This study would present a risk analysis method to evaluate stable tap water supply in a multi-regional water supply system and propose a measure for the evaluation of the effect of the conjunctive operation of the multi-regional water supply system using this. Judging from the vulnerability for the crisis response of the entire N. multi-regional water supply system, as compared to the result of Scenario 1 in which no conjunctive pipes were operated, it was found that in Scenario 2, in which conjunctive pipes were partially operated, the vulnerability of crisis response decreased by about 30.6%, and as compared to Scenario 3, the vulnerability of crisis response decreased by 86.2%. In setting a plan for stable tap water supply in N multi-regional water supply system, using the estimated value and the method for the evaluation of the vulnerability of crisis response by pipe, by interval and by line, it is judged that this can be utilized as a basis for the judgment of the evaluation of the operation or the additional installation of conjunctive pipes.
The function failure of present major facilities is likely to lead to failure of related systems and/or whole facilities, increasing the necessity for protection of infrastructures, main structures, and major industrial facilities. In addition, safe and efficient management for urban infrastructure (waterworks and sewerage facilities, electricity, telecommunications, roads, etc) installed in the basement or on large cities grounds at various public areas is required. Recently in response to this demand, efforts for vitalizing asset management are being made such as enacting related laws and developing asset management system in the U.S., Australia, Europe and other advanced countries with the concept for a new maintenance. In our county, identifying maintenance system problems such as aging and rapid increasing of existing infrastructures and decision-making about updating maintenance is required for systematic and organizational maintenance. In this study, by comparing and observing the LOS(Level of Service) of each countries’ waterworks and risk-based LOS, we suggest the direction of future urban water infrastructure management systems for more effective management.
It is expected that the temperature in Pyeongyang will be similar to that (16.6℃) in Seogwipo in the late 21st century, and most of South Korea will enter the subtropical climate due to climate change. Change in the precipitation pattern like the range of fluctuation caused by climate change will lead to expanded uncertainty in securing reliable water supply, along with a serious impact on demands for living and industrial water due to change in the volume and period of river outflow. As industrial water for production activities is estimated based on the contract quantity, it is difficult to apply rationalization of water usage and incentives in water recycling. Therefore many companies are making efforts in complying with the effluent standard while spending few resources on such rationalization and recycling.
This study researched water risk management over 115 Korean companies by 28 questions in 4 categories. Through the research, this study aims to understand water risk management levels and seek response plans.
용수공급시스템은 용수를 안정적으로 확보하여 사용자의 수요량을 충족시키는 것을 목표로 하지만, 평년보다 적은 유입량으로 인해 정상공급에 실패하는 경우가 발생한다. 그러나 강수의 부족으로 발생하는 가뭄 상황이 언제나 용수공급 실패를 유발하는 것은 아니기 때문에, 용수공급에 대한 안전도를 산정할 때 실질적인 용수 부족 사상의 특성을 고려할 필요가 있다. 이를 위해 본 연구에서는 이수안전도 평가 지표로 주로 사용되는 신뢰도와 취약도를 이용하여 결합 가뭄관리지수(JDMI)를 개발하였으며, 이를 바탕으로 미래 용수공급 위험도를 산정하였다. 미래에 대한 분석을 위해 RCP 4.5 및 8.5 시나리오에 대하여 GCM으로부터 생산된 기후변화 시나리오 자료를 적용하고 미래 기간을 21세기 전기, 중기, 및 후기로 구분하였다. JDMI를 기반으로 낙동강 유역의 용수공급 위험도를 분석한 결과 RCP 4.5 시나리오에서 RCP 8.5 시나리오보다 위험도가 더 높은 것으로 분 석되었다. 용수공급 취약지역은 RCP 4.5에서는 남강댐(W18)으로 나타났으며, RCP 8.5에서는 형산강(W23)과 낙동강남해(W33) 유역으로 분석되었다.
최근 한국 근해 및 내륙에서 발생되는 지진의 횟수가 증가함에 따라 지진피해 가능성에 대한 우려가 증가되고 있으며, 지진재해가 발생하였을 경우 신속한 대책을 마련해야 한다는 필요성이 부각되고 있다. 그러나 대규모 사회기반 시설중의 하나인 상수관망 시스템의 경우, 국내 전체 503개소 중 현행 내진설계기준을 만족하는 곳이 전무(소방방재청, 2013)할 정도로 지진재해에 매우 취약하다. 상수도 시설의 경우 구조해석을 통한 개별 구조물의 내진성능평가 뿐 만 아니라, 물 공급가능성을 포함하는 수리학적 위험도(또는 신뢰도) 평가가 반드시 필요하다. 본 연구에서는 수리해석을 기반으로 한 상수관망 지진재해 위험도 산정 프로그램을 개발하였다. 이를 위해 과거 한반도에 발생한 지진자료를 활용하여 지진 발생시나리오를 구성하는 모듈을 구축하였다. 또한 지진 발생에 의해 나타나는 상수도 관망 구성요소(관로, 펌프, 배수지)의 피해 상태를 취약도 함수에 의해 결정하고, 이를 적절히 반영하여 수리해석 결과가 도출되도록 모형화하였다. 본 연구에서 개발된 프로그램을 실제 상수관망 시스템에 적용한 결과, 적용지역에 가까운 곳에서 발생한 과거 지진을 상정하였을 경우 나타난 신뢰도는 지진 재해에 의한 피해를 무시할 수 있는 수준은 아니었으며, 특히 설계 기준에 해당하는 큰 강도의 지진이 발생할 경우 상수관망 시스템의 전반적인 마비가 초래될 수 있음을 확인하였다. 따라서 본 모형은 상수관망의 설계와 사전보강을 위한 의사결정 수단으로 활용될 수 있을 것으로 판단된다.
본 연구에서는 안전하고 원활한 용수공급을 목적으로 하는 상수도관망시스템의 오염예방 및 위험관리를 위한 통합의사결정시스템의 기본구조를 제시하고 유럽과 미국에서 널리 사용되고 있는 다기준 의사결정기법인 PROMETHEE와 ANP를 적용해 상수도관망의 이상징후 판정을 위한 위험요소들의 우선순위를 평가하였다. 문제 구성을 위하여 pH 잔류염소농도, 유량, 수압, 전기전도도, 탁도, 블록누수량, 수온을 자료항목으로 선정하였고 관부식, 관파열, 관내수질오염을 평가