검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 11

        2.
        2022.10 구독 인증기관·개인회원 무료
        The Republic of Korea is implementing safeguards for domestic nuclear facilities through cooperation with the IAEA. But it is not to evaluate the material balance for the material unaccounted for, MUF in the bulk handling facility. Although the development of a material balance evaluation program is underway, there are no related regulations. The State Regulatory Authority, SRA is performing material balance evaluation, MBE on the facility based on the design information and material balance results of the facility. However, it is not possible to directly derive measurement uncertainty for the facility’s measurement equipment, which is an important variable of MBE. To solve this problem, it is trying to derive a method suitable for the domestic environment by investigating the some measurement uncertainty estimation methods and analyzing characteristics of them. In this study, the traditional measurement uncertainty estimation method, GUM method and GUM-S1 method were studied and the advantages and disadvantages were analyzed. Due to the problems mentioned above, the uncertainty quantification technique currently being used cannot be applied to the evaluation of the domestic material balance. Therefore, we are tying to apply them to the evaluation the domestic material balance through the above three methods or a combination of them appropriately. Through this continuing study, it is expected that it will be possible to present a plan to derive measurement uncertainty optimized for the domestic MBE environment.
        3.
        2022.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        An automated material handling system (AMHS) has been emerging as an important factor in the semiconductor wafer manufacturing industry. In general, an automated guided vehicle (AGV) in the Fab’s AMHS travels hundreds of miles on guided paths to transport a lot through hundreds of operations. The AMHS aims to transfer wafers while ensuring a short delivery time and high operational reliability. Many linear and analytic approaches have evaluated and improved the performance of the AMHS under a deterministic environment. However, the analytic approaches cannot consider a non-linear, non-convex, and black-box performance measurement of the AMHS owing to the AMHS’s complexity and uncertainty. Unexpected vehicle congestion increases the delivery time and deteriorates the Fab’s production efficiency. In this study, we propose a Q-Learning based dynamic routing algorithm considering vehicle congestion to reduce the delivery time. The proposed algorithm captures time-variant vehicle traffic and decreases vehicle congestion. Through simulation experiments, we confirm that the proposed algorithm finds an efficient path for the vehicles compared to benchmark algorithms with a reduced mean and decreased standard deviation of the delivery time in the Fab’s AMHS.
        4,000원
        6.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Companies build the factory automation system to improve management effectiveness and productivity as prime strategies for sustainable growth. But most companies undergo various trials and errors while carrying out the project without elaborate preparation stage for factory automation. In this study, we tried to verify what factors are critical to effectively building distribution automation system, which is a branch of factory automation system. A consulting model for setting up a Material Handling Automation System by utilizing the Stage-Gate Process, which is product development process was studied. 29 material handling automation projects carried out between the year 1990 to 2013 at K-Company were selected. Interviews with the project managers, operators and maintenance personnels, various records and current status of the projects were used as data for structural equations based on the Milan consulting model and existing researches of factory automation, CIM for material handling automation. Creating effective basis of production, material handling system and energy saving system with expert review, when preparing a material handling automation project, help promote the project planning thus contributing to the performance of the resulting system, which appears though rather weakly in our data. Also the effect of material handling automation can be enhanced through sufficient and effective links to the relevant environments such as production logistics management and automated warehouses. More detailed planning characteristics of project promotion or some time-series data of effective Material Handling Automation System could enhace furthur studies. We propose a consulting model for setting up an efficient material handling automation system.
        4,000원
        7.
        2013.05 구독 인증기관·개인회원 무료
        As the competition is globalized, companies are building the Factory automation system for increment of management effectiveness and growth of productivity as one of strategies for sustainable growth. But most of companies undergoes various trials and errors due to carrying forward without elaborate preparation of factory automation. To reduce these trials and errors, there must be a project team consist of clears project basic and experts. otherwise to consult a expert is a way to reduce trials and errors. In this study, I tried to verify what factors affect to effective building distribution automation system which is a branch of factory automation system and studied consulting model for building Material Handling Automation System utilizing Stage Gate Process which is product development process. This paper summarizes master's thesis.
        8.
        2010.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recently, to improve operating efficiency with the higher in-line rate in automated production lines, a lot of cases of grouping machines and material handling system together to form a cluster has shown frequently. This article addresses the job allocati
        4,000원
        9.
        2010.08 구독 인증기관 무료, 개인회원 유료
        Recently, to improve operating efficiency with the higher in-line rate in automated production lines, a lot of cases of grouping machines and material handling system together to form a cluster has shown frequently. This article addresses the job allocation and operation method of automated material handling for cluster-type production systems. First of all, the control problems of the automated material handling systems are classified into the control problem of inter-cluster material handling system and that of intra-cluster material handling system. Then, a distributed agent-based control scheme is proposed for the former, and an operational control procedure for the latter. Simulation experiment shows that the proposed method is efficient in reducing cycle times and improving utilization of material handling vehicles.
        4,000원
        10.
        2009.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This paper addresses the facility layout problem in multi-bay environments, where the bays are connected at one or both ends by an inter-bay material handling system In most previous studies, the main concern is to allocate facilities or departments to th
        4,000원
        11.
        2002.11 구독 인증기관 무료, 개인회원 유료
        Automated manufacturing systems are applied to shop floors as a tool for the increase of productivity and quality and the decrease of manufacturing lead times and industry accidents. One of the most important issue of the present day is the application of Internet. The development of Internet technologies makes manufacturing enterprises break spacial barriers between users and shop floors, and collect various field data in remote sites. In this research, an Internet-based remote control system for a small-sized automated storage and retrieval system is developed for the purpose of real-time monitoring and control of automatic production equipment. The developed system has a client-server architecture and transmits real-time images of the automated storage and retrieval system to a client by ar CCD camera connected to a server. Based on the transmitted images, the client sends commands to PLC of the server, and part storage and retrieval tasks are executed.
        4,000원