검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 76

        3.
        2023.11 구독 인증기관·개인회원 무료
        In the case of nuclear projects, when developing a new reactor type, it is necessary to confirm the reactor type, secure the safety, and especially obtain the construction permit approval of the licensing authority for construction. Schedule management is necessary to carry out nuclear projects, and progress rate management of project progress management is largely composed of three elements: scope management, cost management, and resource management. However, in the case of the small modular reactor (SMR) project currently being carried out, it is difficult to calculate the progress rate including budget and resources due to the nature of the project. Therefore, in the SMR project, it took two years from the beginning to prepare the integrated project master schedule (IPMS) to prepare the draft, and then two revisions were made over a year and a half. In this SMR project, we will consider the entire construction period such as design, purchase and production, construction, commissioning, and operation in terms of scope management. The entire document list was created using the document review and approval sheet created at the beginning of the design. In the PMIS (Project Management Information System), the number of approved documents was calculated by comparing the list of engineering documents. In the purchase production part, the main core equipment such as the primary system nuclear steam supply system (NSSS), the secondary system turbine and condenser, and the man machine interface system (MMIS) are managed. Purchasing and manufacturing management shall be managed so that major equipment can be delivered in a timely manner in accordance with the schedule for delivery of equipment in the IPMS. In order to prevent delays in the start of production, it is necessary to minimize the waiting time for work through advance management tasks such as insurance of drawing, stocking of materials, availability of production facilities, etc. In this way, we decided to carry out the schedule management for the design, purchase and manufacturing part in the SMR project first, and the installation, construction and commissioning part will be prepared for the future schedule management.
        9.
        2022.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        최근 AI 기술은 하루가 다르게 빠르게 발전하고 있고, AI기술은 각 분야에서 다양하게 사용되어지고 있다. 본 논문은 예술분야에서 AI기술의 활용으로 COVID-19 상황에서 인간관계, 개인적인 이유로 지친 마음을 위 로해주는 힐링 게임을 제작하였다. 제작한 힐링게임에서는 주로 Self-help-therapy의 효과를 얻을 수 있어, 치 료자의 도움없이 이용자가 힐링게임을 통하여 일상적 이용과정에서 치유적 효과를 얻을 수 있는 것을 기대 하고 있다. 게임 리뷰 데이터를 통계 분석하여 힐링게임으로 대중들이 요구하는 부분을 수용하여 힐링게임 이 제작되었으며, 사용자는 게임 시작 전 간단한 스토리라인과 AI와 상호작용할 수 있는 간단한 대화를 통 화여 Self-help-therapy 효과를 얻을 수 있었다.
        4,000원
        1 2 3 4