검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 8

        1.
        2021.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In this study, in order to manufacture STS 316L seamless pipes with 18mm, 25mm, and 42mm diameters that can be used for high pressure, we intend to make predictions through design and finite element analysis and produce real objects. It was measured to have the highest hardness value in the deformed part, and it is expected to be due to work hardening. It has been interpreted that plastic deformation does not occur up to 1,000bar for STS 316L seamless pipes with a diameter of 18mm and 25mm, but plastic deformation occurs at 900bar or more in STS 316L seamless pipes with a diameter of 42mm.
        4,000원
        2.
        2020.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In order to commercialize large diameter PP pipes, the cutting work was attempted with the cutting machine (∅18″and AL120 cutter, 2100 r.p.m) used for the conventional PE or PVC pipe(∅1200 mm, t 70), but the cutting work was failed because the material of “PP pipe” melted and sticked to the surface of the wheel-cutter. In order to find the optimal structure and number of blades for wheel-cutters, an experimental investigation the temperature measurement of specimen and wheel-cutter and the visualization of cutted specimen surface and chip shape were carried out during and after experiment. In addition, modelings for cutting and heat transfer mechanisms have been developed for theoretical analysis. The theoretical and experimental results were in good agreement. The results show that the appropriate structure and the rotational speed of wheel-cutter are W60 and 650 rpm for the large diameter PP pipe cutting machine.
        4,000원
        4.
        2018.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study develops a model to estimate the economic life of the large-diameter water supply pipeline in Korea by supplementing existing methods used to perform similar calculations. To evaluate the developed methodology, the model was applied to the actual target area with the conveyance pipe in P waterworks. The application yielded an economic life computation of 39.7 years, considering the cost of damages, maintenance, and renewal of the pipeline. Based on a sensitivity analysis of the derived results, the most important factor influencing the economic life expectancy was the predicted failure rate. The methodology for estimating the economic life of the water supply pipeline proposed in this study is one of the core processes of basic waterworks facility management planning. Therefore, the methods and results proposed in this study may be applied to asset management planning for water service providers.
        4,000원
        5.
        2017.04 구독 인증기관·개인회원 무료
        In this study, we suggested the jacking method of small diameter sewer pipe for improving workability of the pipe at the weak ground. The jacking method minimizes the space and time in constructing small diameter sewer pipe. In addition, to use this method do not cause road restrictions during the construction period. In this study, the construction process of the small diameter sewer pipe is explained. In addition, to ensure the safety during construction, the design consideration such as earth pressure and the jacking force of the steel pipe, and safety against boiling of the ground were examined. For verify the safety of this jacking method, it is necessary to carry out an experiment to estimate the safety of main pipe under construction.
        6.
        2017.04 구독 인증기관 무료, 개인회원 유료
        Due to the sewer induced ground subsidence, there is an increasing demand for the advanced visual inspection technique for the existing sewer pipe structures. This study aim to develop a visual inspection device and real-time transmission system of inspection data with precisely evaluated structural and operational conditions of underground sewer pipe structures. In this paper, a high-precision image capturing system that automatically extracts cracks in the large-diameter sewer pipes and sewage culverts with a diameter of 1,000 mm or more, a real-time gas detection sensor for investigator safety were studied. By analyzing the module technology of the visual inspection device, the concept design for system integration was derived, and the real time transmission system of the inspection result was developed to establish the technical basis for the commercialized device. Also the crack detection test using crack calibration was carried out for the proposed image capturing camera system, and the position accuracy using L1 grade GPS module was tested in this study. The inspection technique of the existing structure condition using the visual inspection device in this study can be effectively used for various structures types and advanced composite structures in the future.
        3,000원
        7.
        2022.01 KCI 등재 서비스 종료(열람 제한)
        The objective of this study is to determine the appropriate size of the inlet pipe diameter and thereby conduct hydraulic analysis for the Korean water distribution network. To this end, the data tables for equivalent pipe diameters and outflow rates presently employed in Korea were adopted. By incorporating the table of equivalent pipe diameters, it was found that the size of the inlet pipe diameter was overestimated, which can cause shortage of water pressure and malfunctioning or insufficiency of outflow rate in the corresponding adjacent region. However, by conducting hydraulic analysis based on the table of outflow rates, relatively reasonable flow rates were observed. Furthermore, by comparing the real demand-driven analysis (RDDA) approach and demand-driven analysis (DDA) approach toward managing the huge water demand, it was observed that DDA could not effectively respond to real hourly usage conditions, whereas RDDA (which reflects the hourly effects of inlet pipe diameter and storage tanks) demonstrated results similar to that of real water supply.
        8.
        1998.06 KCI 등재 서비스 종료(열람 제한)
        상수관망은 상수공급시스템에서 핵심적인 부분이다. 주어진 상수공급시스템에서 배수관망에 대한 비용은 사업전체 비용에 대한 대부분을 차지하고 있다. 관망에 대한 설계과정 중에서 최적화기법을 사용하여 비용을 절감하기 위한 연구가 시도되었다. 주어진 상수관망 시스템의 설계시 고려되는 관경의 결정을 위해 유량해석과 최적화 기법이 연계되어 해석하는 반복기법이 적용되었다. 유량해석을 위해서 선형화기법이 되입되었고 관경의 최적화를 위해서 선형계획법에 기초한 개정 단체법