검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 11

        1.
        2024.03 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        Safe radiation management is essential not only for operational nuclear power plants but also for nuclear plants to be decommissioned. When spent nuclear fuel is present on-site, meticulous radiation emergency plans are necessary to ensure safety. In Korea, numerous radiation emergency plans have been established for operational nuclear reactors. These plans delineate distinct response mitigation measures for white, blue, and red emergencies. However, clear regulations are yet to be devised for radiation emergency plans for reactors to be decommission. Therefore, this study investigated the decommissioning plan and status of Kori unit 1 to comprehensively analyze the current status of decommissioning safety in Korea. In this study, radiation emergency plans of decommissioning nuclear power plants abroad were reviewed to confirm radiation emergency action levels. Furthermore, radioactive waste treatment facilities, to be used for decommissioning reactors in Korea were evaluated. Moreover, the study assessed emergency plans (especially, emergency initiating conditions) for operational nuclear power plants in Korea for potential use in the decommissioning phase. This study proposed an emergency initiating condition that can be used for decommissioning reactors in Korea. Considering the anticipated introduction of plasma torch melting facility in Korea, this study examined the conditions of radiation emergency plans can be altered. This study identified effective measures and guidelines for managing radiological emergency initiating conditions, and effective decommissioning of nuclear power plants in Korea.
        4,600원
        2.
        2024.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : The objective of this study was to review roadway management strategies that can be utilized in the event of a radiological emergency, select feasible alternatives, and simulate a portion of the West Coast network to analyze the effectiveness of these strategies. METHODS : The methodology of the study involved reviewing the relevant literature, extracting the implications, establishing an analysis procedure, and selecting an effectiveness evaluation scale. Using a national transportation database, a network was constructed using Toba, a macroscopic model. RESULTS : A reverse-flow lane system was applied to the West Coast Expressway Glory IC–Hampyeong IC (total 25 km), and a plan to increase the number of lanes was applied to the Seokgyo Street–Shinpyeong Intersection on National Route 23 (total extension 28 km). Consequently, both road management strategies were found to be effective. CONCLUSIONS : This study examined roadway management strategies that can be utilized in the event of a radiological emergency, selected feasible alternatives, and simulated a portion of the West Coast network to verify the effectiveness of these strategies. In the case of reverse flow lanes, it is most effective when applied to expressways that can restrict the entrance and exit of vehicles. In the case of increasing the number of lanes, it is most effective when applied to general roads, and institutional arrangements should be made to enable two-way traffic to use the reserved shoulder lanes.
        4,000원
        3.
        2023.11 구독 인증기관·개인회원 무료
        South Korea’s first commercial nuclear reactor, Kori Unit 1, was permanently shut down in 2017, and preparations are currently underway for its decommissioning. After the permanent shutdown, the spent nuclear fuel from the reactor core is removed and stored in a spent fuel storage facility. Subsequently, steps are taken for its permanent disposal, and if a permanent disposal site is not determined, it is stored in an interim storage facility (or temporary storage facility). Therefore, the activation criteria for radiation emergency plans vary depending on the movement of spent nuclear fuel and the storage location. In this study, it reviewed emergency plans in the U.S. NRC Regulatory Guide (Draft) titled ‘Emergency Planning for Decommissioning Nuclear Power Reactors’ to determine the requirements for radiation emergency plans needed for decommissioned nuclear power plants. Additionally, by examining emergency plans applied to decommissioning nuclear power plants in the United States, this study identified emergency plan requirement that could be applicable to future decommissioned nuclear power plants in South Korea. This study will contribute to the establishment of appropriate radiation emergency plans for decommissioning nuclear power plants in Korea for providing accurate information on overseas cases and relevant guidelines.
        5.
        2022.05 구독 인증기관·개인회원 무료
        Once a radioactive material is released from the nuclear power plant (NPP) by accident, it is necessary to understand the behavior of radioactive plume to protect residents adequately. For this, it is essential to measure the radiation dose rate around NPPs at important locations. Our previous study developed a movable radiation detector that can be installed quickly in an accident to measure gamma dose rate in areas where environmental radiation monitoring system is not installed. The data measured by the detector are transmitted to the server in real-time through LoRA wireless communications. There are two methods to use LoRA communications; one is self-network, and the other is the network provided by the mobile carrier. A signal receiver, called a gateway, should be equipped near the installation location of radiation detectors to use a self-network without using the mobile carrier’s system. In other words, the movable radiation detectors we made can function if there should be any gateway near them. The distance capable of communication between gateway and detector is about 8 km in an open area without significant obstacles. Korea has many significant obstacles, such as mountains around most NPPs. Thus, the gateways could be installed in the proper position before the accident to operate the movable radiation detectors without problems. If the gateway is located at a high position like a mountain top, it could cover a wide area. In this study, the elevation database in the area around the NPPs was collected and analyzed to determine where gateways should be installed. The analysis range is limited in the urgent protective action planning zone. The optimization was also performed to minimize the number of gateways.
        8.
        2010.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        An Emergency Diesel Generator (EDG) installed in a nuclear power plant is the primary power source, supplying AC power to Class 1E power systems when the main turbine generator and offsite power source are not available. Thus, reliability of the EGD is essential for plant safety and availability. In this paper, the EDG is selected for a Long Term Asset Management (LTAM) strategy and the results are summarized briefly. The LTAM strategy is intended to provide an effective long-term planning tool for minimizing unplanned capability loss and then optimizing maintenance programs and capital investments consistent with plant safety and an identified plant operating strategy. Such an operating strategy might include license renewal or retaining the option for license renewal.
        4,000원
        9.
        2008.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        An emergency diesel generator(EDG) manufactured by a French company Wartsila SACM is a tandem type engine and consisted of two 10 cylindered diesel engines on each side. The maintenance manual provided by the manufacturer recommends that engine bearing be inspected every 15 years. However, it is difficult to inspect them because the manhole located in the lower compartment of the engine is too small for maintenance worker to access engine internals. Furthermore, the EDG should be disassembled and then overturned to inspect bearings unlike other EDG type. Such process will take longer period time than ordinary maintenance period. So it is not possible to inspect the main engine bearing and crank shaft during a routine or scheduled maintenance. In this paper, five methods are proposed and estimated to resolve the problem and the optimal maintenance method is chosen among them. The proposed optimal maintenance plan makes it possible to perform proper maintenance during regular maintenance period and to lower maintenance cost considerably.
        4,000원
        10.
        2005.12 KCI 등재 서비스 종료(열람 제한)
        본 논문은 광범위한 전력제어가 가능하고, PC 직렬통신 방식에 의해 원거리에서 시스템을 ON-OFF할 수 있으며, 시스템의 상태를 모니터링 할 수 있는 선박비상조명시스템의 전력제어특성 개선에 관해 연구한다. 제안된 시스템은 강압형 컨버터, 비상급전회로, 반 브리지 인버터, 형광램프기동회로, 마이크로프로세서 제어 및 멀티통신회로 등으로 구성된다. 실험을 통하여 과전류에 의한 해당 시스템의 정지와 주전원 차단시의 비상전원에 의한 신속한 급전을 확인할 수 있고, 입력전력은 35[%] 범위까지 제어됨을 확인한다. 또한, 원거리에서 원하는 시스템을 ON-OFF 하고, 시스템의 전력, 전압, 전류, 배터리 전압 등의 모니터링도 한다.
        11.
        2004.10 KCI 등재 서비스 종료(열람 제한)
        본 논문은 선박비상조명용 디지털 전원장치의 개발에 관해 연구하였으며, 비상조명용 전원장치는 비상급전시스템, 반 브리지 인버터, 형광램프 기동회로 및 마이크로프로세서 제어시스템 등으로 구성되어 있다. 실험을 통하여 기존의 아날로그형 비상급전시스템에 비해 신속하고 안정된 전력이 공급되고 있음을 확인하고, 인버터의 펄스주파수 가변에 의한 조명제어가 잘 이루어지고 있음을 확인한다.