PURPOSES: The purpose of this study is to analyze the characteristics of the weight values of evaluation items by traffic safety project type.
METHODS: In general, a large-scale investment in projects such as the traffic safety project requires economic analyses to be performed in advance. However, there is an argument for considering special characteristics of the traffic safety project. Therefore, this study conducted characteristic analysis of the weight values of evaluation items. The analysis consisted of two steps. The first step was hypothesis verification using analysis of variance (ANOVA). In this process, the authors examined whether the weight of evaluation items is the same regardless of the traffic safety project type. Based on the first step's results, the authors proceeded to the second step. The objective of this step was to analyze how different the weight values are by traffic safety project type using an analytic hierarchy process.
RESULTS: According to the ANOVA test results, the benefit to cost ratios have different weight values based on traffic safety project type at the 0.01 significance level. The policy evaluation items, such as the plans connection, resident opinion, and regional equity, also showed the same results except that the result for the related plans connection was statistically significant at the 0.05 level. Based on the first step's result, the AHP analysis in the second step showed that the traffic safety projects for vulnerable users and pedestrians have very low weight values in economic evaluation factors compared with other safety project types. The weight values for vulnerable users and pedestrians were 0.29 and 0.26, respectively, in economic evaluation items. On the other hand, the weight values for other safety project types were around 0.6. Among the policy evaluation items, resident opinion showed a higher weight value than other factors, such as connection and regional equity items.
CONCLUSIONS: The social and economic impact of a traffic safety project varies by project type and project characteristics. Although the economic approach is overarching and a reasonable methodology is applied for large-scale projects, it should be noted that the safety issue, especially for transportation of vulnerable uses, requires a non-economical approach. Based on the analysis results, this study suggests that the priority of the projects should be determined by separating them into independent assessment groups depending on their characteristics.
The Istanbul Strait is one of the important waterways in the world. And its southern entrance has a highly congested local traffic. Till now there are several studies regarding how the Istanbul Strait is dangerous to navigate and how those dangers can be mitigated. But there is no study regarding local traffic which is posing great collision risk. In a certain traffic area, marine traffic safety assessment parameters are traffic volume, frequency of collision avoidance maneuver, traffic density, traffic flow and potential encounter, In this paper local traffic volume, traffic flow and potential encounter number of local traffic vessels and possibility of collision are investigated in order to find degree of danger at the southern entrance of the Istanbul Strait. Finally by utilizing those, risky areas are determined for southern entrance of the Istanbul Strait. Results have been compared to a previous study regarding risk analysis at congested areas of the Istanbul Strait (Aydogdu, 2006) and consistency of the results were presented.
이 연구는 해상교통안전시설에 관한 운영효과를 분석한다. 해상교통안전시설의 운영효과는 크게 안전편익, 수송편익 그리고 기타편익으로 나눌 수 있다. 안전편익은 해상교통안전시설을 설치 및 운영함으로써 해양사고가 감소됨에 따른 해상교통의 손실회피비용으로 산출된다. 이를 위하여 각 해당 시설에 대한 해양사고 감소율을 산정하고, 손실회피비용의 세부 모델을 구축한다. 또한 이에 대한 각 변수를 정의하고 계산식을 제시한다. 이 모델을 목포청의 항로표지집약관리시스템에 적용하여 안전편익을 산출하였다.