검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 10

        1.
        2023.05 구독 인증기관·개인회원 무료
        For licensees who face the decommissioning project for the first time, even if they can utilize their experience in operation, they should be well prepared and assessed for the risks of dismantling activities reflecting the characteristics of decommissioning. This can be included in the risk management of the decommissioning project, but what we want to discuss in this study is the evaluation of the industrial risk of the actual work before the dismantling work is carried out. We would like to focus more on the review of dismantling activities subject to industrial risk assessment and a series of processes for risk assessment. The dismantling work plan will need to obtain approval from the supervisory department before work on the Systems, Structures, and Components (SSCs) can be carried out. At this time, risk assessment may be included among many safety-related required documents, which are divided into radiological and non-radiological risks. The target activities at Level 1 level can include preparation for dismantling and maintenance of facilities, dismantling big components, removing the contamination of concrete structures, managing radioactive waste, etc. In addition, it can be composed of preparation work, removal of connections, lifting/installation, cutting, radiation/radioactivity measurement, and withdrawal as detailed work stages of each item’s activities. For domestic nuclear decommissioning projects, two major performance organizations, licensees and contractors, must be considered. Regarding risk assessment, the licensee will have a supervisory department controlling decommissioning activities and an HSE department at the site, and a process will need to be established in consideration of the contractor’s work organization. Therefore, activities in the risk assessment process may be established. In this study, risk assessment was reviewed as safety-related matters to be considered when carrying out the dismantling work. Safety-related risk assessment is a necessary procedure for performing practical dismantling activities, and this should be considered well in advance. Therefore, work activities and criteria were established for risk assessment, and the performance process was assumed to apply them. In terms of the performance organization and the responsibilities and roles of the processes to be performed by each organization were constructed, and this can be referred to in the process of preparing for the decommissioning project.
        2.
        2022.05 구독 인증기관·개인회원 무료
        The remote dismantling system proposed in this paper is a system that performs the actual dismantling process using the process and program predefined in the digital manufacturing system. The key to the successful applying this remote dismantling system is how to overcome the problem of the difference between the digital mockup and the actual dismantling site. In the case of nuclear facility decommissioning, compensation between the virtual world and the real world is difficult due to harsh environments such as unsophisticated dismantling sites, radiation, and underwater, while offline programming can be proposed as a solution for other industries due to its sophisticated and controllable environment. In this paper, the problem caused by the difference in the digital mockup is overcome through three steps of acquisition of 3D point cloud in radiation and underwater environment, refraction correction, and 3D registration. The 3D point cloud is acquired with a 3D scanner originally developed in our laboratory to achieve 1 kGy of radiation resistance and water resistance. Refraction correction processes the 3D point cloud acquired underwater so that the processed 3D point cloud represents the actual position of the scanned object. 3D registration creates a transformation matrix that can transform a digital mockup of the virtual world into the actual location of a scanned object at the dismantling site. The proposed remote dismantling system is verified through various cutting experiments. In the experiments, the cutting test object has a shape similar to the reactor upper internals and is made of the same material as the reactor upper internals. The 105 successful experiments demonstrate that the proposed remote dismantling system successfully solved the key problem presented in this paper.