검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 18

        1.
        2017.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Abstract It has come to attention that a risk-assessing organization, that will benchmark a company’s safety department, is imperative, following an increase in large-scale SOC-business project, construction of higher-raised buildings, development of underground space; all that have increase accident rates. Having faced problems that arise in firms that demand diversity, complexity and instantaneity, the purpose of the thesis is to arrive at efficient and practical problem-solving means. In order to solve the problems that would surface theoretically during an actual risk assessment, the state of the operation systems of the top five national construction firms having a hazard rate of 0.25 times less than the average rate have been analyzed, while a hierarchal recognition research of the employees who not only function at the operating level but are the practice subjects of a firm, has also been conducted, bringing the main text.
        4,000원
        2.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recent News patrons of incidents can be called sinkhole that occurred one after another (Sink Hole). Due to this anytime, anywhere I do not know how the land is turned off worry and anxiety is the reason why you can never be dismissed as exaggerated. As we have seen today through the video, the vehicle was traveling on a road or pedestrian who was walking down the street they look out of the basement of a sudden they still come to mind vividly. Here, examples and corresponding measures to prevent the sinkhole off the ground, including the causes and impact on society because of this that occurred, and policy measures and abroad are evaluated with respect to what it is.
        4,000원
        3.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Total accident rate in the construction industry is a very meaningful reduction to establish a comprehensive disaster reduction measures, including through the Survey, the disaster prevention projects whilst driving status and problem analysis in order to reduce the mature workers in the construction industry is growing rapidly in all disaster disasters (share) The days. It is urgent to establish a framework and measures that can identify the specific cause for this than for the middle-aged workers and disaster reduction in disaster reduction efforts, which continue to increase. Used as measures of information and data presented in the basic requirements of mature workers also been.
        4,000원
        4.
        2015.11 구독 인증기관 무료, 개인회원 유료
        Currently, the construction industry in Korea implements the risk assessment that is implemented by managers and working team leaders. However, it is difficult to share the result of risk assessment meeting to substructural workers in korea system and the workers don't understand meaning and effect about risk assessment. The risk assessment is that the workers in the construction site have to know risk factors and reducing ways to the risks. But, the education and sharing methods for risk assessment system is insufficient in korea. For this risk assessment problems identified were surveyed. In order to improve the problems of the risk assessment, proposes the following three methods. First, Implement to educate the risk assessment during the basic safety and health training of construction industry. Second, the training way about workers' participation in risk assessment is necessary. For example, after watching videos, etc, the workers create risk assessment in person and make a presentation about it. Third, the risk assessment utilize during TBM(Tool Box Meeting). Before working every day, we need to educate risk factors and the reducing ways to the risk during TBM.
        4,800원
        5.
        2015.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recently, the Ministry of Labour, published clause 2 of Article 41 (Risk Assessment) of the Act "Industrial Safety and Health" dated 12 June 2013 in connection with continuous increase of accidents at construction sites in order to prevent accidents in industrial safety and health in new construction in accordance with the risk assessment on construction projects are realized after March 13, 2014. In this paper, positive method of calculating risk discussed by performing research the awareness of general contractors and sub-contractors with presenting risky situation is considered. The purpose will be a positive method of calculating risk and would be a sufficient basе and give a positive direction in the development of new systems currently working in the construction and risk assessment which consider the characteristics of sufficient risk assessment system for future research.
        4,000원
        6.
        2015.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The risk assessment carried out on the construction site at the beginning of the implementation depends on the subjective judgment of risk of general contractor and subcontractors, whose opinion about frequency and intensity of risk is different. In this paper, research the awareness of general contractors and subcontractors about process of risk assessment at the construction site and its effectiveness. Researching of the main factors "frequency", "intensity" which determines the degree of risk gives the opportunity to find an option for improving the effective implementation of risk assessment.
        4,000원
        7.
        2015.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Total industrial accident rate in Korea is facing a record 0.7% for 10 years since 2000. After entering the continuous versus 0.6% (0.69%) in 2010. In 2011, the decrease was reduced to 0.65%. Conversely In contrast to foreign workers' share has increased dramatically over 10 years since 2000 to 2010 are expected to be difficult in the accident rate of 0.5% for the entry. Despite the ongoing disaster reduction efforts to reduce disaster (share) of foreign workers has been increasing rapidly Survey, Whilst the provision of disaster prevention system status and problem analysis and identify measures that can be established through such disaster reduction measures are urgently needed.
        4,200원
        8.
        2014.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Share of total accidents in construction accidents construction site accident 70% of small embroidery Reducing the rate of Construction of the entire construction accidents decreased overall is a very meaningful work. Disaster reduction continues to increase despite the efforts of a small construction site(Amount less than 2,000,000,000) for Disaster Reduction In order to identify more clearly the cause of the system and provide the urgently needed measures.
        4,200원
        9.
        2014.11 구독 인증기관 무료, 개인회원 유료
        Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.
        5,700원
        10.
        2014.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.
        4,600원
        11.
        2013.04 구독 인증기관 무료, 개인회원 유료
        According to Department of labor guideline “2012-104 (2012.9.26.)” This study is to suggest the basic information and the improvement for the application of risk assessment on a construction site by group interview & survey of construction worker who is the practice of the subject and then numerical analysis about awareness and action plan of Safety and health. The result of group interview and survey of construction worker, most of construction worker feel the danger during the work. Then construction worker analysis results that risk assessment helps to change & raise awareness of safety and reduce an industrial disaster. Easy Safety management activity such as TBM & safety education active will be necessary for safe worksite and then I suggest the TBT(tool box talk) active which combines TBM & safety education.
        4,300원
        12.
        2013.04 구독 인증기관 무료, 개인회원 유료
        This study compared the disasters in construction field under construction amount of 300,000,000 won and the whole construction fields in order to improve the efficacy of various industrial safety and health policies and services and examined the characteristics of disasters in construction field under 300,000,000 won. It also examined, compared and analyzed the characteristics of disaster in construction field under construction amount of 300,000,000 won that disaster prevention technical experts saw. The subjects of comparison were selected with statistical data of disaster for 2011 and those of disaster in construction field under construction amount of 300,000,000 won from January to August of 2012. And questionnaire was conducted with technical instruction experts of small-sized construction field and priority was drawn, compared and analyzed with AHP. Consequently, the results of different views between actual disaster data and experts' views were obtained. Therefore, this study suggested the characteristics of disaster in construction field under construction amount of 300,000,000 won and presented the methods for improving disaster prevention technical experts.
        4,000원
        13.
        2012.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Risk Assessment to list possible safety disasters and their probability and severity is the starting point for effective safety management on construction project site. However, the safety managers in owners, construction supervisors, contractors, and sub-contractors still have difficulties in judging the priorities of safety activities and preparing responses to each potential safety disasters. Therefore, this study aimed to suggest a systematic method in assessing safety risk prior to commencement with the agreement of stakeholders. FMECA(failure mode effects and criticality analysis) was selected as a main assessment tool and it was modified according to the characteristics of construction projects and trades. Each risk is, firstly, evaluated with occurrence probability, possible loss and impacts to projects, and detections, and then risk priority number(RPN) is calculated. Subsequently, the managers of each stakeholder discuss the types, timing, and responsibilities of responses as a group decision-making process.
        4,000원
        14.
        2012.04 구독 인증기관 무료, 개인회원 유료
        Risk Assessment, a basis of health and safety management system, is an calamity prevention activity which regularly measure the level of a risk to passively improve potential hazard. A problem, the assessment not being improved to be applied to the construction work site where requires diversity and complexity, causes the assessment to be inefficient to bring quality results. A study on the investigates and compares the surveyed degree of recognitions of workers who works in companies executing the risk assessment By the investigation and comparison, it is expected to bring the better solution for early and efficient application for those companies which are not taking the risk assessment.
        4,200원
        17.
        2015.02 서비스 종료(열람 제한)
        풍해의 위험도 분석을 수행하기 위해서는 강풍위험요인, 풍해위험지표, 시설물과 같이 풍해 위험도 분석에 필요한 자료에 대해 데이터베이스를 구축할 필요가 있다. 구축되는 데이터베이스의 품질은 풍해 위험도 분석 결과의 정확성 및 신뢰도와 직결되기 때문에 정확한 데이터를 확보하고 체계적인 과정으로 데이터베이스를 구축하여 데이터베이스의 품질을 높일 필요가 있다. 특히 시설물 데이터베이스는 타 데이터베이스와 다르게 1차적으로 기본자료를 확보한 후 현장조사를 통해 데이터베이스를 통해 구축해야 하므로 조사항목 및 기준설정이 필요하다. 따라서 본 연구에서는 각 시설물별로 풍해 위험도 평가시 활용되는 구성항목을 결정하고 건축물 대장 및 농업시설자료를 통해 전라남도 여수시와 강원도 강릉시를 대상으로 산업용시설물, 아파트, 상업용시설물, 연립주택, 다세대주택, 비닐하우스, 축사에 대한 자료를 확보하고 조사대상 시설물을 결정하였으며, 현장조사를 통해 데이터베이스를 구축하였다.