검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 16

        1.
        2022.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Heavy bitumen scattered in the underground sedimentary layer is a kind of unconventional energy source, and by extracting it, a production well is excavated in the sedimentary layer and high-temperature and high-pressure steam is injected to reduce the viscosity of bitumen and recover it to the ground steam assisted method is applied. As a recovery method that uses the steam effect of the dilution effect of solvent injection, it is a recovery method that can increase thermal efficiency. In this study, the process system of the central processing facility(CPF) of the hybrid steam-solvent recovery method that injects solvent into the existing steam assisted method was analyzed, and the core facilities for each process were identified, and hybrid steam-solvent recovery compared to the existing steam assisted method. In the case of the method, it was evaluated that the amount of steam supply and all utility costs decreased according to the solvent injection.
        4,000원
        2.
        2022.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The purpose of this study is to use the hybrid steam-solvent process, because it is created in the form of water, bitumen, and water/bitumen emulsion by hot steam, so effective separation is required. Methods for separating the emulsion include a chemical separation method by adding a chemical, a separation method using an electrostatic property, a separation method using a membrane, a separation method using a microwave, and the like. Among them, the most used method is the separation method using a chemical, and it is reported that the separation efficiency of the emulsion is the best. In this study, a method for efficiently separating bitumen emulsions using a chemical separation method adding an emulsifier was investigated. In particular, technological trends in oil sand oil treatment technology were analyzed based on patent analysis.
        4,000원
        3.
        2021.08 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In this study, for the treatment efficiency of the IGF process for the treatment of produced water (PW) discharged from the oil sands plant, the bench-scale oil sands plant PWT package was designed, manufactured and evaluated to verify the efficiency of the process. The microbubble generation efficiency and microbubble size change according to the circulation pump pressure were observed, and the correlation between influent concentration and temperature, residence time and oil-water separation performance was analyzed.
        4,000원
        4.
        2021.08 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Thermal and wind panels are installed on offshore oil and gas platforms to protect personnel, equipment and structures. However, in general, panels are designed and manufactured through trial and error based on performance tests. For this reason, it is difficult to develop and design a heat sink in the Korean shipbuilding and offshore equipment industry due to the lack of performance test data and limited experience. In this study, the experimental results performed to verify the performance of the thermal and wind panels were analyzed, and the characteristics and performance characteristics of the thermal and wind panels were investigated. The conclusions drawn from this study will be useful in terms of the design and development of shielding.
        4,000원
        5.
        2021.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Eutrophication and algal blooms can lead to increase of taste and odor compounds and health problems by cyanobacterial toxins. To cope with these eco-social issues, Ministry of Environment in Korea has been reinforcing the effluent standards of wastewater treatment facilities. As a result, various advanced phosphorus removal processes have been adopted in each wastewater treatment plant nation-widely. However, a lot of existing advanced wastewater treatment processes have been facing the problems of expensive cost in operation and excessive sludge production caused by high dosage of coagulant. In this study, the sedimentation and dissolved air flotation (SeDAF) process integrated with sedimentation and flotation has been developed for enhanced phosphorus removal in wastewater treatment facilities. Design and operating parameters of the SeDAF process with the capacity of 100 m3/d were determined, and a demonstration plant has been installed and operated at I wastewater treatment facility (located in Gyeonggi-do) for the verification of field applicability. Several empirical evaluations for the SeDAF process were performed at demonstration-plant scale, and the results showed clearly that T-P and turbidity values of treated water were to satisfy the highest effluent standards below 0.2 mg/L and 2.0 NTU stably for all of operation cases.
        4,600원
        6.
        2020.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        To remove phosphorus from the effluent of public wastewater treatment facilities, hundreds of enhanced phosphorus treatment processes have been introduced nationwide. However, these processes have a few problems including excessive maintenance cost and sludge production caused by inappropriate coagulant injection. Therefore, the optimal decision of coagulant dosage and automatic control of coagulant injection are essential. To overcome the drawbacks of conventional phosphorus removal processes, the integrated sedimentation and dissolved air flotation(SeDAF) process has been developed and a demonstration plant(capacity: 100 m3/d) has also been installed. In this study, various jar-tests(sedimentation and / or sedimentation·flotation) and multiple regression analyses have been performed. Particularly, we have highlighted the decision–making algorithms of optimal coagulant dosage to improve the applicability of the SeDAF process. As a result, the sedimentation jar-test could be a simple and reliable method for the decision of appropriate coagulant dosage in field condition of the SeDAF process. And, we have found that the SeDAF process can save 30 – 40% of coagulant dosage compared with conventional sedimentation processes to achieve total phosphorus (T-P) concentration below 0.2 mg/L of treated water, and it can also reduce same portion of sludge production.
        4,500원
        7.
        2019.08 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Modularization is an important benefit to overall project cost, such as construction period, manpower and logistics. In order to establish a successful modularization strategy, the optimum cost can be realized based on the Envelope Size which is allowed to be transferred to the plant site through analysis of each shape of the module. Through the analysis of the plant structure, the Envelope Size that can be transported on site in units of sizes suitable for maritime and onshore is provided, and finite element method is applied to the existing materials (A36, A572) and domestic materials (SS400, SM490, SWH400) and analyzed the results of the analysis to obtain domestic materials applicable to the plant structure frame.
        4,000원
        9.
        2019.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The algal blooms in stagnant streams and lakes have caused many problems. Excessive algae leads to disturbance of ecosystem and overload of water treatment processes. Therefore, phosphorus(P), source of algal blooms, should be controlled. In this study, a filtration trench has been developed to convert dissolved phosphorus into hydroxyapatite(HAP) so that it could be crystallized on the surface of ‘phosphorus removal granular material’; and residual particulate phosphorus could be removed by additional precipitation and filtration. The front and rear parts of filtration trench consisted of ‘phosphorus removal granular material contact bed’ and ‘limestone filtration bed’, respectively. As a result of the column test using phosphorus removal granular material and limestone serially, PO4-P was removed more than 90% when EBCT(empty bed contact time) of the contact bed was over 20 minutes; and T-P represented 60% of removal efficiency when total EBCT was over 1.5 hours. The results of column tests to figure out the sedimentation characteristics showed that more than 90% of particulate phosphorus could be removed within 24 hours. It was necessary to optimize the filtration part in order to increase removal efficiency of T-P additionally. Also, it was confirmed through the simulation of Visual MINTEQ that most of particulate phosphorus in the column tests is the form of HAP. Based on the results of the study, it could be suggested that the design parameters are over 0.5 hour of EBCT for phosphorus removal granular material contact bed and over 1.5 hours of EBCT for limestone filtration bed.
        4,000원
        10.
        2018.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Water quality improvement processes for stagnant area consist mainly of technologies applying vegetation and artificial water circulation, and these existing technologies have some limits to handle pollution loads effectively. To improve the purification efficiency, eco-friendly technologies should be developed that can reinforce self-purification functions. In this study, a multi-functional floating island combined with physical · chemical · biological functions (① flotation and oxidization using microbubbles, ② vegetation purification and ③ bio-filtration with improved adsorption capacity) has been developed and basic experiments were performed to determine the optimal combination conditions for each unit process. It has been shown that it is desirable to operate the microbubble unit process under conditions greater than 3.5 kgf/cm2. In vegetation purification unit process, Yellow Iris (Iris pseudacorus) was suggested to be suitable considering water quality, landscape improvement and maintenance. When granular red-mud was applied to the bio-filtration unit process, it was found that T-P removal efficiency was good and its value was also stable for various linear velocity conditions. The appropriate thickness of filter media was suggested between 30 and 45 cm. In this study, the optimal design and operating parameters of the multi-functional floating island have been presented based on the results of the basic experiments of each unit process.
        4,200원
        11.
        2017.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In the coagulation/sedimentation (C/S) process of the water treatment process, the inflow of massive algal bloom causes many problems including fouling of filter media. This study was conducted to find out the way to remove the algae’s harmful effects by addition of pre-treatment prior to C/S process. Many Jar-tests were conducted such as ① ACF (Algae Coagulation·Flotation) process using natural algae coagulant (Water Health®), ② ACF + C/S process and ③ C/S process with a variety of conditions using cultured algae. The average values of turbidity were ① 0.42 NTU for ACF process, ② 0.13 NTU for ACF + C/S process and ③ 0.25 NTU for C/S process. It was shown that the treatment efficiency of ACF process could get low turbidity results, and ACF + C/S process could achieve more efficient results than those of C/S process. Any negative effects of ACF process to the efficiency of C/S process were not observed in ACF + C/S process. In order to reduce the unfavorable effects of algae, it was found out that the introduction of ACF process in the forms of ① ACF or ② ACF + C/S could be one of the effective and alternative solutions.
        4,300원
        12.
        2012.04 구독 인증기관 무료, 개인회원 유료
        본 논문은 개인정보보호법의 벌칙조항 및 양벌규정을 기관 및 기업체의 CEO 및 최 고경영자의 관점에서 제 70조에서 제75조의 벌칙조항을 구체적이고 간결하게 기술하 였다. 이 논문의 주요 구성은 제정된 개인정보보호법에 관하여 먼저, 개인정보의 정의, 개인정보의 유형, 개인정보의 특성을 알아보았다. 또한 개인정보보호법에 대한 주요내 용과 경영진의 주요 관심사인 개인정보보호법의 처벌조항과 양벌규정에 대해 연구하 였다.
        4,200원
        13.
        2001.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        4,900원