검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 7

        1.
        2025.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The rotary type dust remover is a device in which the rake assembly filters and processes clumps in the water while rotating and repeating movements along the track. It is installed in the pump suction part of the drainage pump station and the rainwater pump station to protect the pump to ensure smooth drainage. Since the rake assembly plays a key role in filtering out complications while passing through the water, stainless steel is applied to all components constituting it, and damage or failure due to deformation causes a crisis in case of heavy rain. This is because the existing rake assembly is excellent in rigidity, but all components are assembled by welding, which takes a lot of time for repair and replacement. In this study, shape design for rakes and assemblies of the rotary type dust remover, structural analysis to secure reliability, and demonstration tests were conducted through prototype production. Through this, it is intended to help prevent the stiffness of the joint of the rotary type dust remover from deteriorating, reduce time and cost, and efficient operation.
        4,000원
        2.
        2010.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This research deals with multiple Gantry-type assembly machines for the optimization of PCB assembly line. The automated assembly machine has 6 nozzles which can linearly move the X axis and the Y axis different from the turret type assembly machine. Each
        4,000원
        3.
        2008.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
          This paper improves algorithms for an assembly-type flowshop scheduling problem in which each job is to assemble two types of components and makespan is the objective measure. For the assembly, one type of the components is outsourced with job-dependent
        4,600원
        4.
        2006.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
          This paper considers an assembly-type flowshop scheduling problem in which each job is assembled with two types of components. One type of the components is outsourced with positive lead time but the other type is fabricated in-house at the first stage.
        4,000원
        5.
        2004.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This paper considers a scheduling problem concerned with an assembly system where two components are first treated in their own parallel machines and then pulled to be assembled into a final product at a single assembly machine. The objective measure is t
        4,000원
        7.
        2001.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The purpose of this paper is to solve the problem that is occuring in assembly process and to progress the productivity by process analysis methods for manu-open and closed model(DWV-20/25DRG), and auto-open and cloesd model(DWV-20/25/DRA)-ventilation fan. Also, this paper is studied by data of 'D' company's product.
        4,000원