The spent filters stored in Kori Unit 1 are planned that compressed and disposed for volume reduction. However, shielding reinforcement is required to package high-dose spent filters in a 200 L drum. So, in this study suggests a shielding thickness that can satisfy the surface dose criteria of 10 mSv·h−1 when packaging several compressed spent filters into 200 L drums, and the number of drums required for the compressed spent filter packaging was calculated. In this study, representative gamma-emitting nuclides in spent filter are assumed that Co-60 and Cs-137, and dose reduction due to half-life is not considered, because the date of occurrence and nuclide information of the stored spent filter are not accurate. The shielding material is assumed to be concrete, and the thickness of the shielding is assumed to 18 cm considering the diameter of the spent filter and compression mold. Considering the height of the compressed spent filter and the internal height of the shielding drum, assuming the placement of the compressed spent filter in the drum in the vertical direction only, the maximum number of packaging of the compressed spent filter is 3. When applying a 18 cm thick concrete shield, the maximum dose of the spent filter can packaged in the drum is 125 mSv·h−1, so when packaging 3 spent filters of the same dose, the dose of a spent filter shall not exceed 41 mSv·h−1 and not exceed 62 mSv·h−1when packing 2 spent filters. Therefore, the dose ranges of spent filters that can be packaged in a drum are classified into three groups: 0–41 mSv·h−1, 41–62 mSv·h−1, and 62–125 mSv·h−1based on 41 mSv·h−1, 62 mSv·h−1, and 125 mSv·h−1. When 227 spent filters stored in the filter room are classified according to the above dose group, 207, 3 and 4 spent filters are distributed in each group, and the number of shielding drums required to pack the appropriate number of spent filters in each dose group is 75. Meanwhile, 8 spent filters exceeding 125 mSv·h−1 and 5 spent filters that has without dose information are excluded from compression and packaging until the treatment and disposal method are prepared. In the future, we will segmentation of waste filter dose groups through the consideration of dose reduction and horizontal placement of compressed spent filters, and derive the minimum number of drums required for compressed spent filter packaging.
A paradigm shift in the government’s energy policy was reflected in its declaration of early closure of old nuclear plants as well as cancellation of plans for the construction of new plants. To this end, unit 1 of Kori Nuclear Power Plant was permanently shut down and is set for decommission. Based on these changes, the off-site transport of spent fuels from nuclear power plants has become a critical issue. The purpose of this study is to develop an optimized method for transportation of spent fuels from Kori Nuclear Power Plant’s units 1, 2, 3, and 4 to an assumed interim storage facility by simulating the scenarios using the Flexsim software, which is widely used in logistics and manufacturing applications. The results of the simulation suggest that the optimized transport methods may contribute to the development of delivery schedule of spent fuels in the near future. Furthermore, these methods can be applied to decommissioning plan of nuclear power plants.
원전 해체 시 원자력설비는 안전하게 해체되어야 한다. 고리 1호기나 월성 1호기와 같은 노후화된 원전의 경우 곧 원전 해 체를 계획하고 있는 대상 원전이지만, 이 원전들의 가동 중단 후 해체 시 선원항 평가 기준, 제염 및 해체 기술 등의 독자적 인 국내 기술 확보는 미흡한 실정이다. 본 연구의 목적은 원전 선원항 평가 기술 중 하나로 In-Situ 기법을 이용하여 대형 원 전 기기를 직접 측정하여 측정대상체에 대한 선원항 평가방법을 개발하는 것이다. 원자로 헤드를 별도의 해체 없이 이동형 감마핵종분석기를 이용하여 직접 측정법으로 분석하고 간접 측정을 병행하여 측정 결과를 보완하였다. 그리고, 표면오염시 료는 방사화학분석을 수행하였다. 분석 결과를 확장하여 원자로의 핵종 재고량을 계산하였다. 본 연구 결과를 토대로 각 핵 종별 방사능량 변화에 따라 해체 시점을 결정할 수 있으며, 원전 해체 시 작업자의 피폭 저감에 도움이 될 것으로 기대한다.
고리 원전 사용후핵연료 저장조의 저장용량을 확보하기 위하여 2002년부터 사용후핵연료 운반용기를 이용하여 400다발 이상의 PWR 사용후핵연료 집합체를 원전부지 내에 수송, 저장하였다. 이를 위하여 KN-12 운반용기, 관련장비 및 수송차량으로 구성되는 수송시스템을 구성하였다. KN-12 운반용기는 국내 원자력법 및 IAEA의 수송규정에 따라 설계, 제작되고, 정부로부터 인허가를 획득하였으며, 취급장비 역시 관련규정에 따라 구비하였다. 수송 저장작업은 2 대의 운반용기를 동시에 투입하여 수행하였으며, 모든 작업공정에 대하여 엄격한 품질관리 및 방사선 안전관리를 수행하여 수송 안전성을 확보하고 신뢰도를 제고하였다.