GRP pipe (Glass-fiber Reinforced Plastic Pipe) lines making use of FRP (Fiber Reinforced Plastic) are generally thinner, lighter, and stronger than the existing concrete or steel pipe lines, and it is excellent in stiffness/strength per unit weight. In this study, we present the result of field test for buried GRP pipes with large diameter(2,400mm). The vertical and horizontal ring deflections are measured for 387 days. The short-term deflection measured by the field test is compared with the result predicted by the Iowa formula. In addition, the long-term ring deflection is predicted by using the procedure suggested in ASTM D 5365(ANNEX) in the range of 40 to 60 years of service life of the pipe based on the experimental results. From the study, it was found that the long-term vertical and horizontal ring deflection up to 60 years is less than the 5% ring deflection limitation.
PURPOSES: The purpose of asphalt pavement reducing surface temperature by using Pipe cooling system is to make pleasant city life environment. METHODS: We considered building condition to lay the pipes under asphalt pavement and figured out that temperature reducing effect with pipe cooling system. In addition, we guessed rutting through wheel tracking test with a laid the pipes under asphalt mixture and performed fatigue cracking through a flexural fatigue test for performance evaluation of pipe cooling system. RESULTS: When pipe cooling system worked, the temperature of pavement model reduced quickly in test. The system can turn down the degree by 4 or 5 quickly as well. It didn't affect rutting to lay the pipes under the pavement, but it can get damaged to asphalt pavement in early stage by the result of performance evaluation. CONCLUSIONS: We figured out that pipe cooling system can turn down the temperature of aspalt pavement surface through tests. We suggest that pipe cooling system should be considered one of the effective way to solve urban heat island problem.
Recently, underground pipes are utilized in various fields of applications such as sewer lines, drain lines, water mains, gas lines, telephone and electrical conduits, culverts, oil lines, etc. Most of pipes are installed for long-term purposes and they should be safely installed in consideration of installation conditions because there are unexpected various terrestrial loading conditions. In this paper, we present the result of investigation pertaining to the structural behavior of glass fiber reinforced thermosetting polymer plastic (GFRP) flexible pipes buried underground. The mechanical properties of the GFRP flexible pipes produced in the domestic manufacturer are determined and the results are reported in this paper. In addition, ring deflection is measured by the field tests and the finite element analysis (FEA) is also conducted to simulate the structural behavior of GFRP pipes buried underground. From the field test results, we predicted long-term, up to 50 years, ring deflection of GFRP pipes buried underground based on the method suggested by the existing literature. It was found that the GFRP flexible pipe to be used for cooling water intake system in the nuclear power plant is appropriate because 5% ring deflection limitation for 50 years could be satisfied.
The purpose of this study is analyzing the performance of sea water cooling system under various refrigerant pipe length. In sea water cooling system, the increase of refrigerant pipe length cause increases of pressure drops. These pressure drops cause fresh gas in liquid pipe and increase specific volume in gas pipe outlet, so sea water cooling system capacity is decreased by decrease of refrigerant mass flow rate. Sea water cooling system capacity in refrigerant pipe length 70m is decreased more than 30% when compared with pipe length 10m and the decrease of the coefficient of performance is nearly 20%.
In this study, an analytical study on cooling period of vertical pipe cooling method was performed to determine the discontinuance time of pipe cooling.
Vertical pipe cooling method was developed for the thermal cracking control of vertically long and slender mass concrete member. This method was applied to mass concrete wall, and the performance of this method was investigated.