본 연구는 K연구원의 상향식 R&D과제기획 차원의 신규 연구기획과제 선정 평가를 위한 평가도구 개발에 목적을 두고 진행하였다. 이를 위해 CIPP모형과 연구기획평가를 위한 선정평가 및 평가지표에 관한 선행연구를 중심으로 R&D과제기획 선정평가 항목과 문항을 개발 한 후, 2회에 걸친 델파이 조사를 실시하였다. 개발된 평가도구는 13명의 전문가를 대상으로 설문조사를 실시하여 내용타당도, 합의도 및 수렴도를 검증하였다. 최종 선정된 R&D과제기획 선정평가 도구는 8개 항목에 총 21개 문항으로, 상황평가 5 문항, 투입평가 2문항, 과정평가 8문항, 산출평가 6문항으로 구성되었다. 개발된 평가 도구는 상향식 기획 과정상의 문제점을 해소하고 연구자들의 기획역량을 제고하는 데 기여할 것이다. 또한, 선정 평가 시 평가에 대한 일관성과 효율성 제고에 기여할 것이다.
Kori Nuclear Power Plant Unit 1, which began operating in 1978, is Korea’s oldest commercial nuclear reactor. The reactor was permanently shut down in June 2017, and now the decommissioning process has begun. The decommissioning process will generate a significant amount of waste that requires appropriate management to minimize the impact on the environment and human health. And the waste routing, i.e. the activities and logistics for managing the material generated, is a key point in a decommissioning project. It determines the routes from the material inventory to the envisaged material end states. In this study, we review on several factors for the selection of the waste routes in a decommissioning project. In terms of sustainability, the ‘waste hierarchy’ should be applied to routing materials from nuclear facilities. According to the waste hierarchy, the preferred end state is reuse or recycling of the waste as material or, more preferably, the avoidance of waste generation. In addition, treatments (such as decontamination and thermal treatment) that can reduce the volumes requiring disposal as radioactive waste should be considered. Another important parameter is the need to secure availability and capacity of waste routes. Short-term bottlenecks or any delay in the removal of the waste from the site often has an impact on other site activities. If possible, at least two alternative waste routes should be identified for the main categories of waste and kept available throughout the decommissioning project. All routes should be direct to the material end state if possible, but it is more important that waste is removed from the site so that other site operations are not impeded.
어촌뉴딜 300사업은 300개의 어촌과 어항을 대상으로 하는 복합개발사업으로 낙후된 시설 개선 및 지역특화 자원활용 등 전문 프로그램을 제공하는 사업이다. 본 연구에서는 어촌뉴딜 300사업의 선정평가 항목 별 가중치 결정을 위해 다기준 평가방법인 AHP로 전문 가 설문조사를 통한 분석을 수행하였다. 평가결과, 상위계층 평가항목은 개발여건 및 기본구상, 사업효과, 사업계획, 사업 시행 및 관리 순으로 중요도가 높게 나타났다. 사업효과 항목은 가이드라인에서 6점으로 낮은 배점이었지만, AHP 결과 15.57점의 배점이 도출되었다. 본 연구에서 도출된 항목별 가중치는 향후 어촌어항 개발사업 평가항목 배점 선정에 참조할 수 있을 것이다.
Recognition that R&D (Research and Development) project is important for national competitiveness and sustainable economic growth has been extended all over the world, and the government financial support for R&D projects has increased. Therefore, government needs to make a decision about whether it invests in any project or not, and this decision-making complies with evaluation of the relevant experts. In this study, we improve project selection methods and procedures based on outranking methods which have mainly focused on general project environmental analysis in order to apply to the government support R&D project selection, and suggest R&D project selection methods and procedures that meet the purpose of government support. Therefore, it demonstrates that improved methods organize more profitable project groups to the purpose of the selecting government support R&D project than existing methods. Also, it illustrates that it is possible for decision makers to analyze variously by changing composition of selecting project group with variation of α.
Six Sigma is widely recognized as a process improvement methodology. In these days, many organizations today are considering how to choose six sigma project. Th is study is to provide six sigma project selection criteria by comparing public corporate with
The purpose of this study is to explore the applicability of AHP(Analytic Hierarchy Process) to select more productive projects among various proposed projects in a particular company. To achieve this research objective, the characteristics of project evaluation and selection are first reviewed with respect to when, where, and how the decision is made. Then the theoretical basis of the AHP is briefly reviewed along with its mathematical underpinnings to construct the framework of project evaluation and selection. To be more specific, the evaluation and selection criteria were reorganized in the AHP-based framework to make the process of project evaluation and selection more productive. Project evaluation and selection is one of the most important activities for the most companies to be more advantageous in the market. Despite the importance of decision making process of project selection, not many of how to choose the best project were suggested as the reliable project selection methods in the industries. It may be because it involves various activities related to conflict resolution among different evaluation criteria, high uncertainties of market, and the unclear tradeoff among various project objectives. Furthermore, the decision, once made at this point, tends to be irrevocable until the whole process turns out to be a complete success or failure. As the result, the AHP method showed better financial performance rather than the traditional method in a case study.
The problem of system reliability is very important issue in the digitalized nuclear power plant, because the failure of its system brings about extravagant economic loss, environment destruction, and fatal damage of human. Therefore the purpose of this s
This study aims to make a revitalizing plan for managing and maintaining of facilities which were installed after the rural development projects. The survey was conducted to examine some issues of operating facilities from the developing plan. There were some factors that should be considered in the establishment stage of the project plan when promoting rural development projects. Among them, the preservation and maintenance of rurality, consistency with business plans, connectivity with local resources, and ease of maintenance were less reflective than its importance. And for each facility, systematic consulting on appropriate scale and operational management plans and detailed planning is needed.. It's also necessary to plan action so that the local community can lead. The current or future rural development project will be succeeded when local governments support to strengthening their local groups or people’s abilities.
As policy for regional development in bottom-up style is introduced, each local government reflects opinion of regional residents and experts, and continues to strive for active use of regional capability and natural resources. As a result, there are active movements for regional development in Eup and Myeon unit or village unit inside local government. Comprehensive arrangement project in areas of Eup and Myeon is proceeded with a goal of improvement of life quality for regional residents through strengthening base function of Eup and Myeon areas and improving function of basic service by expanding facility of optimal level available to an unspecified number of the general public such as educational, cultural, welfare facility etc. in Eup and Myeon areas which are base space of rural communities. For analysis method of region for selecting areas where comprehensive arrangement project is done, this study suggested analysis of connection structure based on interaction and analysis of centrality. And empirical analysis was carried out with Buyeo province in Chungcheongnamdo.