This paper considers an integrated decision for scheduling and outsourcing(or, subcontracting) of a finite number of jobs(or, orders) in a time-sensitive make-to-order manufacturing environment. The jobs can be either processed in a parallel in-house fa
This study considers the problem of scheduling jobs on uniform parallel machines with a common due date. The objective is to minimize the total absolute deviation of job completion times about the common due date. This problem is motivated by the fact t
Among the semiconductor If-chips, unlike memory chips, a majority of Application Specific IC(ASIC) products are produced by customer orders, and meeting the customer specified due date is a critical issue for the case. However, to the one who understands the nature of semiconductor manufacturing, it does not take much effort to realize the difficulty of meeting the given specific production due dates. Due to its multi-layered feature of products, to be completed, a semiconductor product(called device) enters into the fabrication manufacturing process(FAB) repeatedly as many times as the number of the product specified layers, and fabrication processes of individual layers are composed with similar but not identical unit processes. The unit process called photo-lithography is the only process where every layer must pass through. This re-entrant feature of FAB makes predicting and planning of due date of an ordered batch of devices difficult. Parallel machines problem in the photo process, which is bottleneck process, is solved with restricted roll out algorithm. Roll out algorithm is a method of solving the problem by embedding it within a dynamic programming framework. Restricted roll out algorithm Is roll out algorithm that restricted alternative states to decrease the solving time and improve the result. Results of simulation test in condition as same as real FAB facilities show the effectiveness of the developed algorithm.
This research considers the problem of scheduling Jobs on unrelated parallel machines with a common due date The objective is to minimize the total absolute deviation of Job completion times about the common due date. This problem is motivated by the fact
Body gesture Recognition has been one of the interested research field for Human-Robot Interaction(HRI). Most of the conventional body gesture recognition algorithms used Hidden Markov Model(HMM) for modeling gestures which have spatio-temporal variabilities. However, HMM-based algorithms have difficulties excluding meaningless gestures. Besides, it is necessary for conventional body gesture recognition algorithms to perform gesture segmentation first, then sends the extracted gesture to the HMM for gesture recognition. This separated system causes time delay between two continuing gestures to be recognized, and it makes the system inappropriate for continuous gesture recognition. To overcome these two limitations, this paper suggests primitive body model encoding, which performs spatio/temporal quantization of motions from human body model and encodes them into predefined primitive codes for each link of a body model, and Selective/Asynchronous Input-Parallel State machine(SAI-PSM) for multiple-simultaneous gesture recognition. The experimental results showed that the proposed gesture recognition system using primitive body model encoding and SAI-PSM can exclude meaningless gestures well from the continuous body model data, while performing multiple-simultaneous gesture recognition without losing recognition rates compared to the previous HMM-based work.