        1.
        2023.11 구독 인증기관·개인회원 무료
        KEPCO KPS is the contractor for the full system decontamination (FSD) of Kori Unit 1 and under preparation such as modification, lay out for equipment installation, setting up tie-in/out point for chemical injection and way to pressurize the system, of its successful performance. In this research, KPS introduced how KPS has designed and prepared for the FSD project and how will the chemical decontamination process be implemented. As described in the previous research, chemical decontamination process is planned to be conducted for three cycles and each cycle is consisted of oxidation, reduction, decomposition, and purification. Oxidation and reduction process were conducted at 90°C. Chemical decomposition and purification process were conducted at 40°C due to the damage of IX by the heat. If the decontamination result does not meet the target DF and the dose rate, additional cycle can be conducted. Expected volume of process water for FSD is 200 m3. Three systems have been designated as decontamination targets: reactor coolant system (RCS), residual heat removal system (RHRS), chemical volume control system (CVCS). For the steady flow rate, existed plant equipment such as reactor coolant pump (RCP) will be operated and modifications on some components will be conducted. Due to the limited space for installation, decontamination equipment and other resources are distributed to three different places. KPS designed the layout of equipment installed inside the containment vessel. The layout contains the information of shielding for highly radiated equipment such as IX and filter skid.
        2.
        2023.05 구독 인증기관·개인회원 무료
        It is reported that 48 pressurized heavy water reactors (PHWRs) are in operation, and 10 PHWRs including Wolsong-1 NPP have been permanently shut down in the world. In the case of PHWRs, which have been permanently ceased, they are managed through the delayed decommissioning method, but there are no cases of dismantling. Therefore, technology development is urgent for the effective decommissioning of PHWRs. Unlike PWRs, PHWRs are separated into coolant system and moderator system. Most of pipes and systems of coolant system are mainly composed of carbon steel, expect of the steam generator tubes which are composed of nickel alloy. On the other hand, the moderator system is composed of stainless steel. In the case of stainless steel, the inner layer of the oxide film is composed of chromium oxide, and the outer layer is composed of iron and nickel oxide in enriched. To remove two oxide layers, it is needs to different decontamination method, the coolant system can perform the system decontamination process through a reduction process, but in the case of the moderator system, the oxidation/reduction process is required because it has a material and oxide film similar to PWRs. In this study, this is evaluated the oxide film removal rate according to the type of stainless steel and temperature in order to remove the oxide film deposited in the moderator system. The experiments were carried out at temperatures of 60, 70, 80 and 90°C, with a concentration of 200 ppm of permanganic acid and nitric acid, and 2,000 ppm of oxalic acid, respectively. The results of the oxide film removal rate test for SUS304 showed 29% at 60°C, 38% at 70 and 80°C, and 41% at 90°C. For SUS403, the oxide film removal rate experiment results showed 62% at 60°C, 85% at 70°C, 94% at 80°C, over 99% at 90°C. The results showed that the removal efficiency of the oxide film increased as the temperature increased. Following the results of experimental, the optimum temperature of oxide removal in composed of the stainless steel material is to be 90°C for decontamination of PHWR.
        3.
        2022.10 구독 인증기관·개인회원 무료
        In this research, KPS manufactured Full System Decontamination (FSD) equipment, which is consisted of Oxidizing Agent Manufacturing System (OAMS), Chemical Injection System (CIS), RadWaste Treatment System (RWTS), Chemical Waste Decomposition & Treatment System (CWDS) and conducted demonstration test to prepare Decontamination and Decommissioning (D&D) project of Kori nuclear power plant in Korea. Each equipment of FSD was modularized due to the limited size of equipment hatch of Kori nuclear power plant. To simulate the expected circumstances in nuclear power plant such as usage of heater or position of each equipment, additional equipment was used. The chemical concentration and flow rate of process water for FSD were used as mentioned in the previous study by KHNP CRI. FSD was conducted for three cycles and each cycle was consisted of oxidation, reduction, chemical decomposition and purification. Oxidation and reduction process were conducted at 90°C. Chemical decomposition and purification process were conducted at 40°C due to the damage of UV lamp and IX by the heat. Total volume of process water for FSD demonstration test was 2.5 m2. KPS conducted decontamination performance review by calculating thickness reduction and weight loss of installed specimen. Operational review was conducted as if FSD test was conducted in the field based on the result of demonstration test. One of the most prioritized features is the workers’ safety. Also, the appropriate position of equipment needs to be considered to meet the required specification of component.
        4.
        2022.10 구독 인증기관·개인회원 무료
        Minimizing of radiation exposure for the operating and decommissioning personnel is a key indicator for safe operation of the NPP. This is reflected in the application of the ALARA (As Low As Reasonable Achievable) principle. The main objectives of radiation management during full system decontamination for NPP decommissioning are to reduce the exposure dose, prevent contamination of the body and reduce solid radioactive waste. In order to reduce exposure of workers, the dose rate should be reduced by installing a temporary shield after evaluating the dose rate for the piping, component and decontamination equipment of the decontamination path before full system decontamination. Furthermore, unnecessary exposure to radiation should be reduced by thoroughly entering and exciting the radiation area and limiting the access to the high-radiation area except for workers or persons concerned. A telemetric dosimetry system should be as installed to remotely monitor radiation levels at different locations within the decontamination flow path. Remote monitoring of radiation fields using teledosimetry worked well in assessing process effectiveness and is highly recommended. However, care must be taken to place the detectors in appropriate locations. For the prevent of body contamination, it is necessary to install a fence using a heat-resistant waterproof sheet to prevent leakage of highly radioactive contamination water. When replacing high-dose filters and ion exchange resins, it is necessary to remotely monitor to reduce the exposure dose of workers.
        5.
        2022.05 구독 인증기관·개인회원 무료
        The purpose of full system decontamination before decommissioning a nuclear power plant is to reduce radiation exposure of decommissioning workers and to reduce decommissioning waste. In general, full system decontamination removes the CRUD nuclides deposited on the inner surface of the reactor coolant system, chemical and volume control system, residual heat removal system, pressurizer, steam generator tube, etc. by chemical decontamination method. The full system decontamination process applied to Maine Yankee and Connecticut Yankee in the USA, Stade, Obrigheim, Unterweser, Nekawestheim Unit 1 in Germany, Mihama Unit 1 and 2 in Japan, Jose Cabrera Unit 1 in Spain, and Barseback Unit 1 and 2 in Sweden are HP/CORD UV, NP/CORD UV, and DfD. In this study, the quantity of 60Co radioactivity removal, metal removal, ion exchange resin and filter generation according to reactor power, surface area and volume of the full system decontamination flow path, and the decontamination process were compared and analyzed. In addition, the quantity of 60Co radioactivity removal by each nuclear power plant was compared and analyzed with the evaluation results of the 60CO radioactivity inventory of the Kori Unit 1 full system decontamination loops conducted by SAE-AN Enertech Corporation.
        11.
        2018.09 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        국내 가동원전 중 2-루프 가압경수로인 고리1호기는 약 40년 운전한 후, 2017년 6월 18일 영구정지되었다. 영구정지된 고리 1호기는 주요 해체작업을 수행하기전에 계통내 선량률을 저감시켜 작업자피폭을 최소화하기 위한 계통제염을 수행할 예정이다. 일반적으로, 계통제염 범위는 원자로압력용기, 가압기, 증기발생기, 화학 및 체적제어계통, 잔열제거계통 및 원자로 냉각재계통 주요배관을 포함한다. 이러한 계통 및 기기 등을 효율적으로 제염하기 위해서는 제염과정에서 원자로냉각재계 통내 유동특성을 평가할 필요가 있다. 계통제염을 위해 순환유량을 제공하는 방법은 다양하나, 본 논문에서는 잔열제거펌프 운전에 따른 고리1호기 원자로냉각재계통내 유동특성을 평가하였다. 잔열제거펌프를 이용한 계통제염은 원자로냉각재 내 유량의 불균형을 초래하여 계통내 기기 및 배관 등에 불순물을 침적시켜 제염이 효율적이지 않다는 것으로 평가되었다.
        4,000원
        14.
        2016.09 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        국내 최초로 건설된 가압경수로형 발전소인 고리1호기는 1978년 4월 첫 상업운전을 개시하였고, 2017년 6월 18일 영구정지 될 계획이다. 고리1호기에서는 사용후핵연료가 사용후핵연료저장조로 모두 이송된 이후, 계통 표면의 선량율을 감소시키기 위한 목적으로 전계통 제염을 실시할 계획이다. 이 논문에서는 해외 원전의 계통제염 사례분석을 통해 국내 최초로 시행될 예정인 고리1호기의 계통제염 운전개념을 기술하고자 하였다.
        4,000원