In this paper, we present a new way to derive the mean cycle time of the G/G/m failure prone queue when the loading of the system approaches to zero. The loading is the relative ratio of the arrival rate to the service rate multiplied by the number of servers. The system with low loading means the busy fraction of the system is low. The queueing system with low loading can be found in the semiconductor manufacturing process. Cluster tools in semiconductor manufacturing need a setup whenever the types of two successive lots are different. To setup a cluster tool, all wafers of preceding lot should be removed. Then, the waiting time of the next lot is zero excluding the setup time. This kind of situation can be regarded as the system with low loading. By employing absorbing Markov chain model and renewal theory, we propose a new way to derive the exact mean cycle time. In addition, using the proposed method, we present the cycle times of other types of queueing systems. For a queueing model with phase type service time distribution, we can obtain a two dimensional Markov chain model, which leads us to calculate the exact cycle time. The results also can be applied to a queueing model with batch arrivals. Our results can be employed to test the accuracy of existing or newly developed approximation methods. Furthermore, we provide intuitive interpretations to the results regarding the expected waiting time. The intuitive interpretations can be used to understand logically the characteristics of systems with low loading.
발전소 구조재료의 일반부식에서 기인된 부식생성물은 연료 표면에 침적되어 방사화되고, 다시 노외로 방출되어 계통 선량 율을 증가시킨다. 본 연구에서는 방사화된 크러드의 생성과정에 대한 이해를 높이고자 연료 크러드의 비방사능 값과 노내 체류시간을 계산하였다. 노내 체류시간 계산시 모핵종이 조사기간 동안 지속적으로 일정한 양만큼 침적되는 것으로 가정하 였다. 본 연구에 활용된 연료 크러드 시료는 한울1호기 17차 O/H시 fuel scraping을 통해 채취되었으며, 본 연구를 위해 원 소성분 분석과 핵종 분석이 수행되었다.
This paper is to analyze the cycle time of the vendor in a single-vendor multi-buyers supply chain. The vendor is the manufacturer and the buyers are the retailers. The cycle time of the vendor is the elapse time from the beginning time of the production to the beginning time of the next production. The cycle time of the vendor that minimizes the total cost in a supply chain is analyzed. The cost factors are the production setup cost and the inventory holding cost of the vendor, the ordering cost and the inventory holding cost of the retailers. The cycle times of the vendor obtained with the costs of the vendor is compared with those obtained with the costs of the vendor and the retailers. Various numerical examples are tested if the cycle times of the vendor for both methods are the same.
The study proposes three types of production lead time according to the production or demand pattern. First of all, it discusses the difference of three lead times. While pitch time and cycle time are used in push system with process stock and mass conveyor production, the tact time is used in pull system like as JIT based lean production system.
신뢰성 평가 시험은 종종 성능 평가에 장기간의 시간이 요구되며, 전체 생산비용까지 증가시키는 문제점을 안고 있다. 스트레스를 이용한 가속수명시험은 제품의 신뢰성 고장과 밀접한 관련이 있는 고장 메커니즘의 촉진을 통해 고장에 이르는 기간을 단축함으로써 신뢰성 평가의 효율성을 도모할 수 있다. 본 연구에서는 이러한 스트레스 가속 시험에 빈도가속(Usage-Rate Acceleration) 또는 판정가속(Tightening Critical-Values) 등을
비글개 6두에서 11회(임신견 7두, 비 임신견 4두)의 발정 주기 및 임신 기간 동안 질 상피 세포 검사 및 혈장 progesterone과 estradiol- 농도를 측정하여 질 상피 세포상과 번식 호르몬의 관계를 조사하고 배란 및 교배 적기 판정을 위한 기초 자료를 제공하고자 본 실험을 실시하였다. 임신 예와 비 임신 예에 있어서 발정 전기, 발정기 및 발정 휴지기의 기간은 각각 및 그리고 및 일이었다. 임선 예에 비해 비 임신견의 발정 휴지기가 길
This paper addresses a model for the transportation planning that determines the transportation cycle time and the ve-hicle Size to minimize the cost In a distribution system The vehicle routing to minimize the transportation distance of the vehicles is a
본 연구는 소형 개의 불임 해결과 체외수정란을 생산하기 위한 방안의 하나로써 난자의 형태, 번식주기, 배양시간 및 활성화 처리가 난포란의 체외성숙 및 체외발생에 미치는 영향을 조사하였다. 1. 신선, salt 및 4에 보존한 난소로부터 채취한 난구세포부착 난자와 나화 난자로 각각 체외수정시켰을 때 16세포기로의 발생율은 14.3%, 5.0% 및 7.5%, 2.8%, 5.7% 및 0.0%로써 난구세포 부착난자군의 체외발생율이 나화 난자군에 비해 높게 나타