The world's largest diesel power plant listed in the Guinness Book of World Records is Jordan's Amman Asian power plant, which produces a total of 573 MW of electric power. It consists of 38 units of 15MW capacity, and KEPCO achieved high profitability through the power plant. If a large capacity of 50MW clsss is applied, it will be newly listed in the Guinness Book of World Records even if only 12 units are constructed. Therefore, large-scale overseas orders for diesel power plants that require large capacity are expected in the future. The purpose of this study is to derive a installation offset by performing the shaft alignment analysis for large capacity 50MW shaft system. As a result, the offset of shaft system for the 50MW diesel power generation equipment was successfully derived through the bearing influence assessment and introduction of arrangement slope for main engine bearings.
갭색법(gap & sag method)은 선박 건조과정에서 축을 조립하기 전 최종적으로 축이 축계정렬 설계치와 동일한 위치에 거치되었는지의 여부를 확인하기 위해 사용되고 있는 방법이며, 조립 전 프로펠러축을 기준축으로 하여 양 축의 플랜지에서 축 자중에 의해 발생하는 갭색값을 통해 나머지 축계의 위치를 순차적으로 확정해 나간다. 만일 설계치와 다르게 기준축이 거치되는 경우 연쇄적으로 나머지 축의 거치에 영향을 주게 된다. 또한, 축 조립 후 검증과정에서 측정된 베어링 반력이 설령 설계치를 만족하더라도 선미관 후부측에서의 프로펠러축과 베어링간 상대적경사각을 추정할 수 없게 됨으로써 결과적으로 축계의 안정성에 부정적인 영향을 미칠 수 있다. 이러한 문제를 해결하기 위하여 본 연구에서는 실제 선미관 베어링 발열 및 개방검사 사례를 통해 선미관 베어링 유효지지점에 관한 이론계산 및 실측치분석 연구를 수행하고 이를 바탕으로 축계 정렬오차를 최소화하기 위한 축계 시공방법을 제안하였다.