검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 7

        1.
        2016.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The train-centric control systems development has some distinct points in that a big size of government budget is in general expended in there and the development duration seems to be long. In addition, the changes are ever made continuously in the capability and operational requirements for Trains. Thus, the impact of the potential changes in the required operational capability on the development activities can induce some type of project risks [7]. As such, proper management of project risk has been one of crucial subjects in the train systems development. All these notes combined together make it the significance of the safety management process be raised further up in the train-centric control systems development. As such, the underlying safety management process should be capable of appropriately handling the potential risks that can be created due to the unexpected changes and the long-term development period. The process should also be complemented for the safety consideration of train-centric control systems, for instance, stop. To study these aspect is the objective of the paper. To do so, a step-by-step approach to analyzing the safety management process is first presented. Then, to enhance the process some necessary and useful activities are added in terms of risk and safety management. Then, to pursue some enhancement on the process, a set of necessary and useful activities are added in terms of risk and safety management. The resultant process is further analyzed and tailored using a design structure matrix method. The resultant process is applied in a train-centric control development as a case study.
        4,000원
        2.
        2015.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Modern systems development becomes more and more complicated due to the need on the ever-increasing capability of the systems. In addition to the complexity issue, safety concern is also increasing since the malfunctions of the systems under development may result in the accidents in both the test and evaluation phase and the operation phase. Light rail transit(LRT) with passenger capacity between bus and subway is driven by an unmanned control, so safety issues of LRT in emergency shall be considered more carefully than other rolling stock. Modern railway system is a complex system and many actions in emergency are required. In this view, interoperability approach is effective to identify the related elements in emergency. In this paper, we propose the method to generate the fire response scenario of unmann ed LRT based on the outputs of systems engineering architecture design methodology. The proposed method is could be contributed to establish more reliable and applicable fire response scenario.
        4,200원
        3.
        2006.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Korea Railroad Research Institute developed the driverless rubber-tired Korean-AGT system from 1999 to 2005 and has done its performance and reliability tests on the test line at Gyeongsan-city. We made the reliability management program to control required the RAMS(reliability, availability, maintainability & safety) of the K-AGT system. Therefore, we demonstrated the development and application of Reliability DB program. The main functions of K-AGT Reliability DB program manages failures and maintenance data systematically from the test line through test period and provides various analysis results based on the inputted data.
        4,300원
        4.
        2005.05 구독 인증기관 무료, 개인회원 유료
        도시철도시스템은 차량, 전력, 신호, 선로구축물 등이 유기적으로 결합된 복합시스템으로 고장 또는 사고가 발생하면 원인규명이 어렵고 사고에 따른 영향이 매우 크기 때문에 시스템의 신뢰성과 안전성은 매우 중요하다. 본 논문에서는 철도에서 적용되고 있는 신뢰성관련 국제 규격을 분석하여 국내에서 개발하고 있는 무인운전 도시철도시스템에 이러한 규격들의 내용들을 충족하는 관리체계를 제시하고자 한다. 즉 기존에 적용하고 있는 신뢰성 관리체계인 IEC 60300, IEC 62278, MIL-STD-785B 등의 특성과 장점을 비교분석하여 도시철도시스템에 구체적으로 적용할 수 있는 신뢰성관리체계를 제시하고자 한다.
        4,000원
        5.
        2004.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Korea Railroad Research Institute(KRRI) has developed the rubber-tired AGT system from 1999 to 2004. The rubber-tired AGT vehicle is now on test for its performance and function in the Gyeong-San test line. In this paper, we provide the reliability management plan to assure required the RAMS(reliability, availability, maintainability 8t safety) of the AGT vehicle system.
        4,800원
        6.
        2004.11 구독 인증기관 무료, 개인회원 유료
        Special, high technology developments and systems improvements become more necessary as the industrial society is becoming complex. When some systems are developed, it is common that developed systems have low-reliability in infant period. Some developed systems need tests to improve their reliability up to the respected level before adapting them. This paper aims at showing the testing program including the reliability growth model for reliability improvement of the Light Rail Transit
        4,000원
        7.
        2004.11 구독 인증기관 무료, 개인회원 유료
        Korea Railroad Research Institute(KRRI) has developed the rubber-tired AGT system from 1999 to 2004. The rubber-tired AGT vehicle is now on test for its performance and function in the Gyeong-San test line. Tn this paper, we provide the reliability management plan to assure required the RAMS(reliability, availability, maintainability & safety) of the AGT vehicle system.
        4,300원