In construction work, safety accidents often occur in combination with unstable physical and human conditions during preparation and execution of work. In Korea, the accident rate is higher to that of any country in the world. Therefore, it is necessary to take measures by fundamental prescription. In this paper, in the case of construction safety management, we tried to find a reasonable alternative through a questionnaire survey to apply to subcontracting and small-scale construction. In conclusion, workers who are well aware of the task could be able to reduce the accident rate by deploying them as safety management officers after receiving the training.
The findings were summarized as follows. The safety check by manufacturer showed that 6 of 13 companies are over the average occurrence of defects. It was expected that there would be a difference between manufacturing technology capability and production system of each manufacturer. Consequently, manufacturers should institutionally improve and strengthen certification items for the upward standardization of safety certification before factory. Second, the safety check by year showed that the results of this study accord with those of previous studies on defect time. Consequently, manufacturers should classify the 3-year-old equipment for vehicle-mounted MEWP into a special check subject to do a nondestructive test according to proven results, and also reflect the test in a safety test system to do regular preventive activities of equipment defects. Third, the safety check by part showed that the boom and outrigger parts of vehicle-mounted MEWP have the most defects. Stress concentration resulted in defects as the boom part was most frequently operated in the structural parts for a real work. To prevent this, it is suitable to improve the hardness of boom materials. The outrigger part needs improvement in safety devices with materials. As an outrigger supports the overturning moment of equipment, it is most affected by its load based on the operating radius, resulting in fatigue crack.
Recently, the Ministry of Employment and Labor Management is a trend to strengthen all men death rate than the accident rate. Points reduction in the accident rate change orders related to credit rating score to +2 points in his plans as part of +1 point. In addition, according to the fancy linger RISK treatment in the event of a disaster site and fiction treatment to achieve accident-free during processing the scene interspersed with equity issues have been raised. In general disaster for the problem in the first two cases occurs when abnormal process according to the disaster site manager positions dismissal policy, each division headquarters itself, interspersed disasters performance compared to processing in accordance with the refrain, processing expenses in accordance with the composition of untreated industrial accident, costs and burdens partners FTC , there is a possibility that the issues raised, such as the Ministry of Employment and Labor. In response to domestic social practices focused on the construction site practices and prevention measures should be evaluated with respect to what.