검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 28

        2.
        2020.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The purpose of this study is to investigate the distribution patterns of displacement and acceleration fields in a nonlinear soil ground based on the interaction of high-speed train, wheel, rail, and ground. For this purpose, a high-speed train in motion was modeled as the actual wheel, and the vertical contact of wheel and rail and the lateral contact, caused by meandering motion, were simulated; this simulation was based on the moving mass analysis. The soil ground part was given the nonlinear behavior of the upper ground part by using the modified the Drucker– Prager model, and the changes in displacement and acceleration were compared with the behavior of the elastic and inelastic grounds. Using this analysis, the displacement and acceleration ranges close to the actual ground behavior were addressed. Additionally, the von-Mises stress and equivalent plastic strain at the ground were examined. Further, the equivalent plastic and total volumetric strains at each failure surface were examined. The variation in stresses, such as vertical stress, transverse pressure, and longitudinal restraint pressure of wheel-rail contact, with the time history was investigated using moving mass. In the case of nonlinear ground model, the displacement difference obtained based on the train travel is not large when compared to that of the elastic ground model, while the acceleration is caused to generate a large decrease.
        4,000원
        3.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        이 논문에서는 고속철도교량 설계를 위한 활하중 모델을 통계 및 확률적 방법으로 검토하고, 하중조합의 하중계수가 주는 안전율을 분석하였다. 이 연구는 철도교량 설계기준에 대한 한계상태설계법 개발의 일환이며, 이를 위하여 경부고속철도를 운행하는 열차를 대상으로 약 한달 동안 실측하여 데이터를 수집하고 분석하였다. 이 데이터를 대상으로 교량의 설계수명에 맞도록 4가지 통계 방법들을 적용하여 설계하중을 추정하여 비교․검토하였다. 또한, 철도교량의 설계하중조합이 주는 안전율을 검토하기 위하여 신뢰도지수를 구하고 이를 분석하였다. 실측 데이터로부터 추정한 활하중효과에 대하여, 현행 고속철도 설계활하중인 표준열차하중의 0.75배를 적용한 설계활하중 효과의 크기가 최소 30~22% 더 크게 나왔다. 신뢰도분석을 통하여, 극한한계상태만을 기준으로 본다면, 추가적인 하중계수 감소의 가능성이 있음을 알 수 있다.
        4,000원
        4.
        2012.11 구독 인증기관 무료, 개인회원 유료
        오늘날 기술의 발전으로 시스템들은 점차 대형화 복잡화 되어가고 있다. 이처럼 점 차 대형화 복잡화 되어가고 있는 시스템들은 더욱 커진 사고 및 고장에 대한 위험을 내재하게 된다. 또한 대형 복합 시스템에서 발생하는 사고 및 고장은 바로 큰 재산피 해나 인명피해와 직결 될 수 있다. 따라서 체계적인 안전관리의 필요성이 점차 커지고 있다. 이에 대응하여 철도, 항공, 해양 등의 산업에서는 각 산업에 적합한 안전관리체 계를 수립하려 노력하고 있으며, 표준 및 매뉴얼을 제정하여 보급에 앞장서고 있다. 예로써 가장 활발히 안전관리체계의 도입을 추구하고 있는 항공 분야에서는 국제민강 항공기구와 미 연방항공청의 주도로 안전관리체계에 대한 가이드와 매뉴얼을 만들어 각국의 사정에 맞는 안전관리체계를 도입할 수 있는 바탕을 제공 하고 있다. 이처럼 점차 중요해지고 있는 안전관리체계내에서도 위험원 식별 및 분석활동은 그 중요성이 크다. 이를 통해 도출되는 위험원 및 위험원의 영향 및 원인이 시스템 개발 및 운용에 서 수행하게 될 안전관리활동의 바탕이 되기 때문이다. 따라서 위험원 식별 및 분석 활동에 적용하기 위한 여러 기법에 대한 연구가 활발히 이뤄지고 있다. 본 논문에서는 여러 가지 위험원 식별 기법 중 HAZOP을 이용하여 고속철도시스템의 위험원 식별 및 분석을 수행 했다. 또한 HAZOP의 수행 및 위험원 식별 활동의 프로세스 모델을 제시함으로써 실질적인 위험원 식별 활동의 수행에 도움이 될 것으로 기대한다.
        4,000원
        5.
        2005.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구에서는 고속철도 강합성형 교통비 동적해석에 기반한 피로신뢰성평가 기법을 제시하고 동조질량감쇠기의 효과를 피로수명연장 측면에서 검토하였다. 피로 신뢰성 평가를 수행하기 위하여 S-N 곡선 및 선형누적손상이론을 이용하여 한계상태식을 설정하였다. 열차 속도와 교량 감쇠비의 불확실성을 고려하여 교량에 대한 반복적인 동적해석을 수행하고, 이 결과로부터 전체 교량수명동안에 교량이 받는 피로 손상도와 연관된 확률변수의 특성을 통계적으로 추정하였다. 최종적으로 결정된 확률변수와 한계상태식에 개선된 일계이차모멘트법(AFOSM)을 적용하여 피로 신뢰도 지수를 산정하였다. 40m 지간 강합성교량의 수치모사로부터 동조질량감쇠기 장착여부에 따라 피로 신뢰도 지수를 평가하고 그 결과를 제시하였다.
        4,000원
        6.
        2003.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        철도교량은 차량과 교량의 상호작용에 의해 유발되는 동하중을 받고 있다. 이러한 동적인 효과는 교량 각 부재에 충격과 피로를 유발하고, 교량의 잔존수명에 영향을 미치게 된다 따라서 수치적 또는 시험적 방법에 의한 교량의 실제적인 동적 거동을 분석하는 것이 매우 중요하다. 본 논문에서는 KTX 차량의 주행에 따른 교량의 동적 특성을 구조적 안전성, 주행 안전성 및 승차감 측면에서 평가할 수 있는 차량/궤도/교량 상호작용 해석프로그램을 개발하였다. 차량/궤도/교량의 실질적인 모델링을 위하여 차륜/레일 접촉 모델링을 위한 헤르찌안 스프링 및 도상에 대한 윈클러 요소를 적용하였다. 또한 개발 프로그램은 준3차원해석으로 차량의 복선제도 주행에 따른 3차원 편심 효과를 고려하기 위해 비톤 자유도 및 기하학적인 관계에 따른 제약조건식을 사용하였다. 개발프로그램의 검증을 위해서 고속철도교량중 가장 일반적인 형식인 PSC 박스교(2@40m=80m)에 대해 수치해석결과 및 계측시험 결과를 비교하였다.
        4,200원
        7.
        2002.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구에서는 고속철도 열차와 교량구조물의 상호작용에 의한 동적응답을 보다 정밀하게 분석하기 위해 3차원의 주행차량모형을 적용한 20량편성정밀 열차모형과 경부고속철도의 주교량 형식인 2경간 연속 PSC 박스거더교(2@40m)를 대강으로 3차원의 뼈대요소를 사용한 교량모형을 이용하여 철도교의 동적거동 해석 프로그램을 개발하였으며, 열차의 주행시험 결과와의 비교를 통해 개발된 프로그램의 타당성을 검증하였다. 또한 보다 효율적인 열차모형을 제시하기 위해 다양한 편성모형 및 하중모형의 조합에 따른 분석결과에 의하면 가장 무거운 KTX의 동력차를 대상으로 주행차량모형을 적용하고 나머지 차량들은 주행하중모형을 적용한 혼합모형이 효율적인 것으로 판단되었으며, 경부고속철도와 같이 복선구조의 교량인 경우에는 열차의 교행에 의해 증폭될 수 있는 교량의 동적응답 특성에 대한 체계적인 검토가 필요한 것으로 나타났다
        4,000원
        8.
        2002.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        철도나 고속철도에서 사용되는 장대레일은 연결부 근처에서 상부구조물간의 변위불일치로 인하여 부가적인 응력이 발생되게 되는데, 이 현상은 단순교에서보다 연속교에서 더 현저하게 나타난다. 철도는 가속과 정지 시의 안전뿐만 아니라 지진상태에서도 탈선이 일어나지 않고 안전하게 정지할 수 있도록 철도구조물의 응력과 변위에서 안전을 보장할 수 있어야 한다. 철도의 안전도를 확보하기 위해 시-제동하중, 온도하중에 의한 레일의 응력에 대한 해석방법은 많은 연구가 이루어져 왔으나, 그 방법이 정적 비선형해석을 바탕으로 하고있어 동적 비선형해석을 필요로 하는 지진하중은 고려되지 못하였다. 그러나, 철도교량의 장대레일과 같이 비선형 거동을 보이는 시스템에서는 교량상판의 상대변위와 레일의 응력과는 선형적인 관계가 정립되지 못하므로, 지진시 열차의 안전한 정지를 확인 하기 위해서는 지진에 대한 영향이 제대로 반영되도록 정적하중인 제동하중과 동적하중인 지진하중을 동시에 재하하여 레일의 응력을 계산하는 동적해석 방법이 요구된다. 본 연구에서는 장대레일을 사용할 때 문제가 되는 레일의 응력을 해석하기 위해 대만고속철도 설계시방서 기준을 만족하는 재료비선형이 고려된 동적해석방법을 개발하였으며 그 방법을 현재 대만에서 연약부지 위에 건설중인 고속철도 연속교에 대한 해석에 적용하였다.
        4,000원
        10.
        1999.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구에서는 고속철도에서 차량교량 구조물의 상호작용을 가능한 정밀하게 취급할 수 있는 3차원 해석모형을 개발하였다. 경부고속철도 교량형식인 PSC 박스거더 교량을 40m 단순 와 25-40-25m 3경간 연속 에 대해 뼈대요소를 사용하여 3차원으로 모형 하였으며, 궤도의 불규칙성은 정상확률과정으로 가정하고, 지수 스펙트럼 밀도함수를 사용하여 궤도의 형상을 생성시켰다. 열차는 경부고속철도 차량 하중효과가 가장 큰 동력차 만을 대상으로 17 자유도 모형과 38 자유도 모형으로 분리하여 개발하였다. 다양한 조건에 대한 분석결과를 검토하면 여러 가지 상황에서 38 자유도 모형의 필수 성이 보여지고 있다. 특히 교량의 솟음 및 장기 처짐에 의한 궤도형상변화가 있는 경우에는 반드시 38 자유도 모형이 적용되어야 하는 것으로 분석되었다. 또한 제동하중이 작용할 때 쏠림 효과에 의한 영향이 큰 것으로 평가되어, 제동에 의한 교량의 동적 거동은 종변 위에 대한 자유 도를 고려할 수 있는 주행차량모형으로 해석되어야 함이 규명되었다.
        4,000원
        11.
        2018.04 서비스 종료(열람 제한)
        Recently, many concrete slab tracks have been adopted in high-speed railway. However, it is vulnerable to roadbed settlement compared to gravel tracks. Therefore, it was necessary to evaluate the long-term performance about roadbed and track of the concrete slab track. In this paper, the performance of track and roadbed is evaluated using long-term high-speed rail data. The measurement items are the Wheel load, Lateral load, Acceleration, Road pressure. The measurement period is from the beginning of construction to three years after opening. For the measurement method, a representative value of the measurement data was selected and compared with the reference value.
        12.
        2018.04 서비스 종료(열람 제한)
        Integrated monitoring system was implemented based on GIS at Honam testbed section. In this system have a variety of information that consisted with ground monitoring & settlement data, vehicle running data and track maintenance on track irregularity and so on. The GIS integrated monitoring and DB system was introduced.
        13.
        2018.04 서비스 종료(열람 제한)
        For quantitative assessment of flexural strength by crack condition of PSC sleeper, which is one of the main components of the ballasted track, 9 PSC sleepers used in Gyeongbu high speed railway line were sampled and static bending strength tests were conducted by EN 13230-2. The flexural strength of PSC sleepers with some mesh or longitudinal cracks was lower than that of new sleepers. In particular, the flexural strength of PSC sleepers with mesh-type cracks was less than 40% of the new sleepers’ flexural strength. The flexural strength of uncracked sleepers was similar to that of new sleepers
        14.
        2016.04 서비스 종료(열람 제한)
        High speed railway bridges should be strictly maintained due to its social importance. However, There are many problems to execute loading test for precision safety diagnosis. A numerical experiment with a numerical model which is updated for reflecting characteristics of an existing bridge can be useful for high speed railway bridge maintenance. Moreover, more efficient maintenance can be possible if only ambient vibration is needed for numerical model updating process. In this study, a numerical model updating process is introduced in which only ambient vibration is enough to execute the process. Also, the usability of updated numerical model is verified by comparing measured and analyzed acceleration.
        15.
        2016.03 KCI 등재 서비스 종료(열람 제한)
        구조 형식이나 공법의 선정, 유지보수 시기, 보수방법의 결정 등의 의사 결정에서 수명주기비용(life cycle cost, LCC)의 평가가 중요 하다. 철도 궤도구조의 경우 초기시공비 뿐 아니라 유지보수비가 총 비용의 상당 부분을 차지하고, 특히 자갈궤도일수록 그 비율은 더욱 높으 므로 수명주기비용 평가의 필요성이 더욱 높다. 이 연구에서는 궤도 구조 형식, 연간 통행량, 축중, 열차 속도, 곡선 비율, 구조물(교량, 터널) 비 율 등 다양한 설계변수를 고려할 수 있는 LCC 산정 모델을 개발하고, 각 비용의 산정에 필요한 기초 자료를 제시하였으며 구축된 모델과 자료 를 바탕으로 주요 설계변수에 따른 고속철도 자갈궤도와 콘크리트궤도 LCC의 변화 경향을 분석하고, 이로부터 궤도 LCC 분석에 있어서의 고 려해야 할 주요 변수를 검토하였다. 검토 결과 자갈궤도는 교체 및 운영 비용의 비중이 콘크리트궤도에 비해 현저히 높았으며, 연간 통행량과 자갈 탬핑 주기가 자갈궤도의 LCC에 가장 큰 영향을 미치는 것으로 나타났다. 반면 콘크리트궤도는 초기 시공비의 비중이 현저히 높았고, 연 간 통행량이나 열차속도, 축중 등에 상대적으로 영향을 적게 받는 것으로 나타났다.
        16.
        2015.10 서비스 종료(열람 제한)
        고속철 PSC 교량받침의 장기 마찰시험은 EN1337-2와 CUAP03.01/78기준을 기반으로 동일한 수직압력에 대한 온도변수별 누적 마찰거리 25,000 m 장기마찰시험을 수행하였다. 기존의 PTFE판은 우수한 마찰계수 결과에도 불구하고 10,000 m에서 손상되어 한계 내구성능을 나타 내었고, 반면에 DP-Mate판은 일부 온도구간에서 한계 마찰계수를 상회하였으나 성공적으로 장 기마찰시험을 만족시켰다. 개발된 마찰시험장치를 이용하여 온도변화(-35℃~70℃)내 저속(0.4 mm/s)시험 12 Cycle과 상온 고속(15 mm/s)시험 11 Cycle 을 32 일간 수행하였다.
        17.
        2015.09 KCI 등재 서비스 종료(열람 제한)
        2015년도 개통을 위하여 호남고속철도 건설사업 건설이 진행되고 있으며, 이 노선은 차세대 고속열차의 HEMU-430X가 세계 최초로 주행하게 된다. 한편, 인근에 위치한 석회석 광산이 지속적인 발파작업을 시행하고 있으며, 더욱이 향후 연결통로 개설을 통하여 이 노선의 하부를 관통할 예정이다. 이 경우에 광산 발파로 인한 고속철도의 안정성과 열차주행으로 인한 광산 안정성 모두 검토되어야 한다. 이를 위하여 광산 발파진동계측을 통하여 진동추정식을 작성하였으며, 광산발파로 인한 철도 안정성을 정량적으로 검토하였다. 특히, 계측결과 분석에 의한 계측관리기준으로 0.5 kine(cm/sec)을 설정하여, 광산 발파진동을 제어하고자 하였으며, 발파진동의 제어를 통하여 고속열차의 안정성을 확보할 수 있는 광산의 발파패턴을 제안하였다. 또한, 고속열차 주행에 따른 진동이 광산에 미치는 영향을 수치해석적으로 검토하여 광산의 안정성도 확보할 수 있도록 하였다.
        18.
        2014.10 서비스 종료(열람 제한)
        고속철 PSC 교량 마찰받침의 내구성 평가를 위하여 해당국내 기준의 미비로 DIN EN 1337-2 과 CUAP 기준을 적용하여 마찰판의 5000 m 이동거리에 대한 마찰 시험을 수행하였다. 적용온도와 이동속도에 따라 마찰계수를 계측하고 기준에서 요구된 상한 한계와 비교하여 고속 주행으로 발생하는 증가된 이동거리에 대한 적합한 내구성 평가기준과 실험방법을 개발하고자한다.
        19.
        2014.04 서비스 종료(열람 제한)
        In this paper, the filed test procedure for evaluating the performance of track structure for additional Speed-Up test on Test-Bed Section(KP 100∼128km Osong starting point). The behavior of track system corresponding the speed up of train will be identified by the analysis of the measured data.
        20.
        2014.04 서비스 종료(열람 제한)
        Needs for a new technologies of infrastructure systems arose, following the development of next generation EMU(Electric Multiple Unit) train with maximum speed over 400km/h. For high-speed operation tests of the new EMU, a high-speed railway infrastructure test-bed was constructed in a 28km long section of the Honam High-speed Railway. Diverse sensors and monitoring system was installed for continuous monitoring of the railway. Due to such effort, further demands and needs of the integrated monitoring system was derived in a more comprehensive and long-term perspective.
        1 2