검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 43

        42.
        1988.12 서비스 종료(열람 제한)
        Since the middle of 1950's when sea transportation service by container ship was established, containerization has been rapidly spread over the world with realization of intermodalism, and becomes an index of economy growth of a country. Our country has established Pusan Container Terminal at Pusan harbour in 1978 in step with worldwide trend of containerization, and is constructing New Container Terminal at Pusan outharbour which will be completed in 1990. This paper aims to make a quantitative analysis of the Pusan Container Terminal system through the computer simulation, especially focusing on its subsystems such as ship stevedoring system, storage system and transfer system. First, the capacity of various subsystems are evaluated and it is checked whether the current operation is being performed effectively through the computer simulation. Secondly, the suggestion is presented to improve the operation by considering the throughput that Pusan Container Terminal will have to accept until 1990, when New Container Terminal will be completed. The results are as follows ; 1) As the inefficiency is due to the imbalance between various subsystems at Pusan Container Terminal on the basis of about 1.2 million TEU of container traffic, transfer equipment level must be up to 33% for transfer crane, and free period must be reduced into 4/5 days for export/import. 2) On the basis of about 1.4 million TEU of container traffic, transfer equipment level must be up to 12% for gantry crane, 11% for straddle carrier and 66% for transfer crane, and free period must be reduced into 3/4 days for export/import. 3) On the basis of about 1.7 million TEU of container traffic, transfer equipment level must be up to 25% for gantry crane, 28% for straddle carrier and 100% for transfer crane, and free period must be reduced into 3/4 days for export/import. 4) On the basis of about 2 million TEU of container traffic, transfer equipment level must be up to 25% for gantry crane, 30% for straddle carrier and 110% for transfer crane, and free period must be reduced into 2/3 days for export/import, and it is necessary to enlarge storage yard.
        43.
        1988.04 KCI 등재 서비스 종료(열람 제한)
        From the point of view of safety of life and property at sea and the protection of the marine environment, the Vessel Traffic Management System along the Korea coastal waterway is inevitably introduced. But the establishing priority per area must be evaluated under the restricted budget. In this case, the estimated traffic flow has a major effect on priority evaluation. In the former paper <I>, an algorithm was proposed for estimating the trip distribution between each pair of zones such as harbours and straits. This paper aims to formulate a simulation model for estimating the dynamic traffic flow per area in the Korea coastal waterway. The model consists of the algorithm constrined by the statistical movement of ships and the observed data, the regression analysis and the traffic network evaluations. The processed results of traffic flow except fishing vessel are summarized as follows ; 1) In 2000, the traffic congestions per area are estimated, in proportion of ship's number (tonnage), as Busan area 22.3%(44.5%), Yeosu area 19.8%(11.2%), Wando-Jeju area18.1%(6.8%), Mokpo area 14.9%(9.9%), Gunsan area 9.1%(9.3%), Inchon area 8.1%(7.7%), Pohang area 5.5%(8.5%), and Donghae area 2.2%(2.1%). 2) For example in Busan area, the increment of traffic volume per annum is estimated 4, 102 ships (23 million tons) and the traffic flow in 2000 is evaluated 158, 793 ships (687 million tons). 3) consequently, the increment of traffic volume in Busan area is found the largest and followed by Yeosu, Wando-Jeju area. Also, the traffic flow per area in 2000 has the same order.
        1 2 3