검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 9,900

        3081.
        2018.05 구독 인증기관·개인회원 무료
        Roads in Korea are equipped with PMS (Pavement Management System) computation data that runs on highway, national highway and municipal road. PMS is a program that selects and manages the road pavement optimal maintenance alternative as a indicator of the road pavement structural and functional performance. PMS is a system that has been developed for the primary purpose of maintaining the structural performance of road pavement, and so far does not include any indicators associated with the safety of road users. However, the road cave-in, which have recently become an issue on social networking sites, mass-media, and other issues, should pose systematically because it can make a safety risk to road users, and in particular lead to the structural and functional failure of the PMS program in view of the road pavement. Accordingly, this research has developed a practical use case for developing an integrated road cave-in management program based on the results of various studies on the exploration, analysis, assessment and handling of the existing road cave-in in Korea.
        3082.
        2018.05 구독 인증기관·개인회원 무료
        The infrastructure that man absolutely needs creates a lot of environmental load. The environmental load is quantified global environment pollution. So we can use LCA method for assess and control environmental load. In this study, we developed the environmental load estimating model to evaluate quickly in design stage when maintaining infrastructures facilities. Especially, we chose NATM tunnel because it is economical and there are many example of construction on public roads and expressway. First, we made a list of the breakdown cost by using collected unit cost of Korea Expressway Corporation and Seoul-Si about tunnel maintenance. So we chose major work classification. We selected the major classification such as pavement repairing inside tunnel, leaked surface treatment of tunnel, attached tile repairing inside tunnel and tunnel cleaning etc. We excluded concrete repairing because it is not easy to define maintenance factor about concrete repairing. Next, we made data bases of standard supply and resources need by specialist work classification. Using data bases, we was able to estimate environmental load by designating an input variable such as lane, pavement, length, tile repairing, leaked surface treatment and cleaning method. Lastly, we made environmental load estimating model after it is verified by comparing the results with the actual environmental load and estimated environmental load. Finally, our goal of this study is to develop the methodology that easily estimates the environmental load. Accordingly, the environmental load will be decreased by using this model in stage of planning, design and maintenance. Also, it is expected that the maintenance management estimating model developed from this study will be possible to do eco-friendly management of the road and tunnel construction.
        3083.
        2018.05 구독 인증기관·개인회원 무료
        The composition of the deicer sprayed on the highway is spreading over the highway by the scattering or snow removal activity, or car movement and consequently affecting the vegetation environment around the highway. These are the cause of the damage of fruit trees and crops, and also the cause of corrosion of highway structures. The goal of this study is to estimate the detected range of deicer components from a highway. The concentration of the deicer components in gauze and soil were investigated according to the crossing distance from the highway. The data collected were then used to estimate the concentration range of deicer components in a rage of distance up to 100 m from the highway where the deicer was spread. The sample time and weight of gauze were measured before and after installation, and the soil was collected at more than three points in parallel with the highway at the gauze installation point. The components in gauze and soil were investigated in addition to the deicer components (Ca2+, Na+, Cl-) as well as Mg2+ and K+. As Ca2+ and Cl- components of deicer were affected by agricultural use, Na+ component was selected as a tracer and further SAR (Sodium Adsorption Ratio) of soil was analyzed to examine the degree of influence on vegetation indirectly. The gauze concentration was evaluated by the concentration of the deicer ingredient at the background concentration of the blank gauze. The total amount of the deicer sprayed in the study road for 4 months (winter season) was about 93 ton/km. In the gauze test, the spread of the deicer was detected at a distance of 100 m in study area, but the concentration of the deicer in the gauze by distance decreased rapidly within 10 m from the highway. And concentration of the deicer components in gauze and soil came down after rainy season (August ~ Sep.). The results showed that the components of the deicer could be spread widely by the wind. The effective range of the deicer on vegetation based on SAR in soil was estimated to be less than 20 m from the highway. This study examines the concentration changes of the deicer components in gauze and soils and shows that deicer components sprayed on the highway are accumulated and moved over time by wind, snow removal, terrain, water system and land use around the highway.
        3084.
        2018.05 구독 인증기관·개인회원 무료
        In Korea, the structure is mostly located on the upper part of the high embankment considering the geographical conditions at the time of expressway construction. Embankment was managed stepwise compaction according to height, but creep settlement of embankment itself may negatively affect superstructure. Reinforced earth retaining walls, which were recognized as flexible structures, were no exception to such geographical conditions. Especially, in the case of reinforced earth retaining wall located on abutment wing wall, damage due to differential settlement supported by pile, damage due to differential settlement and uneven settlement of reinforced earth retaining wall itself was frequently occurred. Therefore, in this study, the damage of reinforced earth retaining wall structure located on the high toe part was analyzed based on case. These data will be used as basic data for future maintenance.
        3085.
        2018.05 구독 인증기관·개인회원 무료
        As mentioned at the Davos World Economic Forum in 2016, there is now a worldwide wave of waves of the Fourth Industrial Revolution. The flow of government policy and R & D research is also focused on fostering industries based on the Fourth Industrial Revolution. Research in the field of geotechnical engineering can also be a research that lags behind trends if it is not merged with the technology related to the fourth industrial revolution in the future. Therefore, this study analyzed the applicability of the fourth industrial revolution technology in the field of expressway maintenance.
        3086.
        2018.05 구독 인증기관·개인회원 무료
        Recently, road cave-in and depression in urban area due to subsurface cavity are emerging as a social issue in Korea. These phenomena enable to cause not only damage to human lives and properties, but also an anxiety of the citizens. Furthermore, it is a problem that needs more fundamental solution to countermeasure. The objective of this study is to evaluate the stiffness characteristics of asphalt pavement with existence of subsurface cavity using Falling Weight Deflectometer (FWD) deflection and backcalculation analysis using GAPAVE program developed the KICT. The characteristics of FWD deflections are analysed for cavity and intact asphalt pavements. The stiffness reduction in the asphalt pavement due to subsurface cavity was evaluated as a result of this FWD test. The Seoul Metropolitan Government has conducted a Ground Penetrating Radar (GPR) test, coring, and image photographing in four different locations to determine the presence of the cavity and figure out the cavity depth and size underneath asphalt pavements. The cavity depths measured in this section range between 17cm to 51cm, and its lengths are at least 70cm to up to 310cm. It is found from this analysis that the deflections measured from cavity section are generally higher than intact section in same locations. As results of backcalculation analysis, it appears that the backcalculated moduli are generally decreasing with increase of cavity depth. After comparing with AC moduli obtained from intact and cavity section, it is observed that about 80% of moduli was reduced with existence of subsurface.
        3087.
        2018.05 구독 인증기관·개인회원 무료
        Modified asphalt pavements are needed to resolve pavement distress problems like rutting, pot-hole and warm asphalt pavements are needed to solve energy saving, reduction of noxious gasses emission and early traffic opening. To present these two characteristics, we developed polymer-modified warm-mix asphalt binder and mixtures and evaluated their performance by optimizing polymer-modified warm-mix additive. As results, physical properties and rheological characteristics of polymer-modified warm-mix asphalt binder are similar to normal modified binder. And we confirmed that polymer-modified warm-mix asphalt mixtures satisfied quality standard of Ministry of Land, Infrastructure and Transport.
        3088.
        2018.05 구독 인증기관·개인회원 무료
        This study suggested a new real-time traffic signal operation algorithm using combined data of travel time and occupancy rate. This study applied the travel time data to traffic signal control system, and developed the signal operation algorithm based on saturation degree that was calculated using the travel time data. This algorithm calculates a queue length using a delay model, and converts the queue length to the saturation degree. Moreover, it calculates signal timing variables using this combined saturation degree. This study conducted a microscopic simulation for effectiveness evaluation. We checked that the average intersection delay decreased by up to 27 percent. Moreover, we checked that this signal operation algorithm could respond to a traffic condition of oversaturation and loop detector error effectively and usefully. In korea, sectional traffic detection systems are being installed in various ITS projects, such as Advanced Transportation Management System(ATMS) and Urban Transportation Information System(UTIS). This study has important significance in the sense that it is new methodology to accept the sectional detection system in traffic signal control system.
        3089.
        2018.05 구독 인증기관·개인회원 무료
        Recently, as road users have become increasingly important, the importance of functional performance as much as structural one has been important to provide comfortable and safe road services. As a result of the survey on the customer satisfaction of the highway, the road surface condition is selected as the most important area of the road service, and the functional performance such as driving comfort and noise is pointed out as an important problem. Therefore, many studies have been conducted to improve this problem. In most cases, there is a fundamental limitation in providing a comfortable road to the user through the roughness management of the final layer. In this paper, a study was carried out to improve the roughness of the final layer by controlling the roughness of each layer. In construction field of Busan-ChangWon expressway, roughness was measured by three methods according to construction phases of subbase, 1st and 2nd base layer, intermedia layer and surface layer. As a result of the analysis, it was found that the roughness of the lower layer affects the roughness of the upper layer. Especially, the roughness of 1st base layer was relatively clear correlation with the intermedia and the surface layer IRI. In the future, after getting more field data and establishing the management standards, it is possible to provide a comfortable road to users.
        3090.
        2018.05 구독 인증기관·개인회원 무료
        This research evaluates the applicability of ponded ash in the production of backfill material. From various ponded ash/sand ratios, cement, and air foam conditions, test specimens were developed to investigate many engineer properties of backfill material. Then, the falling weight deflectometer and excavation tests were carried out to determine the behavior of the material in the actual testbed. The test results suggested that all mixtures achieved optimal flowability performance with acceptable stiffening time. It is indicated that the compressive strength increased as ponded ash and cement contents increased, but the strength decreased with an increase in air-foam content or number of freeze-thaw cycles. From the testbed results, it was found that utilizing 100% ponded ash in the production of backfill material is very promising for sustainable development purpose.
        3091.
        2018.05 구독 인증기관·개인회원 무료
        Pavement performance usually depends on the pavement’s material property, traffic and environmental conditions. Current pavement design programs such as the Mechanistic Empirical Pavement Design Guide use these factors in assessing the pavement life and performance in terms of different distresses like rutting and fatigue cracking. Theoretically, the cracking and rutting behaviour of pavements are based on accumulated strains experienced by the pavement which is brought by the weight and loading speed of vehicles. A steady state loading device was used in the field to evaluate pavement deflection’s behaviour in varying loading frequencies. It was observed that the pavement deflection increases as the loading frequency also increases until it approaches a certain frequency wherein the deflection decreases thereafter. In this study, a three-dimensional finite element pavement model was established using ABAQUS wherein the effect of the vehicle’s loading frequencies was analysed. The calculated static deflection and stress from the finite element (FE) model were found to have good correlation with the KENPAVE measured deflection and stress. The deflections of different pavement conditions were further studied and analysed by generating several pavement geometries and strength from the FE model using a frequency sweep response analysis. It was found that the geometric condition and the current modulus of the pavement can amplify the pavement deflection by a factor, β, depending on the loading frequency. The peak deflection was found to be occurring when the loading frequency approaches one of the pavement’s natural frequencies. Based on the finding from this study, the natural frequency is an important factor to be considered in designing pavements. Further study is recommended to understand more on how to minimize the effect of natural frequency to pavement life.
        3092.
        2018.05 구독 인증기관·개인회원 무료
        Autonomous Driving (AV) is expected to reduce the traffic accidents. Highways again need to be changed to afford AV, so the benefits we expect from introducing AV can be much larger. Highways which are easy to drive for humans is also easy to AV. Building or changing the highways in the way that they are good at explaining the way how to drive can be the very first step to afford AV. Highways which have the fail-safe features can be the second step to afford AV regardless of the weather is good or bad. Highways which have an ability of good communication with the vehicles, so drivers avoid the hazards, can be the third step to afford AV.
        3093.
        2018.05 구독 인증기관·개인회원 무료
        The Golden Gate Bridge, known as one of the most beautiful bridges in the world, serves 110,000 vehicles per day, connecting San Francisco to inland as a segment of Highway 101 in California. The average peak hour volume over 6,500 vehicles per hour exceeds the traffic capacity of three lanes on each direction. Due to unique function of the bridge as a gateway of San Francisco, the peak directions in the morning and afternoon were explicitly distinguished. Recurrent traffic delay on the peak direction deteriorated level of service during the commute periods and caused user’s inconvenience and traffic accidents. The workers previously used to move plastic delineators to change lane configuration (4-2, 3-3, and 2-4) in several times a day. Neither did it provide prevention nor physical protection from the head-on collision on the bridge section. In January 2015, the Golden Gate Bridge was completely closed for two days to install the moveable median barrier (MMB) system, Road Zipper®, for more effective and safer variable lane management than the previous operation. One-meter section with 30.48 cm wide of highly reinforced concrete barriers are linked to form a continuous barrier wall and the machine lifts and passes the barriers through a conveyor system at a seeds up to 16 km/h. The MMB enables to quickly reverse lane configuration without traffic closure, providing more lanes to the peak direction as well as eliminating head-on collision on the bridge deck by presence of a physical structure. The traffic monitoring study result shows the significant improvement of average speed during peak hours and the regional traffic accident records shows improvement of safety after implementing the MMB on the Golden Gate Bridge. According to the traffic accident records, 13 injuries occurred in five accidents of vehicle collision in two-directions from 2007 to 2014 but no two-way accident has been reported since the operation of the Road Zipper® began. Furthermore, the MMB would be effectively implemented on construction work zones, managed lanes, variable lane management and other traffic operation to improve traffic safety and maximize utilization of roadway facilities.
        3094.
        2018.05 구독 인증기관·개인회원 무료
        In this study, eye movements of drivers on expressway ramps were comprehensively investigated using raw data from driving simulator and eye tracker(MyGaze) deducted though the previous study. Based on the literature review, several parameters including number of fixations, fixation time, horizontal & vertical eye movements, and gaze position were selected. With them, eye movements of older drivers and young drivers were compared and investigated. Average fixation time of older drivers is shorter and tend to focus more on the inside road edge for both left and right turning ramps comparing young drivers. Also, they tend to look wider at right turning ramp. All driver’s fixation points were spread along the inside road edge for both left and right turning ramps. Currently, road delineating facilities are installed on the side where centrifugal force is applied. However, considering the result, it should be installed where centripetal force is applied. In addition, road line marking management should be more taken care of. For future study, vehicle’s speed is also in need of consideration with eye movement.
        3095.
        2018.05 구독 인증기관·개인회원 무료
        Recently in Construction field, It has been the big issues to produce an Eco-friendly Construction material and to solve problems about the First grade–Aggregates’ supply&demand. While the Eco-friendly Construction materials which are refurbished and reproduced from construction wastes and industrial by-products have a great deal of effectiveness such as cost or CO2 emission reduction, there is an additional logistical cost due to go through with some processes for recycle such as Intermediary treatments or management and collection of materials. Furthermore, Demand of the First grade-Aggregates is rising and spreading all over the nation for the improvement of Road driving performance, But there is also an additional logistical cost for supply&demand due to the cost of transport growth by sites of construction. In this study, the process and methodology of the new material supply and demand route routings using the Arc Gis Program and the calculation of the available distance through economic analysis are presented. After examining the cost status of construction materials and logistics costs by examining the literature review and related industry, economic feasibility was obtained by comparing the price of general construction materials with the total cost of comparable materials and logistics costs. After an economic analysis, ArcGis3.0 was used to visualize the materials’ supply&demand route and As a result, We can observe the economically secured route from the construction materials’ production plant to where the domestic transportable route and nodes mapped. Throughout the study, the pre-groundwork for an efficient use of the construction materials is able to be prepared and It will be helpful to invigorate supply&demand. In addition to the economic analysis in the future, If the real-time traffic information (traffic volume, speed, environment, etc.) and the performance (structure, functionality, etc.) of each construction materials are reflected, It will be possible to build a decision system for selecting construction materials which meet consumers’ various needs.
        3096.
        2018.05 구독 인증기관·개인회원 무료
        In this study, several approaches in evaluating moisture sensitivity of asphalt mixtures were investigated and compared. To evaluate the moisture damage resistance, twenty types of asphalt mixtures with and without anti stripping additives were tested in the laboratory. Uniaxial compressive strength (UCS) and indirect tensile (IDT) testing were performed to determine the Tensile Strength Ratio (TSR) and Cohesion Strength Ratio (CSR). Stone Mastic Asphalt (SMA) mixtures were found to provide good moisture damage resistance compared to other mixtures. It also does not require anti stripping additives to improve its moisture resistance. Moreover, the correlation coefficient between the TSR test and CSR tests is 0.99 with an average error of 1.5%, which indicates that the TSR test following AASHTO T-283 is still the most reasonable criteria in evaluating the moisture damage of AC mixtures. Marshall Stability Ratio (MSR) and Marshall Stability to Flow Ratio (MSFR) were conducted and were compared to TSR test results. It was found that MSFR value may be used to evaluate the moisture damage resistance of AC mixtures instead of TSR test. Finally, Dynamic Immersion (DI) test was performed to evaluate moisture resistance for loose asphalt mixtures. The DI results showed good correlation also when evaluating moisture resistance compared to TSR. When using DI testing in evaluating moisture resistance, it is recommended to test after 48 hours since it showed higher correlation with the TSR values. Further study is recommended to improve current testing evaluating moisture susceptibility of asphalt mixtures to properly associate it with TSR values.
        3097.
        2018.05 구독 인증기관·개인회원 무료
        The aged asphalt binder included in RAP due to the oxidative aging, repeated vehicle load, climate process affects to the recycled asphalt mixture property and performance (stripping, port hole and premature cracking initiation) after paving. The rejuvenator commonly is used to recover the aged binder in hot mix asphalt (HMA) containing RAP; the effect of rejuvenator in HMA had been proven according to many studies for over the past several decades. Also, there are many methods for using RAP in asphalt mixture in aspects of HMA, cold asphalt mixture (CMA) and worm mix asphalt mixture (WMA), and a foamed asphalt mixture is one of them. Employing the foamed asphalt manufacturing technology, the content of RAP in recycled asphalt mixture can be increased more. The objectives of this study are to evaluate of rejuvenator influence on foamed asphalt mixture using 100% RAP based on strength change of test sample and stiffness change of recovered binder from RAP and specimen. As the results, when rejuvenator was added to make foamed asphalt mixture, MS and ITS values decreased clearly as compared with the foamed asphalt mixture without rejuvenator use. The use of rejuvenator up to 6% showed a tendency of the decrease of strength and stability remarkably. The use of rejuvenator over 6% did not decrease the strength and stability. DSR test results, the use of rejuvenator in making a foamed asphalt mixture using 100% RAP showed a recovery effect of the foamed asphalt mixture. And recovered binder from the specimen that was made adding the 6, 12 and 18% rejuvenator showed lower stiffness obviously compared to the recovered binder from RAP adding same dosage of rejuvenator.
        3098.
        2018.05 구독 인증기관·개인회원 무료
        When there is a significant stripping in asphalt pavement, it is common practice to use a hydrated lime (HL) as an anti-stripping additive (ASA). However, since many asphalt plants do not have facilities for weighing and casting HL, they prefer to use of a liquid-type ASA (LA). Therefore, various brands of LAs which show proper anti-stripping function are currently developed, imported, and marketed in Korea. In addition to the anti-stripping effect, the HL has been known to give a significant age-retarding effect on paved asphalt in the field. Therefore, there was a question about whether or not the LA provides the same anti-aging effect as The HL. This study investigated anti-aging effect of the asphalt mixes which were prepared using both ASAs and short-term aged and long-term aged in the laboratory. The absolute viscosity was measured as an aging index from the binder recovered from the mixes after short-term aging (STA) and long-term aging (LTA) processes. The results showed that there was a significant higher aging found from the LA-added mix than the normal mix without any ASA. On the other hands, the mix with HL showed significantly lower ageing level than the LA-added mix and normal mix. The retardation of age-hardening by using HL was more effectively observed when the STA condition was stronger.
        3099.
        2018.05 구독 인증기관·개인회원 무료
        This study evaluated the effect of steel slag and steel wool fibers (SWF) on self-healing performance of asphalt mixture. The microstructure and distribution of SWF in mixture were examined by a computerized tomography scan and image analysis program. Thermal conductivity was investigated using the thermal constant analyser. The heating rate and healing performance were measured by induction heating system. The results showed the uneven distribution and the agglomeration in the mixtures when the content of fibers exceed a certain dosage. It was found that the mix with steel slag had higher heating rate than the mix with normal aggregate; however, its healing performance was slightly lower because of the breaking of weak steel slag. Finally, the mechanical test results indicated that SWF can enhance the resistance and prolong the fatigue life of asphalt mixtures.
        3100.
        2018.05 구독 인증기관·개인회원 무료
        If asphalt-aggregate mixture is produced at a high temperature, the mixture will suffer a significant higher shortterm aging (STA) due to the elevated temperature. The binder in that mixture will be oxidized (aged) more than expected during STA due to the highly elevated temperature. The STA at the high-temperature level is one of the reasons why the hot-mix asphalt (HMA) mixture shows many distresses in the early stage of service life. In this respect, adopting warm-mix asphalt (WMA) technology is another advantage in the asphalt pavement industry. In this study, various levels of STA were used to evaluate aging levels of the binder in the mixture before and after STA. A gel-permeation chromatography (GPC) test was performed on the mixture particles without binder recovery to estimate the significance of aging for each case of STA. Statistical analyses were carried out to determine the difference in aging levels among STA temperatures. Statistical test results found that the aging level of the binder after STA was significantly higher than that of binders before STA at an α = 0.05 level. It was also found that the aging level of binders in the WMA mixture was significantly lower than that of binders in HMA after STA at an α = 0.05 level. It was observed that if an HMA mixture was produced at high-temperature STA, its aging level was estimated to be approximately four years in service.