검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 10

        1.
        2023.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In this study, we analyzed how the revenue water ratio(RWR) is affected by changes in conditions of the water supply area, such as the ratio of aging pipes, maintenance conditions, and revenue water. As a result of analyzing the impact of pipe aging and maintenance conditions on the RWR, it was confirmed that the RWR could be decreased if the pipe replacement project to improve the aging pipe ratio was not carried out and proper maintenance costs were not secured. It was also confirmed that an increase in the revenue water could be operated to facilitate the achievement of the project’s target RWR. In contrast, a decrease in the revenue water due to a population reduction could affect the failure of the target RWR. In addition to analyzing the causes of variation in the RWR, the calculation of estimated project costs was considered by using leakage reduction instead of RWR from recent RWR improvement project cost data. From this analysis, it was reviewed whether the project costs planned to achieve the target RWR of the RWR improvement project in A city were appropriate. In conclusion, the RWR could be affected by variations in the ratio of aging pipes, maintenance conditions, and revenue water, and it was reasonable to consider not only the construction input but also the input related to RWR improvement, such as leakage reduction, when calculating the project cost.
        4,800원
        3.
        2015.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This research carried out an analysis on input cost and leakage reduction effect by leakage reduction method, focusing on the project for establishing an optimal water pipe network management system in the Taebaek region, which has been executed annually since 2009. Based on the result, optimal cost-benefit analysis models for water distribution network rehabilitation project were developed using DEA(data envelopment analysis) and multiple regression analysis, which have been widely utilized for efficiency analysis in public and other projects. DEA and multiple regression analysis were carried out by applying 4 analytical methods involving different ratios and costs. The result showed that the models involving the analytical methods 2 and 4 were of low significance (which therefore were excluded), and only the models involving the analytical methods 1 and 3 were suitable. From the result it was judged that the leakage management method to be executed with the highest priority for the improvement of revenue water ratio was installation of pressure reduction valve, followed by replacement of water distribution pipe, replacement of water supply pipe, and then leakage detection and repair; and that the execution of leakage management methods in this order would be most economical. In addition, replacement of water meter was also shown to be necessary in case there were a large number of defective water meters.
        4,300원
        4.
        2011.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Previous researches have focused on the efficiency of project execution and the satisfaction of internal customers in view of the fact that a project is successful if any defects are not found in the short-term performance test of the project final outcom
        4,000원
        5.
        2009.09 구독 인증기관 무료, 개인회원 유료
        A prediction of construction cost in preparation for construction document is calculated in compliance with the unit cost in Public construction of korea. This eventually means that the reasonable construction cost of a building can't be determined before construction document phase cost of construction is settled and that the cost of construction is calculated inefficiently because of connection failing between cost management of detailed estimation and information. To improve those problems, therefore, Cost estimating model of structural building elements with approximate quantity survey method is suggested in this research. The model predict the amount of materials and the cost of construction on the basis of historical similar cases. In the direction of data analysis of this research, ratio statistics value is put to practical use to fit into the peculiarities of approximate estimate of each work trade on the basis of actual data amount of materials of historical cases. In addition, the construction phase is connected through the result of a approximate estimate sorted by elements, details work trade.
        4,000원
        6.
        2009.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This paper considers a six sigma project for reducing the cost copper of the cable materials in a electric wire company. The project follows a disciplined process of five macro phases: define, measure, analyze, improve, and control (DMAIC). A process map is used to identify process input variables. Three key process input variables are selected by using an input variables are selected by using an input variable evaluation table: large cable, plating, and a twisted pair. DOE is utilized for finding the optimal process conditions of the three key process input variables. The implementing result of this six sigma project is enable for reducing of the 2.8% copper materials.
        4,000원
        7.
        2009.03 구독 인증기관 무료, 개인회원 유료
        When managers predict exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But present of public construction cost estimation and management almost after the construction documents design phase. Therefore, construction cost management in the early stage and schematic design phase to generally use approximate estimating is not correct. Accordingly, this study analyze problem of current cost estimating method and a concrete cost plans make using case information of actual cost to analyze in schematic design phase. Possible to check going on the suitable design, this study conducts the preliminary research for the development of cost estimating model.
        3,000원
        8.
        2007.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
          Motorola developed the framework of six sigma in 1987. In these days, many companies adapt this powerful tool. In 1996, six sigma was introduced to the Korean companies as a management innovation tool. This study shows case study of ‘Champion Project’ w
        4,300원
        9.
        2018.09 KCI 등재 서비스 종료(열람 제한)
        The purpose of this study is to measure the cost-benefit of a road construction project in Vietnam through international development cooperation, which includes private grants and Official Development Assistance(ODA). In developing countries, it is difficult and costly to use data on markets, the CVM(Contingent Valuation Method) to measure the WTP(Willingness-to-Pay) as the benefits of road construction are used. A total of 232 villagers in 16 villages of Lao Cai Province in Northern Vietnam have been surveyed. It is found that the Benefit-Cost Ratio(B/C) in all 3 models are found to be well over 1.0, ranging from 2.8 to 3.64 with the discount rate of 0.06. These BC ratios imply the road construction project in Lao Cai can be justified. Also, it is found that the shortened travel time is the most relevant factor for WTP among direct benefits and the enhanced academic achievement of the children is the most relevant factor among indirect benefits, due to easier and faster access to schools, which in turn increase the school attendance rate. The result of this study can be used to justify other similar projects in Vietnam, even though the benefits may have to be reassessed in other countries.
        10.
        2013.09 KCI 등재 서비스 종료(열람 제한)
        The existing standard cost of project management of empowerment sector in general rural development project has problems with standard cost system without considering characteristics of empowerment project and unclear division of works. These problems are a lot of trouble to fulfill the project. Thus, it needs an arrangement of standard cost considering detailed characteristics of project management in the empowerment sector. The contents and results of this study can be summarized as follows. 1) To set accurate standard cost, we carried out three-step processes, such as elicitation of standard works, calculation of workload and determination of standard cost. (1) In an investigation of 30 rural area dividing 8 parts about an workload of empowerment project, an average workload is 1,499 hours. (2) Based on this results, the standard cost is calculated at 15% of project cost in over 600 million won, at 28.75% of project cost in under 500 million won, by standards of empowerment project cost. 2) It set the responsibility management cost to 15% of empowerment project cost considering existing awareness, workload and work professionalism of project management. Based on the results, It suggested the practical use as basis for efficient management of the future empowerment projects. To achieve this, It needs to promote maximizing results on the whole project through the legalization processes including amendment of existing regulations.