검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 4

        1.
        2023.11 구독 인증기관·개인회원 무료
        Effective containment and disposal of high-level radioactive waste is critical to ensure long-term environmental and human safety. Especially bentonite, which is widely used as a buffer material due to its favorable characteristics such as swelling ability and low permeability, plays an important role in preventing the migration of radioactive waste into the surrounding environment. However, the long-term performance of bentonite buffer remains an area of ongoing investigation, with particular attention focused on erosion mechanisms induced by swelling and groundwater flow. The erosion of the bentonite buffer can significantly impact the integrity of buffer and lead to the formation of colloids, which could potentially facilitate the transport of radionuclides through groundwater. Therefore, quantification of bentonite buffer erosion based on an understanding of the underlying mechanisms and factors that influence bentonite buffer erosion, is essential for the safety assessment of high-level radioactive waste repositories. In this study, we aimed to develop a bentonite buffer erosion model using the Adaptive Processbased total system performance assessment framework for a geological disposal system (APro) proposed by the Korea Atomic Energy Research Institute (KAERI). The impact of bentonite erosion on performance assessment can be broadly divided into bentonite property degradation by the penetration of the bentonite buffer into rock fractures and the formation of pseudocolloids. To simulate this phenomenon, Two-region model based on a dynamic bentonite diffusion model is adopted, which can quantify the extent of bentonite intrusion and loss by erosion. Using this Tworegion model, a numerical model was developed to simulate the degradation of bentonite properties based on the amount of bentonite intrusion, as well as to simulate the migration of pseudocolloids in the near-field by deriving the amount of pseudocolloid production based on the loss of bentonite and the sorption rate of radionuclides. To check the applicability of the developed numerical model, preliminary analysis was performed for the effect of bentonite erosion in terms of process-based performance assessment. It is anticipated that this comprehensive model developed in this study will contribute to the accurate and reliable assessment of the long-term performance and safety of high-level radioactive waste repositories.
        2.
        2023.11 구독 인증기관·개인회원 무료
        The compacted bentonite buffer is a key component of the engineered barrier system in deep geological repositories for high-level radioactive waste disposal. Groundwater infiltration into the deep geological repository leads to the saturation of the bentonite buffer. Bentonite saturation results in bentonite swelling, gelation and intrusion into the nearby rock discontinuities within the excavation damaged zone of the adjacent rock mass. Groundwater flow can result in the erosion and transport of bentonite colloids, resulting in bentonite mass loss which can negatively impact the long-term integrity and safety of the overall engineered barrier system. The hydro -mechanicalchemical interactions between the buffer, surrounding host rock and groundwater influence the erosion characteristics of the bentonite buffer. Hence, assessing the critical hydro-mechanicalchemical factors that negatively affect bentonite erosion is crucial for the safety design of the deep geological repository. In this study, the effects of initial bentonite density, aperture, discontinuity angle and groundwater chemistry on the erosion characteristics of Bentonil WRK are investigated via bentonite extrusion and artificial fracture experiments. Both experiments examine bentonite swelling and intrusion into simulated rock discontinuities; cylindrical holes for bentonite extrusion experiments and plane surfaces for artificial fracture experiments. Compacted bentonite blocks and bentonite pellets are manufactured using a compaction press and granulation compactor respectively and installed in the transparent extrusion cells and artificial fracture cells. The reference test condition is set to be 1.6 g/cm3 dry density and saturation using distilled water. After distilled water or solution injection, the axial and radial expansion of the bentonite specimens into the simulated rock discontinuities are monitored for one month under free swelling conditions with no groundwater flow. Subsequent flow tests are conducted using the artificial fracture cell to determine the critical flow rate for bentonite erosion. The intrusion and erosion characteristics are modelled using a modified hydro-mechanicalchemical coupled dynamic bentonite diffusion model and a fluid-based hydro-mechanical penetration model.
        3.
        2023.11 구독 인증기관·개인회원 무료
        The concept of deep geological disposal for high-level radioactive waste is based on an engineered barrier system (EBS), including a canister, bentonite buffer and backfill material. The bentonite buffer is key component of the EBS to prevent groundwater infiltration and radionuclide leakage. However, the bentonite buffer can become saturated due to groundwater flow through the excavation damaged zone in the adjacent rock, causing erosion of bentonite buffer and affecting the long-term performance of EBS. While the RH (relative humidity) sensor is commonly used to assess the degree of saturation in the bentonite buffer, it has a critical challenge due to its sensor size, which can disturb the overall integrity of the bentonite buffer during the initial installation process. In contrasts, the electrical resistivity test, widely known as a non-destructive method, is used to predict soil properties such as the degree of saturation and water contents. This method measures the electric resistance of materials using electric current induced by electric potential difference between two electrodes. Notably, there is no study that assess the integrity of bentonite buffer in a nuclear waste repository using electrical resistivity measurement. This study presents the electrical resistance numerical module under steady state using commercial finite element method (FEM), and quantitatively estimate the change of electrical resistance according to saturation and erosion of bentonite buffer. Furthermore, the electric potential and current density distribution formed between two electrodes are analyzed.
        4.
        2022.10 구독 인증기관·개인회원 무료
        When a rapid groundwater inflow is introduced from the adjacent rock mass in the early stage of disposal, hydraulic pressure build-up occurs, which may cause piping erosion at the buffer material itself and the interface of the gap-filling material. Such piping erosion in compacted bentonite buffer via interaction between the buffer and the adjacent rock mass may deteriorate the performance of the buffer material. Therefore, it is necessary to understand the conditions and scenarios in which the piping phenomenon around the buffer material occurs for the long-term health of the repository. In this study, laboratory-scale experimental tests of piping erosion in buffer and interfacial rock was introduced. ø 100 mm × 200 mm height compacted bentonite specimens were placed in a cylindrical acetal cell, and the distilled water was continuously injected at a flow rate of 0.068 L/min using a dual syringe pump. The inflow of water was generated from the bottom and side cell of buffer material. During water injection, injected water pressure and amount were measured with visual observation. The results showed that the external saturation of buffer firstly occurs followed by piping crack generation along the wetting front. The additional piping channels were generated and merged with others. As the injection stopped, the swelling and self-sealing behavior of buffer material were observed. Moreover, X-ray CT scanning of the cell was conducted after the piping simulation to analyze the piping channels and saturation depth. The results highlight the piping erosion phenomenon mainly occurs due to the presence of a gap outside the buffer material. Further experimental cases is need to comprehensively understand piping phenomena in buffer material for assessing the long-term stability of underground radioactive waste disposal systems.