This study identifies the possibility of alignment discrepancies during mortar firing when using inactive fuzes, which make it impossible to visually observe impact points. To address this issue, we studied a quality assurance method for Sight Alignment after firing. To establish a baseline, we analyzed the pre-firing Sight Alignment and the impact group status during firing for 00 mortars and 000 shells. Based on this analysis, we derived the alignment position information range after firing for 36 mortars, distinguishing between 68% and 95% confidence interval. Finally, considering data characteristics, inspection time requirements, and non-conforming data, we selected the Sight Alignment range after firing based on the 95% confidence interval. This study is expected to contribute to the development of quality assurance methods for munitions by serving as an example of quality assurance in the mass production stage of mortars.
A prerequisite for improving the quality of a product is to enhance the quality of its parts supplied from outsourced enterprises. An enterprise certified by ISO 9001 Quality Management System is expected to develop their effective quality assurance system and maintain it through continuous control and improvement, thereby ensuring the good quality of products that they produce. However, it is reported that small and medium–sized enterprises certified by ISO 9001 have difficulty establishing an effective quality assurance system. This study aims to propose a new method of improving a quality assurance system that can be more effective in small and medium–sized enterprises. This study collectively considered requirements specified in several international standards on quality system and the results of expert group brainstorming to identify evaluation areas and items for assessing a quality assurance system. Based on these evaluation areas and items, a set of checklists for diagnosing and improving a quality assurance system was developed. In order to demonstrate the usefulness of the proposed method, this study applied it to ten small and medium-sized enterprises and could identify four approaches for improving their current quality assurance system. The presented improvement method, which consists of establishment of quality goals and quality innovation plan, defective products corrective activities, 4M and design change process, improvement of customer quality information management, is expected to be utilized as a useful tool for the enhancement of the quality assurance system of small and medium-sized enterprises.
In this paper, an evaluation of a product replacement ratio of irreparable items to the normally working ones is performed with a view to a warranty analysis. It is demonstrated that the replacement ratio during the warranty period can be estimated from t
Since commercial operation of Kori-1 nuclear power plant in 1978, twenty units are under operation and six units are under construction at 2011 present. Nuclear power become a main energy source in our country. However, the plant was constructed by a USA
In this study, a reliability analysis method is discussed for the evaluation of the withdrawal ratio of non-repairable items to the normally working items of a controller product model. Although the analysis method is rather straightforward, one can estimate the probability of withdrawal and present the management a useful information on the appropriateness of the warranty period, exploiting the collected data, which is commonplace in the industrial site. For the methodology is to be refined, more systematic collection of data and adoption of more sophisticated analysis method are yet to be desired.
Traditionally Nuclear Research and Development (R&D) result has been big influence on other industries and societies and it requires large scale investments and study period. So it is essential to apply Quality Assurance (QA) for systematic R&D management
A institute developed Quality Assurance(QA) program for nuclear R&D projects to meet the demands of its customers' requirements for recognized quality standards and nuclear industry accepted practices. It was implemented by project quality assurance plan as a new process. This paper is designed to introduce the process of establishment and execution of nuclear quality assurance programs for R&D as a case study. This QA program can be used as a reference to other organization on implementation of QA for R&D projects.
본 연구는 콘크리트 도로 포장의 고품질을 확보하기 위한 방안으로 지불규정을 개발하는 과정의 일환으로 수행되었으며 지불규정 적용을 위한 합리적인 품질측정방법의 개발 방안을 모색하고 품질에 따라 지불계수를 결정하는 기법을 개발하는 것이 목적이다. 우선 콘크리트 포장의 지불규정 인자인 슬래브 두께에 대하여 통계적인 기법을 이용하여 측정 자료를 분석함으로써 측정자에 따른 읽음오차를 감안하여 지불규정의 기준에 대한 허용오차를 결정하는 방법을 제시하였으며 두께 측정 시 측정 간격 및 위치 등의 측정빈도를 결정하는 방법도 제시하였다. 또한 지불계수를 합리적으로 결정하는 방법을 제시하기 위하여 슬래브 두께와 콘크리트 철강도 등의 지불규정 인자에 대하여 미국에서 사용하고 있는 PWL 방법을 이용한 지불계수를 산정하여 정규분포와 t분포를 이용하여 구한 지불계수와 비교분석함으로써 국내에 적용하기 적절한 지불계수를 산정하는 방안을 제시하였다.
Many producers put sampling inspection policy into the way of their convenience. Examples of the convenience are irregular lot size and too small sample size. Because they don"t use a standard sampling inspection policy, they can not guarantee the quali
방사성폐기물 처분 연구 사업이 법률적인 인허가 뿐만이 아니라 일반 국민의 동의를 얻기 위해서는 처분 사업의 안전성에 대한 신뢰성 획득이 중요하며 이를 위해 투명하게 공개될 수 있는 종합 성능 평가 (TSPA, Total System Performance Assessment)의 수행 이 필요하다. 본 연구에서는 처분 성능 평가의 투명성 증진을 위한 방안의 하나로 처분 종합 성능 평가 전 과정에 대해 품질 보증 원칙을 도입하여 평가 관련 전체 업무에 관한 신뢰성 향상을 꾀하고자 하였다. 이를 위해 처분 종합 성능 평가 수행의 다섯 단계인 (1) 기획, (2) 연구 수행 , (3) 문서화, (4) 내부 검토, (5) 독자적인 외부 검토 과정에 T2R3의 품질 보증 원칙을 적용한 인터넷 기반의 Cyber R&D Platform이 개발되었다. 인터넷을 기반으로 하는 본 시스템의 개발을 통해 안전성 평가 관련 모든 참여자들은 평가 전 과정에서 투명성이 유지된 데이터들에 쉽게 접근하여 이를 이용할 수 있다 Cyber R&D Platform은 안전성 평가를 위한 시나리오 개발 관련 데이터인 FEP 목록과 관련 시나리오 정보, 관련 시나리오 도출 과정 및 평가 체계 등을 체계적으로 구축한 FEAS (FEp to Assessment through Scenario development)프로그램과 안전성 평가에 필요한 입력 데이터들을 분류, 저장해 놓은 PAID (Performance Assessment Input Data) 프로그램, 그리고 이러한 자료들을 품질 보증 원칙과 절차에 의한 승인 과정을 통해 입력, 저장할 수 있는 품질 보증 시스템으로 구성되어 있으며 이를 통합 운영함으로써 도출된 데이터들의 신뢰성을 높이고자 하였다. 향후 연구에서는 Cyber R&D Platform과 평가 software와의 통합 운영으로 웹 기반 시스템에 대한 한 번의 접속만으로 안전성 평가 관련 모든 정보를 확인, 이용할 수 있도록 할 것이다.
본 연구는 학교급식에서 Cook/chill system으로 생산 가능한 음식으로 돼지 불고기를 선정하고 모의실험을 통해 급식생산체계를 반복 실시함으로서 식품 위해 분석 중요관리점(HACCP)을 규명하고, 저장기간중의 음식품질 평가를 통해 합리적인 저장기한을 설정하고자 수행되었으며, 그 연구결과는 다음과 같다. 돼지불고기는 냉동상태로 운반되지 않아 온도상승이 일어난 검수 단계를 제외하면 각 생산 단계별 기준이 준수된 양호한 상태 하에서 생산된 것으로 나타난다. 생산단계별 미생물 분석결과, 원재료($4.26{\pm}0.11\;Log\;CFU/g$)에서 중온균수가 조리하지 않은 식품 기준 이내이나 다소 높게 나타났고, 양념장($5.97{\pm}0.04\;Log\;CFU/g$)에서는 조리하지 않은 식품 기준에 근접한 수준이었으며, 양념으로 재우는 과정($5.56{\pm}0.21\;Log\;CFU/g$)도 위험 수준이었다. 가열 조리 후 최종 음식온도가 $8.25{\pm}3.54^{\circ}C$에 도달하였으나 중온균수($5.17{\pm}0.04\;Log\;CFU/g$)가 급식 단계 음식기준을 초과한 위험한 수준이었고, 기타 미생물은 검출되지 않았다. 급속 냉각과 저장 1일, 3일, 5일 동안도 중온균수가 급식단계 음식 기준에 근접한 위험한 상태였고 기타 미생물은 검출되지 않았다. 재가열 처리에 의해 저장 1일($4.62{\pm}0.22\;Log\;CFU/g$), 3일($4.55{\pm}0.20\;Log\;CFU/g$), 5일($4.25{\pm}0.16\;Log\;CFU/g$) 모두 중온균수는 감소하여 급식단계 음식기준에 충족한 상태가 되었다. 배분 3조건에서도 급식단계 음식 기준 이내에 들었다. 저장 5일간 이화학 분석 결과 pH, 산가, 휘발성 염기 질소 모두 저장 5일에 유의적으로 증가하였고, 관능평가에서는 모든 항목들이 유의적인 차이를 보이지 않았다. 티아민 정량 분속 결과 ,가열 전의 티아민 함량을 100%으로 했을 때, 가열 후에는 78.6%로 손실이 일어났으며, 냉각과 저장 1일, 3일은 티아민 손실을 거의 일으키지 않는 것으로 나타났다. 그러나 저장 5일에는 티아민이 현저히 저하되어 62.5% 보유에 그쳤다. 저장기간에 따른 미생물적, 이화학적, 관능적 품질을 분석한 결과와 티아민 함량의 변화를 고려하여 돼지불고기의 저장기한을 3일로 제안하며, 생산 단계별 온도-소요시간 측정 및 미생물 분석을 통해 규명된 중요관리점은 돼지고기와 양념장재료인 파, 마늘, 생강의 구입 및 검수, 가열조리, 냉각, 저장, 재가열과 배식단계였다.