        2020.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : The purpose of this study is to measure and analyze the fugitive dust generated by each process through field tests to develop a technology to reduce fugitive dust generated during excavation-restoration work on road pavements. METHODS : The testbed was constructed based on a typical excavation-restoration construction section and comprised five sections for reproducibility and repeated measurements. The excavation-restoration work was divided into pavement cutting, pavement crushing, pavement removal, excavation, and restoration processes and fugitive dust generated by each process was measured. Fugitive dust (TSP, PM10, PM2.5, and PM1) was measured using a GRIMM particle spectrometer, which applies the principle of a light scattering spectrometer and can be measured in real-time. RESULTS : Analyses of the average mass concentration of PM10 generated by the excavation-restoration process are as follows: 1286.3 μg/m³ from pavement cutting, 246.8 μg/m³ from pavement crushing, 697.0 μg/m³ from pavement removal, 747.9 μg/m³ from excavation process, and 350.6 μg/m³ from the restoration process. In addition, the average particle size distribution of the excavationrestoration construction was in the order of PM10~PM2.5 (67 %), PM1 or less (24 %), and PM2.5~PM1 (9 %). The pavement cutting process is characterized by the emission of high concentrations of fugitive dust over a short time, compared to other processes. The pavement crushing process has the characteristic of steadily generating fugitive dust for a long period, although the emission concentration is small. CONCLUSIONS : In this study, it was found that the concentration and characteristics of fugitive dust generated during road pavement excavation-restoration works vary by process and the reduction technology for each process should be developed accordingly.
        4,000원
        3.
        2015.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The weapon systems development has some distinct characteristics in that a big size of government budget (derived from national tax) has been expended frequently and the completion of the development projects seems to take long. Thus, the impact of the potential changes in the required operational capability on the development activities can induce some type of project risks. As such, proper management of project risk has been one of crucial subjects in the weapon systems development. Although a variety of methods can be considered, an approach based on the test and evaluation (T&E) process has been selected in this paper in order to appropriately handle those potential risks. In the study of the underlying T&E process, the safety consideration (for instance, explosiveness) of weapon systems is also included. To achieve the objective of the paper, a step-by-step procedure is first presented in the analysis of the T&E process. Then, to pursue some enhancement on the process, a set of necessary and useful activities are added in terms of risk and safety management. The resultant process is further analyzed and tailored based on a design structure matrix method. The case study of a tank development is also discusse
        4,000원
        4.
        2014.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        As weapon systems become complex in terms of the scale and functionality, the required time to complete the test and evaluation (T&E) process is inevitably getting longer. However, nowadays the reduction of T&E period becomes one of the core targets in the weapon systems acquisition programs. This is because the reduced time for T&E process can yield the reduction of defense budget and also faster deployment of the weapon systems, thereby having a competitive edge over rival countries. On the other hand, in weapon systems development the management of reliability, availability, maintainability and safety (RAMS), and risk is considered important to keep competitiveness and thus has been carried out separately. Thus, the objective of this paper is to study on improving the T&E process by integrating the RAMS and risk management process in it. To do so, the related processes are analyzed and modeled first. Then an integrated process model is developed. The resulting model is equipped with the traceability among the data and interfaces that are generated from the T&E and RAMS/risk processes. As a case study, the model developed is applied in tanks development. The effective use of the traceability is expected to reduce the time and cost required to complete T&E process.
        4,300원
        5.
        2014.04 구독 인증기관 무료, 개인회원 유료
        최근 현대 무기체계는 국방예산 절감과 보다 빠르게 전략화하기 위해 시험평가에 소요 되는 기간을 줄이고자 하고 있다. 이에 따라 기존의 무기체계 시험평가 프로세스 에서 다루는 시스템 설계에 대한 단계별 안전 활동 강화의 필요성 역시 강조되고 있 다. 본 논문에서는 무기체계 획득 프로세스에서 위험 완화의 구성 요소로 확인 (Verification), 검증(Validation) 및 인정(Accreditation) 활동을 고려한 시험평가 프로세 스의 개선사항 도출과 모델링을 통해 무기체계 시스템인 함정 무기체계를 대상으로 적용 및 조정 구축에 대한 내용을 기술하고 있다. 본 연구의 결과를 토대로 시험평가 의 위험요소, 위험평가 데이터의 관리 및 추적 기능을 개선함으로써 향후 M&S기반 획득 시험평가 시 체계 개발 및 운용에서 발생할 수 있는 비용 및 시간을 절감 시킬 수 있을 것으로 기대된다.
        4,300원
        6.
        2013.11 구독 인증기관 무료, 개인회원 유료
        최근 현대 무기체계는 최첨단 기술로 인한 무기체계 개발 속도 증가와 획득환경의 다변화와 더불어 이에 대한 위험도 동시에 증가하고 있다. 이에 따라 미국방부는 무기체계의 수명주기를 고려하여 시험평가를 지속 적용토록 강조하고 있다. 따라서 기존의 무기체계 시험평가 프로세스에서 다루는 시스템 설계에 대한 위험 관리 활동의 강화의 필요성 역시 강조되고 있다. 그 중에서도 무기체계 개발의 탐색개발 및 체계개발 단계는 양산에 들어가기 전의 최종 활동으로서 제대로 수행되어야만 초기에 의도한 무기체계 개발의 목적을 달성할 수 있을 것이다. 본 논문에서는 위험 관리 활동을 고려한 시험평가 프로세스의 개선사항 도출과 모델링을 통해 무기체계 시스템인 무기체계를 대상으로 적용 및 조정 구축에 대한 내용을 기술하고 있다. 본 연구의 결과를 토대로 향후 시험평가 시 위험관리에 대한 투자를 통해 전체 프로젝트의 기간 단축 및 비용 절감과 안전성 확보를 개선시킬 수 있을 것으로 기대된다.
        4,200원
        7.
        2013.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        With the recent changes in the environment of weapon systems acquisition, the systems development is becoming more susceptible to a variety of risks. To cope with this situation, US DoD has been emphasizing the importance of constantly applying the test and evaluation (T&E) process throughout the whole life cycle of the weapon systems. In particular, the safety requirements are called for attention while dealing with system risks. To this end, the present paper is aimed at studying the T&E process which incorporates the systems safety in weapon systems development. Analyzing and modeling the relevant processes has made it possible to achieve the objective. As a case study, the model results were applied to the development of unmanned aerial vehicles.
        4,000원
        8.
        2013.04 구독 인증기관 무료, 개인회원 유료
        최근 현대 무기체계는 최첨단 기술로 인한 무기체계 개발 속도 증가와 획득환경의 다변화와 더불어 이에 대한 위험도 동시에 증가하고 있다. 이에 따라 미국방부는 무기체계의 수명주기를 고려하여 시험평가를 지속 적용토록 강조하고 있다. 따라서 기존의 무기체계 시험평가 프로세스에서 다루는 시스템 설계에 대한 단계별 안전 활동의 강화의 필요성 역시 강조되고 있다. 그 중에서도 무기체계 개발의 핵심 활동에 해당하는 체계개발 단계는 양산에 들어가기 전의 최종 활동으로서 제대로 수행되어야만 초기에 의도한 무기체계 개발의 목적을 달성할 수 있을 것이다. 본 논문에서는 시스템 안전성 요소를 고려한 시험평가 프로세스의 개선사항 도출과 모델링을 통해 무기체계 시스템인 무기체계를 대상으로 적용 및 조정 구축에 대한 내용을 기술하고 있다. 본 연구의 결과를 토대로 향후 시험평가 기간의 단축 및 비용 절감과 데이터의 관리 및 추적 기능을 개선함으로써 무기체계 개발 후의 안전사고 발생 가능성을 줄일 수 있을 것으로 기대된다.
        4,600원