검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 24

        4.
        2023.11 구독 인증기관·개인회원 무료
        Derived Concentration Guideline Levels (DCGLs), which represent the residual radioactivity concentration limits, serve as the pivotal criteria for decontamination during decommissioning of nuclear power plants and are essential for license termination. The analysis of radionuclides in various media to check site-specific and radionuclide-specific DCGLs is a resource-intensive and time-consuming processes, and there are some radionuclides that are hard to analyze. In the decommissioning of the Rancho Seco nuclear power plant in the United States, a conservative approach was adopted. Potentially highly contaminated areas on the site were identified by collecting and analyzing soil samples, and radionuclides exceeding the Minimum Detectable Concentration (MDC) were selected as the potential Radionuclide of Concern (ROC), and surrogate DCGLs for hard-to-detect radionuclides were applied to soil samples. For soil samples in the Rancho Seco nuclear power plant, Cs-137 contributed more than 90% of the total radioactivity. DCGLs of the ROC were obtained using the scaling factors through analysis of Cs- 137 for a large amount of soil samples. In Korea, the scaling factor methodology has not been applied to the decommissioning of commercial nuclear power plants. An initial investigation was undertaken to assess the viability of implementing Surrogate Derived Concentration Guideline Levels (DCGLs) in the dismantling of Kori Unit 1, drawing insights from the U.S. nuclear power plant decommissioning experiences. To do this approach, the concentration ratio of radionuclides of interest to key radionuclide in contaminated soil should be known and consistent. But related information is not available at this time. So Surrogate DCGL for representative C-14, Fe-55, Ni-59, Ni-63, and Sr-90 was obtained using the scaling factors applied to radioactive waste data, specifically Decontaminated Aqueous Waste (DAW) and Spent Resin. In order to develop a reliable surrogate DCGLs the Kori Unit 1 site, it is important to analyze the radionuclides in the soil for the Kori Unit 1 decommissioning site to obtain consistent concentration ratio of the radionuclides of concern to the key radionuclides. When a the suitable DCGL is developed, it can be used for FSS planning and prior decision-making ensuring the safe and effective decommissioning of Kori Unit 1 and similar nuclear power plants.
        5.
        2023.11 구독 인증기관·개인회원 무료
        Kori Unit 1 nuclear power plant is a pressurized water reactor type with an output of 587 Mwe, which was permanently shut down on June 18, 2017. Currently, the final decommissioning plan (FDP) has been submitted and review is in progress. Once the FDP is approved, it is expected that dismantling will begin with the secondary system, and dismantling work on the primary system of Kori Unit 1 will begin after the spent nuclear fuel is taken out. It is expected that the space where the secondary system has been dismantled can be used as a temporary storage place, and the entire dismantling schedule is expected to proceed without delay. The main equipment of the secondary system is large and heavy. The rotating parts is connected to a single axis with a length of about 40 meters, and is complexly installed over three floors, making accessibility very difficult. A large pipe several kilometers long that supplies various fluids to the secondary system is installed hanging from the ceiling using a hanger between the main devices, and the outer diameter of the pipe is wrapped with insulation material to keep warm. In nuclear secondary system decommissioning, it is very important to check for radiation contamination, establish and implement countermeasures, and predict and manage safety and environmental risks that may occur when cutting and dismantling large heavy objects. So we plan to evaluate the radiation contamination characteristics of the secondary system using ISOCS (In- Situ Object Counting System) to check for possible radioactive contamination. According to the characteristics results, decommissioning plans and methods for safe dismantling by workers were studied. In addition, we conducted research on how to safely dismantle the secondary system in terms of industrial safety, such as asbestos, cutting and handling of heavy materials and so on. This study proposes a safe decommissioning method for various risks that may occur when dismantling the secondary system of Kori Unit 1 nuclear power plant.
        6.
        2023.06 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        Compared to operational wastes, nuclear power plant (NPP) decommissioning wastes are generated in larger quantities within a short time and include diverse types with a wider range of radiation characteristics. Currently used 200 L drums and IP-2 type transport containers are inefficient and restrictive in packaging and transporting decommissioning wastes. Therefore, new packaging and transport containers with greater size, loading weight, and shielding performance have been developed. When transporting radioactive materials, radiological safety should be assessed by reflecting parameters such as the type and quantity of the package, transport route, and transport environment. Thus far, safety evaluations of radioactive waste transport have mainly targeted operational wastes, that have less radioactivity and a smaller amount per transport than decommissioning wastes. Therefore, in this study, the possible radiation effects during the transport from NPP to disposal facilities were evaluated to reflect the characteristics of the newly developed containers and decommissioning wastes. According to the evaluation results, the exposure dose to transport workers, handling workers, and the public was lower than the domestic regulatory limit. In addition, all exposure dose results were confirmed, through sensitivity analysis, to satisfy the evaluation criteria even under circumstances when radioactive materials were released 100% from the container.
        4,800원
        7.
        2023.05 구독 인증기관·개인회원 무료
        Kori unit 1, the first PWR (Pressurized Water Reactor) in Korea, was permanent shut down in 2017. In Korea, according to the Nuclear Safety Act, the FDP (Final Decommissioning Plan) must be submitted within 5 years of permanent shutdown. According to NSSC Notice, the types, volumes, and radioactivity of solid radioactive wastes should be included in FDP chapter 9, Radioactive Waste Management, Therefore, in this study, the types depending on generation characteristics and radiological characterization methods and process of solid radioactive waste were analyzed. Solid radioactive waste depending on the characteristics of the generation was classified into reactor vessel and reactor vessel internal, large components, small metals, spent nuclear fuel storage racks, insulation, wires, concrete debris, scattering concrete, asbestos, mixed waste, soil, spent resins and filters, and dry active waste. Radiological characterization of solid radioactive waste is performed to determine the characteristics of radioactive contamination, including the type and concentration of radionuclides. It is necessary to ensure the representativeness of the sample for the structures, systems and components to be evaluated and to apply appropriate evaluation methods and procedures according to the structure, material and type of contamination. Therefore, the radiological characterization is divided into concrete and structures, systems and components, and reactor vessel, reactor vessel internal and bioshield concrete. In this study, the types depending on generation characteristics and radiological characterization methods and process of solid radioactive waste were analyzed. The results of this study can be used as a basis for the preparation of the FDP for the Kori unit 1.
        8.
        2023.05 구독 인증기관·개인회원 무료
        This study presents a methodology to determine the radionuclides of concern that are expected to be found during the final status survey of Kori Unit 1 decommissioning. The methodology involved reflecting the evaluation results of ORIGEN based on reference documents such as NUREG/CR-3474, NUREG/CR-4289, NUREG/CR-0130, WINCO-1191, and representative fuel loading. A list of potential radionuclides of concern was provided by reflecting the list of radionuclides of concern included in the Kori Unit 1 decommissioning plan. To select the radionuclides of concern, we analyzed the approach of US decommissioning plants based on the recommendations of NUREG-1757 Vol.2 Rev.1 and excluded certain radionuclides from the list. The final list of 23 radionuclides of concern was derived by excluding radionuclides that have a short half-life, low specific activity, analytically difficult to measure, inert gases, or naturally occurring radionuclides. This methodology can be applied to other nuclear power plants, such as the Wolsong Nuclear Power Plant, by reflecting the unique characteristics of the reactor.
        9.
        2023.05 구독 인증기관·개인회원 무료
        Kori Unit 1 is about 600MW Pressurized Light Water Reactor as WH type. KHNP got an approval for construction and operation of Kori unit 1 on May 31, 1972 and started commercial operation from Apr. 29, 1987. And then, it was decided to permanently suspend it on Jun. 18, 2017 after 40 years of commercial operation. The Nuclear Safety Act stipulates that if a commercial nuclear power plant is permanently suspended, the utility must submit a Final Decommissioning Plan (FDP) within 5 years. So, KHNP, the utility, developed a FDP for Kori Unit 1 and submitted it to the government in May 2021. In South Korea, the FDP is to be prepared in accordance with the relevant notices and consists of 11 major chapters such as (1) Decommissioning Plan Overview, (2) Project management, (3) Status of Site and Environmental, (4) Decommissioning Strategies and Method, (5) Ease of Decom. Design characteristic, (6) Safety Analysis, (7) Radiation Protection, (8) Decontamination and Dismantling, (9) Radioactive Waste Management, (10) Environmental Impact Analysis, (11) Fire Protection and (12, 13) Etc., References and Glossary. KHNP has prepared a strategy and system consisting of three areas such as R&D, Engineering and licensing document development to prepare the final decommissioning plan for Kori Unit 1. The promotion system for the preparation of the FDP for Kori Unit 1 is composed of Engineering (HAS Characterization, Dismantling Safety Evaluation, Radiological Environmental Report, Radioactive Waste Treatment and Facility Construction), R&D(KHNP R&D Results such as Process/Work Package /Cost Estimation, Safety Analysis, Contamination and Exposure, Guide for Detailed Characteristic, Site Safety Analysis, RV & RVI Dismantling Process, etc.), Overseas case lessons learned(Taiwan unit 1 NPP FDP and Spain Zorita NPP FDP analysis) and Development of Licensing Document. KHNP completed the initial completion of the Final Decommissioning Plan for Kori Unit 1 in March 2020 and carried out collecting residents’ opinions through public hearings. And then, KHNP supplemented the results of the residents’ opinions and applied for license to the Nuclear Safety and Security Commission in May, 2021. Now, KHNP are responding to the FDP licensing review.
        10.
        2022.10 구독 인증기관·개인회원 무료
        In operating or permanently shut down nuclear power plants which were built between 1970s and 1990s, asbestos was widely used for ceiling materials, wall materials, and gaskets. Furthermore, it was mainly treated as a heat-resistant material like insulation. In Kori Unit 1, radioactive asbestos was replaced or removed through maintenance and repair in the containment building during the operation period of about 40 years, but radioactive asbestos still remains that need to be partially dismantled. Generally, it is more difficult to handle because it belongs to two different waste categories, radioactive waste and hazardous waste. In addition, the risk increases further due to radioactivity with the asbestos hazards itself. Therefore, it is very important to accurately determine the amount of radioactive asbestos waste and to evaluate the treatment method and disposal reduction rate before the decommissioning is started. According to the Korean Waste Management Act, three methods are recommended for the asbestos (hazardous waste) treatment: landfill, solidification, and high-temperature melting. Landfill is commonly used in Korea and the United States while high-temperature melting and solidification are additionally recommended only in Korea. Considering the situation in Korea, landfill is not appropriate due to the limitations of landfill capacity and potential risks (hazards still remain). Therefore, the other two methods can be considered sufficiently in terms of safety, detoxification, and reduction rate. This paper evaluates the amount of radioactive asbestos waste at Kori Unit 1 based on the actual asbestos building material data (as of February 2022) of the Asbestos Management Comprehensive Information Network. Vitrification is considered as a sufficient alternative for treating radioactive asbestos waste. And, it is checked whether the vitrified waste through the high-temperature melting method, plasma torch, meets the requirements such as detoxification, compressive strength and leachability for storage and disposal stability. It is expected to be useful to prepare a radioactive mixed waste management standard and to reduce the disposal cost through the reduction of final waste.
        13.
        2020.12 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        Currently, radioactive waste for disposal has been restricted to low and intermediate level radioactive waste generated during operation of nuclear power plants, and these radioactive wastes were managed and disposed of the 200 L and 320 L of steel drums. However, it is expected that it will be difficult to manage a large amount of decommissioning waste of the Kori unit 1 with the existing drums and transportation containers. Accordingly, the KORAD is currently developing various and largesized containers for packaging, transportation, and disposal of decommissioning waste. In this study, the radiation exposure doses of workers and the public were evaluated using RADTRAN computational analysis code in case of the domestic onroad transportation of new package and transportation containers under development. The results were compared with the domestic annual dose limit. In addition, the sensitivity of the expected exposure dose according to the change in the leakage rate of radionuclides in the waste packaging was evaluated. As a result of the evaluation, it was confirmed that the exposure dose under normal and accident condition was less than the domestic annual exposure dose limit. However, in the case of a number of loading and unloading operations, working systems should be prepared to reduce the exposure of workers.
        4,300원
        16.
        2020.08 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        본 논문에서는 고리 1호기 해체 비용 추정을 위해 외국 원자력발전소 해체 비용 데이터를 현가화한 후 원자력발전소 해체 비용 추정 회귀 분석모델을 개발하였다. 이 모델 개발에 사용된 데이터는 해체 또는 진행 중인 BWR 13기, PWR 16기의 해체 비용 데이터이다. 회귀 분석모델 도출을 위해, 해체 비용을 종속변수로 정하고, 해체 원전의 운전 특성을 반영할 수 있게 고 안된 Contamination factor와 해체 기간을 독립변수로 선정하였다. 빅데이터 분석 도구인 R language의 통계패키지를 이용 하여 회귀 분석모델을 도출하였다. 이 회귀 분석 모델을 적용하여 고리 1호기 해체 비용을 예측한 결과, 미화 663.40~928.32 백만 달러, 한화 약 7,828.12억~1조 954.18억 원이 소요될 것으로 예측되었다.
        4,600원
        20.
        2018.09 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        대한민국 첫 상업원전인 고리1호기는 40년간의 성공적인 운전을 끝내고 2017년 6월 18일 영구정지 되었다. 고리1호기는 본격적인 해체에 앞서 터빈건물에 폐기물처리시설 건설을 계획하고 있다. 각종 방사성폐기물은 폐기물처리시설에서 제염, 해체, 절단, 용융되어 자체처분 되거나 방사성폐기물 처분장으로 보내 진다. 해체폐기물 중 대형금속방사성폐기물은 주로 1차 계통측 기기들로 높은 방사능을 띄고 있어 해체활동 중 작업자의 피폭관리가 필요하다. 본 논문에서는 대형금속방사성폐기물 중 크기가 가장 크고 형상이 복잡한 증기발생기를 선정하여 RESRAD-RECYCLE 코드를 이용하여 작업자 피폭선량을 평가하고 저감화 방안을 수립 하고자 한다.
        4,200원
        1 2