete including moisture. When high thermal energy is applied to the concrete surface, an explosion at pores is induced along with an increase in water vapor pressure. High-powered laser beam can be an effective induction source of local explosive spalling on concrete surface. In this study, the scabbling test using a 5 kW highpowered fiber laser was conducted on the concrete blocks to establish the optimal conditions for surface decontamination. It was also measured the volume peeled off the concrete surface under the conditions of two different laser head speeds. Furthermore, we tested the removal efficiency of radioactive concrete particles generated during high-power fiber laser scabbling process. A 5 kW laser beam was applied to the concrete surface at two different laser head speeds - 120 mm/min and 600 mm/min. The laser beam repeatedly moved 200 mm horizontally and 40 mm vertically within the concrete block. The amount of surface concrete removed from concrete block was calculated from the measurement of the volume and mean depth using a 3D scanner device (laser-probed Global Advantage 9.12.8(HEXAGON)) for the two different the laser head speeds. By increasing the laser head speed, less explosive spalling occurred due to shorter contact time of the laser beam with the concrete. The laser head speed of 600 mm/min reduced about 89% of the waste generated by shallow depth of scabbling as compared to the waste generated at the laser head speed of 120 mm/min. The fiber laser scabbling system was developed for surface decontamination of radioactive concrete in nuclear power plants. Tests were performed to find the optimum parameters to reduce the generation of particulate waste from the contaminated concrete surface by controlling the laser head speeds. It was confirmed that the wastes from surface decontamination was reduced up to 89% by increasing laser head speed from 120 mm/min to 600 mm/min. It was also observed that the cylindrical tube effectively vacuumed the debris generated by the explosive spalling into the collector. Removal efficiencies of concrete particles were measured greater than 99.9% with ring blower power of 650 air watt of the filter system.
        105.
        2023.05 구독 인증기관·개인회원 무료
        Metal waste generated during the dismantling of a nuclear power plant can be contaminated with radionuclides. In general, the internal structure is very complex. Thus, metal waste requires various cutting processes. When metal waste is cut, aerosols are generated. Aerosols are generally various particles of very small size suspended in the working area and remain for a considerable period. This may cause internal exposure of workers due to inhalation of radioactive aerosols generated when cutting radioactive metal waste. This study investigated various cutting processes and the size distribution of aerosols generated during the cutting process. The cutting process is normally classified into thermal cutting, mechanical cutting, and laser cutting. Thermal cutting includes plasma, flame, and oxygen cutting. Mechanical cutting includes mechanical saws, cutters, nibblers, and abrasive water jets. Stainless steel, carbon steel, aluminum, and copper are commonly used as cutting materials in nuclear power plants. The size of the aerosol generated from cutting showed a very diverse distribution depending on the cutting methods and cutting materials. In general, aerosol size is distributed within 0.1-1 μm. This size distribution is different from the 5 μm aerosol size suggested by the ICRP Publication 66 Lung model. These results show that it is necessary to conduct further studies on the size of aerosols generated when decommissioning nuclear power plants.
        106.
        2023.05 구독 인증기관·개인회원 무료
        The type of radioactive waste that may occur in the process of nuclear power plant dismantling can be classified into solid, liquid, gas, and mixed waste. In addition, according to the level of radioactivity, it can be divided into high level, intermediate level, low level, and clearance level waste. In the case of solid radioactive waste, it is necessary to secure disposal suitability in order to deliver it to a disposal facility, so safe and efficient treatment of a large amount of radioactive waste generated during decommissioning is one of the most important issues. For the treatment of radioactive waste generated during decommissioning, technologies in various fields such as cutting, decontamination, melting, measurement, and packaging are required. Therefore, this study intends to present and application plan for decommissioning domestic nuclear power plants through overseas case studies for the treatment of radioactive waste expected to occur during nuclear power plant decommissioning.
        107.
        2023.05 구독 인증기관·개인회원 무료
        The concept of clearance is to manage radioactive waste by incineration, reclamation, or recycling as non-radioactive waste, excluding those found to have a concentration of less than the allowable concentration of clearance. Among the types of waste subject to clearance, concrete is managed by recycling and landfill, metal by recycling and reuse, combustible materials by incineration, and soil by landfill. In Korea, clearance has been implemented in earnest since 2000, and the types and quantity of waste subject to clearance are increasing. For clearance, the nuclear-related operator submits its clearance plan to the regulatory body, and the regulatory body reviews the clearance plan and notifies the operator of its suitability. Since a significant amount of radioactive waste generated when decommissioning nuclear power plants is expected to be classified as clearance waste, this study will present clearance waste disposal measures for nuclear power plant through a review of overseas cases related to clearance.
        108.
        2023.05 구독 인증기관·개인회원 무료
        Laser cutting has been recognized as one of key techniques in dismantling nuclear power plants as it has several advantages such as a remote operation and a reduced secondary waste. However, it generates a significant amount of aerosols that can pose a health risk to workers and further induce environmental pollution during the cutting operation. Thus, understanding the aerosol characteristics generated by the laser cutting is crucial for implementing an effective cutting operation and reducing the exposure to these hazardous particles. In this work, we established a methodology to collect the aerosols and investigate their properties in the laser cutting operation. We built an integrated laser cutting system for aerosol analyses, consisting of a high-power laser cutting module, a metal sample holder, an aerosol collector, and a closed chamber. We expect that this system will offer an opportunity for in-depth understanding of the aerosol properties, by connecting it with desired type of aerosol analysis platforms, and further safe dismantling operation of the nuclear power plants.
        109.
        2023.05 구독 인증기관·개인회원 무료
        Domestic nuclear power plants developed the scaling factors for the radioactive waste generated from 2004 to 2008 for the first time. Afterwards, the effectiveness of continuous application of the scaling factors have been evaluated for newly generated radioactive waste over the past two years. It was confirmed that most of the initially developed scale factors were effective within a factor of 10 principle, which is an acceptable range. The scaling factors were updated using the analysis data base from 2004 to 2016. A scaling factor refers to the calculated abundance ratio between Key (Easy-to- Measure) and DTM (Difficult-to-Measure) nuclide at the time of generation of radioactive waste based on the source term in the reactor of an operating nuclear power plant. The effectiveness of continuous application of scaling factors can be evaluated at regular intervals regardless of operation status or when there are events that change scaling factors during nuclear power plant operation, such as zinc injection, large-scale facility replacement, and long-term shutdown etc. Even in the case of a permanently shut down nuclear power plant in which fuel is withdrawn from the reactor and generation of new nuclides by nuclear fission and radiation has stopped, periodic verification is conducted to confirm whether the scaling factor developed before permanent shutdown can be effectively applied to the radioactive waste generated after permanent shutdown. However, depending on the nuclear power plant decommissioning strategy or conditions, the period of permanent shutdown prior to decommissioning can be very long, so preparations are needed to ensure the appropriateness of scaling factor operation. In the case of domestic nuclear power plants, Kori Unit 1, a light water reactor, was permanently shut down in June 2017, and as a heavy water reactor nuclear power plant, the permanent shutdown of Wolseong Unit 1 was finally decided in December 2019 after twists and turns including large-scale facility replacement and long-term shutdown. In this paper, we have predicted when the scaling factors will change significantly due to radioactive decay and the difference in halflife between the Key and DTM nuclides over time after permanent shutdown. We also have tried to find appropriate countermeasures for the operation of scaling factors during permanent shutdown period, such as updating scaling factors or applying correction factors.
        110.
        2023.05 구독 인증기관·개인회원 무료
        As the decommissioning of nuclear power plants progresses, interest in the inevitably generated radioactive waste is also increasing. Especially, because the containers of ILW packages are significantly more expensive than the containers of LLW packages, the special attention should be focused on minimizing the number of the containers of ILW packages. The radiation dose limit for packaging of ILW shall not exceed 2 mSv/h and 0.1 mSv/h on contact and at 2 m, respectively in South Korea. Meanwhile, The DEMplus provides various environmental geometry and all properties such as materials, absorptions, and reflections and the estimation of the radiation dose rates is based on the radiation interactions of the designed 3D geometry model. With the consideration of the radiation dose rate by using DEMplus and its strategy of packaging and cutting plan, the number of containers for ILW packages generated from decommissioning of Reactor Vessel Internal (RVI) of a nuclear power plant that has been in operation for decades was optimized in this paper. The modular shielded containers (MSC) with shielding inserted were used for radioactive wastes that require shielded packaging. In order to verify the accuracy of the estimated radiation dose rate by using DEMplus, the estimated results were compared with those obtained using MicroShield. The trends of the estimated radiation dose rates using DEMplus and the estimation of MicroShield were similar to each other. The results of this study demonstrated the feasibility of using DEMplus as a means of estimating the radiation dose limit in packaging plan of the radioactive waste.
        111.
        2023.05 구독 인증기관·개인회원 무료
        Korea currently has two permanent shutdown Nuclear Power Plants (NPPs), and the decommissioning project is expected to begin soon, starting with the first commercial NPP. The decommissioning project will eventually be the disposal of radioactive waste in the final stage of the work, and in that respect, proper tracking and history management should be well established in the management of waste. This is in line with the guidelines that regulatory agencies should also properly manage radioactive waste. Therefore, this study intends to examine the factors that should be considered in terms of tracking and management of radioactive waste in decommissioning nuclear facilities. The starting and final point of tracking radioactive waste generated during decommissioning is the physical inventory of the current as-is state and the final container. In this respect, the tracking of waste starts from the beginning of the dismantling operation. Thus, at the stage of approval of the decommissioning work, it may begin with an ID scheme, such as the functional location in operation for the target System, Structure, and Components (SSCs). As the dismantling work progresses, SSCs will be classified by nature and radiological level, which will be placed in containers in small packaging units. At this time, the small package should be given an ID. After that, the dismantling work leads to the treatment of waste, which involves a series of operations such as cutting, decomposition, melting, and decontamination. Each step in which these tasks are performed will be placed in a container, and ID assignment is also required. Until now, the small packaging container is for transfer after each treatment, and it is placed in the storage container in the final stage, at which time the storage container also gives a unique ID. Considerations for follow-up management were reviewed assuming solid waste, which is the majority of dismantled radioactive waste considered in this study. The ID system should be prepared from the start of the dismantling work, ID generation of the small transporting container and ID generation of the final disposal container during the intermediate waste treatment process, and each ID generation of the previous stage should be linked to each generation stage. In addition, each ID must be generated, and the definition of the grant scheme and attributes is required.
        112.
        2023.05 구독 인증기관·개인회원 무료
        Transport packages have been developed to transport the decommissioning waste from the nuclear power plant. The packages are classified with Type IP-2 package. The IAEA requirements for Type IP-2 packages include that a free drop test should be performed for normal conditions of transport. In this study, drop tests of the packages were performed to prove the structural integrity and to verify the reliability of the analysis results by comparing the test and analysis results. Half-scale models were used for the drop tests and drop position was considered as 0.3 m oblique drop on packages weighing more than 15 tons. The strain and impact acceleration data were obtained to verify the reliability of the analysis results. Before and after the drop tests, radiation shielding tests were performed to confirm that the dose rate increase was within 20% at the external surface of the package. Also, measurement of bolt torque, and visual inspection were performed to confirm the loss or dispersion of the radioactive contents. After each drop test, slight deformations occurred in some packages. However, there was no loss of pretension in the lid bolts and the shielding thickness was not reduced for metal shields. In the package with concrete shield, the surface dose rate did not increase and there was no cracks or damage to the concrete. Therefore, the transport packages met the legal requirements (no more than a 20% increase of radiation level and no loss or dispersion of radioactive contents). Safety verifications were performed using the measured strain and acceleration data from the test, and the appropriate conservatism for the analysis results and the validity of the analysis model were confirmed. Therefore, it was found that the structural integrity of the packages was maintained under the drop test conditions. The results of this study were used as design data of the transport packages, and the packages will be used in the NPP decommissioning project in the future.
        113.
        2023.05 구독 인증기관·개인회원 무료
        Fault activity acts as the greatest risk factor in relation to the stability of the radioactive waste disposal facilities and nuclear power plant site, and for this reason, geological studies on areas with past fault activity history must precede site evaluation studies. This study aims to trace the fault activity history of large fault zones, including the Yangsan fault in the southeastern part of the Korean Peninsula, where two major earthquakes occurred, and to obtain fault activity direction information that is the basis for stability evaluation. The 3D-Shape Preferred Orientation (SPO) of particles in the fault rock created by the earthquake was investigated to analyze the direction of fault plane activity, and the age of fault activity was estimated through Illite Age Analysis (IAA) analysis. It is expected that the large-scale fault activity information in the southeastern part of the Korean Peninsula obtained through the SPO and IAA analysis can be used as basic data for safety evaluation of existing or future nuclear power plants and radioactive waste facilities.
        114.
        2023.05 구독 인증기관·개인회원 무료
        The purpose of this study is to provide technical issues in upgrade and modification of fuel handling equipment at operating nuclear power plants. The improvement for safety function and performance enhancement of fuel handling equipment has been going on for 20 years since the early 2000’s. This improvement is recently focused on the replacement of components through the performance analysis and the operation and maintenance plan based on replacement cycle of its component. Additionally, it is required to secure spare parts so that it can be operated at all times with compatibility and standardization to other domestic nuclear power plants. The fuel handling equipment is consisted of refueling machine, upender and carriage of fuel transfer system, spent fuel handling machine, new fuel elevator and various tools, and the equipment are linked in systematic interlocks. Fuel handling is a critical task during a nuclear power plant refueling outage. Even minor component defects may stop operation of the whole system and have a significant impact on the overall system process. To achieve this goal, major components that are expected to be replaced for reliable operation are summarized as follows; 1) motor assembly with AC servomotors and driver for bridge, trolley and hoist of refueling machine and spent fuel handling machine, 2) winch motor and drive for upender and carriage of fuel transfer system, 3) operator control console with a HMI PC base PLC (Programmable Logic Controller) control system, 4) positioning and load weighing sensors such as an encoder and a load cell with its support for periodic calibration and maintenance, 5) main power drapped style festoon cable assembly for bridge of refueling machine, 6) pneumatic control assembly for gripper operation of refueling machine, 7) active components (e. g., air motor, hydraulic cylinder and limit switch) to be removable and reinstallable without requiring the water level to be lowered. It is advisable to utilize such various information as it can help to improve reliability of fuel handling as a critical path in upgrade and modification of fuel handling equipment at operating nuclear power plants.
        115.
        2023.05 구독 인증기관·개인회원 무료
        The global nuclear nonproliferation regime has developed over the past 50 years based on the Treaty on the Non-Proliferation of Nuclear Weapons (NPT) with three pillars: disarmament, nonproliferation and peaceful use of nuclear energy. Due to climate change and energy security in recent years, nuclear energy has been in the spotlight as an electricity generation source, and many countries are paying attention to introducing nuclear power plants (NPP). Whereas exporters pursue profit by selling their NPP, international organisations and member states that seek nuclear nonproliferation are concerned with potential proliferation risks by expanding the nuclear power industry worldwide. Simultaneously, the member states’ right to peaceful use of nuclear energy has to be guaranteed as specified in NPT Article IV. Accordingly, the trade of nuclear power between the member states taking full responsibility is desirable from the nonproliferation perspective. This paper investigates whether the countries capable of exporting their nuclear power have complied with the global nuclear nonproliferation regime, deriving the role and position that South Korea is faced with, accordingly, has to take. The dynamics of exporters’ competitiveness are discussed, emphasising that compliance with the regime must be considered a qualification when exporting NPP. The achievement that South Korea has attained, fulfilling its role and responsibility under the regime, is highlighted. Since South Korea has developed the nuclear power industry in cooperation with the United States under the NPT and the ROK-US Agreement for Peaceful Nuclear Cooperation, the status quo of the two countries in the nuclear nonproliferation and industrial landscape is discussed. Among the newcomers who have officially announced the plan to introduce NPP, Saudi Arabia is put in a crucial position to aggregate or alleviate nuclear nonproliferation. To this end, the rationale for the ROK-US cooperation is proposed, evaluating the value of nuclear nonproliferation in support of exporting nuclear power.
        117.
        2023.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        이 글은 “미국과 같은 패권국은 왜 국제사법재판소의 창설에 주도적 역할을 했음에도 불구하고 그 권한에 제약을 가하는가, 또 패권국의 주 도로 창설된 국제재판소는 어떻게 패권국의 이익에 반하는 결정을 내리 게 되었는가?”의 질의를 분석한다. 이 글은 이러한 연구질의를 헌정질서 및 역사제도주의 이론을 적용하여 조망·분석한다. 역사제도주의는 특정 시점의 제도적 특성이 과거 시점의 결정적 사건 및 선택에 따른 ‘경로종 속성’에 주목하는 이론인바, 이 글은 특히 국제사법재판소의 기념비적 사 건인 니카라과-로커비 사건에서 작동한 ‘패권국-국제사법재판소 간의 상 호적 경로종속성’을 분석한다. 글의 분석은 국제사법재판소와 같은 사법 기관은 본질적으로 정치권력의 위임에 의해서 탄생하기는 하지만, 일정 한 제도적 성숙과정을 거치면 스스로의 권위와 절차를 가지고 정치권력 에 제약을 가하는 ‘수탁자(Trustee)’의 성격을 가진다는 것을 보여준다. 니카라과-로커비 사건에서 국제사법재판소의 해석 권한 행사는 그러나, 미국 국내 헌정질서 사례와 달리 정치권력의 준수를 이끌어내지 못하며, 사법심사권의 공고화로 이어지지는 못하였다. 이러한 과정은 결국, 패권 국과 국제재판소 간의 ‘상호적 경로종속성’의 작용을 보여주는 것이다.
        8,100원
        118.
        2023.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        세계적 선박 배출가스 저감에 대한 규제로 인해 항만 및 부두에서 육상전원공급장치(AMP, Alternative Marine Power)가 지속 적으로 사용되고 있다. 국내 또한 항만 대기질 개선 특별법에 따라 AMP의 사용이 의무화되고 있고, 다양한 친환경선박과 연계하여 활 용하도록 지속적인 시도를 하고 있다. 본 논문에서는 AMP를 통해 선내 전력을 공급하는 상황을 모델링 하여 AC Load Flow Analysis를 수행하였다. 이를 통해 선박에 전력이 공급될 때의 전기적 파라미터와 손실 등에 대해서 분석할 수 있다. 아울러 Transient Stability Analysis를 통해 계통의 사고 발생 시 선내 발전기를 통한 무정전전환에 대한 HSGT(High Speed Generation Transfer)의 한계값을 도출하고 이를 적용하였을 경우 결과에 대해 검토하였다.
        4,000원
        119.
        2023.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 논문에서는 LS-DYNA를 활용한 원자력발전소 설치 로드블록 차량 시뮬레이션 방법을 소개한다. 차량 강습 위협이 원자력 발전 소의 설계기준위협으로 포함된 이후로 차량 강습을 대비하기 위한 차량 방벽(Anti-ram barrier)의 성능 평가 소요가 커지고 있다. 차량 방벽은 일반적으로 충돌 실험을 통하여 성능을 인증 받는다. 하지만 국내에서는 차량 방벽에 대한 성능 시험 시설이 마련되어 있지 않 아, 시뮬레이션을 통한 차량 방벽 성능 검증이 필요하다. LS-DYNA는 충돌 시뮬레이션에 특화되어 있으며, NCAC를 비롯한 여러 기 관에서 충돌 시험과의 타당성 검증을 완료한 수치 모델을 배포하고 있다. 본 논문에서는 로드블록의 가장 핵심적인 차량 차단막 모듈 의 FE 모델을 구축하여 충돌 시뮬레이션을 수행하였다. 계산된 결과는 NCHRP 179의 차량 안전 시설 충돌 시뮬레이션 검증 기준을 준용하여 검증하였다. 그 결과 모래시계 에너지(hourglass energy)가 총 에너지의 5%를 넘지 않고 내부 에너지의 10%를 넘지 않는 것 을 확인하였으며, added mass가 1% 미만으로 기준인 10%를 넘지 않는 것을 확인하였다. 향후 FE 모델을 활용하여 물리적 방벽의 성 능을 평가하여 데이터 베이스를 구축할 예정이다.
        4,000원