검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 930

        421.
        2009.11 구독 인증기관 무료, 개인회원 유료
        Small & Medium construction firms have been faced with demand of environmental changes. construction firms have been required to improve their structures to reinforce the competitiveness. so, these firms are making desperate efforts, which are reorganization, renovation, improvement. this study would be emphasized the Quality Management in construction work. For this, It must be supposed a plan to improve a construction organization. The Construction Firm would be executed Quality Management learning, leadership, understanding of Quality Management to construction workers.
        4,900원
        422.
        2009.11 구독 인증기관 무료, 개인회원 유료
        The global economic recession caused a great change of the labor environment such as restructurings and unstable employment. This facts brought about an increase in sense of rivalry, over workload, job uncertainty and lowering of self-confidence. Due to the fact that the work process and employing system in construction field is little differ from normal industries, especially, labors working in construction field are much exposed to the job stress. On this study, we survey construction-field labors and made an analysis of the gathered data through the statistic method to reveal what kind of job-stress factors influence on the defects of construction works. As the result, we investigated the truth of the induction factors which cause the job-stress in costruction field and proposed an alternative plan for an effective job-stress management which make the defect rate low.
        4,200원
        423.
        2009.11 구독 인증기관 무료, 개인회원 유료
        건설업은 공사수행을 포함한 대부분의 기업 활동이 인력에 대한 의존도가 높은 산업으로서 원가구성 측면에서도 외주비와 재료비를 제외하고 가장 큰 원가항목이 인건비다. 따라서, 건설업의 인력관리 강화는 효율적인 인력 운용과 원가관리를 위해서도 가장 중요한 관리항목이다. 본 연구에서는 건설업에서 체계적인 인력 및 시간관리를 통해 인력운용의 효율을 높일 수 있고, 업무시간 실적 정보에 의해 업무에 대한 성과관리의 정확성을 높일 수 있는 제도운영 및 시간관리 시스템 (TMS: Time Management System) 구축 방안을 소개하였다. 이러한 시간관리는 높은 수준의 인력 및 업무 관리를 가능하게 하고 업무에 대한 우선순위 결정과 적정 시간 분석으로 관습적이고 비효율적인 업무요소를 파악하여 효율적인 인적자원 관리를 하고자하는 건설사뿐만 아니라 프로젝트 산업 군에 속하는 여러 기업들에게 도움을 줄 것으로 기대한다.
        4,000원
        425.
        2009.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 조사는 낙동강 유역의 홍수피해를 저감하고, 경북중부지역의 안정적인 용수를 공급하기 위해 경북 군위군 고로면에 건설 중인 화북댐의 상∙하류 어류조사를 통하여 댐 건설이 하천유역에 특히 수 생태계내의 어류군집에 미치는 영향유무를 파악하여 종 다양성을 보전하고 하천의 건강성을 유지하기 위한 기초자료로 활용하고자 하였다. 화북댐 상∙하류에서 사후환경영향조사 기간(2004~2008년) 중 측정된 수질항목 분석결과 현장에서 측정한 수온, 용존산소, 수소이온농도와 실내분석 항목인 부유물, 총대장균수의 경우 지점별로 다소 계절에 따른 변화를 나타냈지만 큰 차이를 보이지는 않았으나 유기물 및 영양염류 농도에 해당하는 생물학적∙화학적 산소요구량, 엽록소, 질소, 인의 경우 지점별로 매우 큰 폭의 변화를 보였으며 상류에서 다소 높고 하류에서 낮은 경향을 보였다. 중금속 중 비소의 경우 2005년 6월 0.092 mg L-1를 제외하고는 0.05 mg L-1 이하를 나타내어 하천수 수질환경기준 상 사람의 건강 보호 측면에서 규정한 0.05 mgL-1 이하의 범위 내에서 나타나는 것으로 확인되었다. 화북댐 상∙하류에서 어류조사를 실시한 결과 총 7과 19종 10,263개체가 확인되었다. 조사된 어류 중 우점종은 하천 중∙상류에 주로 서식하는 참갈겨니(62.5%)로 확인되었으며 아우점종은 버들치(10.6%)로 나타났다. 조사 구간인 위천 상류에서 확인된 19종 중 한국고유종은 긴몰개, 동사리, 쉬리 등 총 9종(47.4%)으로 나타났으며, 멸종위기야생동∙식물 I급으로 지정된 얼룩새코미꾸리(Koreocobitis naktongensis)가 소수의 개체이지만 포획되었고, 외래도입종은 확인되지 않았다. 군집분석 결과 우점도 지수는 하류로 갈수록 감소한 반면에 다양도, 풍부도 지수는 하류로 갈수록 증가하였다. 우점종인 참갈겨니의 개체군 분석 결과, 길이-무게 상관관계식은 TW=0.000003 (TL)3.2603로서 매개변수 b값이 3.0보다 크게 나타나 개체군의 영양상태가 양호한 것으로 나타났다. 또한 유사시기에 다른 하천에서의 개체군들과 비교분석 결과 size별 평균 비대지수(CF)가 상대적으로 높은 값을 보여 화북댐 유역의 참갈겨니가 다른 지역보다 성장률이 높았다. 화북댐 상∙하류에서 어류 조사 자료를 활용하여 하천건강성평가(IBI)를 적용한 결과, 대부분의 지점에서 양호(26~35)에서 최적(36~40)을 보였으며 지점 5에서 평균값이 가장 높게 나타냈다. 이러한 결과를 바탕으로 지속적인 모니터링을 실시하여 어류에 관한 환경영향평가와 하천건강성평가 등을 통한 화북댐 완공 후 상∙하류 하천의 어류상 변화유무 및 환경영향을 파악하는데 도움이 될 것으로 사료된다.
        4,000원
        426.
        2009.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        최근 민간투자에 의한 사회기반시설 확충, 육상 도로망의 직선화 및 최적화를 위해 항만 및 주요 항로를 횡단하는 해상교량 건설이 활발히 추진되고 있다. 이러한 해상교량 건설에 있어 해상이용자의 통항 안전, 항만 운영의 효율화 및 장기 개발 등에 미치는 영향을 충분히 고려하지 않고 경제적인 측면만을 부각하여 건설되고 있다. 이로 인해 해상교량의 위치 및 규모 결정시 해상교통안전 확보를 요구하는 해상이용자와 해상교량 건설주체와 지속적인 갈등이 반복되고 있는 실정이다. 이러한 문제들의 근본적 원인은 항만의 개발 운영 및 해상교통안전 관점에서 제시된 해상교량 건설시에 필요한 교량규모 및 통항 예상 대상 선박 등에 대한 설계기준 및 절차 통이 없기 때문이다. 이에 본 연구에서는 항만별 해상교량 건설현황을 조사 분석을 통해 국내 해상교량 건설에 따른 절차상의 문제점을 우선 고찰하여 개선 방안을 제시하고자 한다.
        4,000원
        427.
        2009.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        As shown in the accident analysis from 2007, it has been found that causes of accidents on large-scale projects are different from those found in general construction projects. A 300-question survey regarding systematic and practical aspects of safety problems at construction sites was distributed to ten (10) different companies. Participants were to respond subjectively, so that the results could be used to assemble the first formal questionnaire survey. They were collected and compiled by an advisory committee for this study. The resulting surveys were then sent to the division chiefs of the top 100 construction companies in Korea, in order to improve the response rate. The Department of Safety & Health Direction, and the :Ministry of Labor, ROK sent the same sheets to medium and small construction companies that placed within 101-200th of all Korea construction companies. The above safety engineers were classified into four (4) levels, from 1st to 4th, followed by the project dollar amount and risk level. Formulae were developed to assign safety engineers to construction sites by engineer level, the project dollar amount, and the project risk level. Conclusions are summarized as follows: 1) Reviewing the assignment system of experienced safety engineers to large scaled projects - The more experienced the engineers assigned to a project, the higher the level of accident prevention. 2) Enforcing the assignment of advanced level safety engineers to large-scaled sites - At least one advanced-level safety engineer should be assigned to construction sites with projects valued at 15million USD (15,000,000,000). 3) For assigning safety engineers by risk level - Twenty models have been developed to calculate the number of safety engineers to be assigned by risk level. In the future, risk level for each job should be established by the government (as is now the practice in Germany).
        4,000원
        428.
        2009.06 구독 인증기관 무료, 개인회원 유료
        4,000원
        432.
        2008.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This paper analyses the railroad trunk line constructed in the Korea since the end of the 19th century. The analysis consists of the following problematics. 1) The process of the decision of the railroad route 2) The relationship of the location of Eupchi and the stations By clarifying the above, the purpose of this paper is to clarify how the morphology of the city in Korea has been affected by the change in the relationship with Korea and Japan. The Empire of Japan has been reconnoitering the Korea since way before the formal contract for the railroad construction was signed. Therefore, the Empire of Japan had a very good understanding of the actual transportation system when it started the construction of the railroad. The railroad construction was used by the Empire of Japan to empower the control over the Korea. For this reason, the new railroad system was constructed as a different system from the former transportation system and the urban system was also affected. Also the relationship of the western powers and Japan around the turn of the 20th century defined the characteristic of the railway system as a pathway through the Korean peninsular to link Japan to the continent. Moreover, being apprehensive about the friction with the western, Japan located the railway stations to avoid the missionary land properties. This made it clear that the restraint relationship between Japan and the western affected the urban special structure.
        4,900원
        438.
        2008.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        According to statistics released by the Ministry of Labor for the past 6 years, work-related accidents in the construction industry have been on the continued increase, resulting in social and economic losses that are difficult to determine at an exact amount. However, the number will likely get much bigger if unreported cases are included, considering the fact that the aforementioned statistics are based soley on the applications filed with Korea Workers' Compensation and Welfare Service. The practice of businesses choosing not to report and dealing with industrial accidents in an unauthorized manner is defined as "concealment of industrial accident". The reason the employers tend to engage in the concealment practice even at their huge cost is a "pre-qualification" scheme for the applicants in the government procurement process. Under the pre-qualification scheme, the applicants with a high rate of industrial accidents receive a low grade and become less attractive candidates in the procurement process, thus losing an opportunity to win a contract. Such failure relates directly to the fate of business organizations, to survive or not. That is why they are making all-out efforts to obtain a high grade in the pre-qualification evaluation. With regard to the accident-concealment problem, the following can be mentioned as preventive measures: (1) To exclude a rate of industrial accidents from the pre-qualification scheme; (2) To strengthen the institution of imposing penalties on the occurrence of industrial accidents; (3) To introduce private insurance system to the current industrial accident compensation insurance; and (4) To give non-recognition treatment to industrial accidents that were not reported upon occurrence. In conclusion, the concealment problem can be resolved if the aforementioned measures are to be taken continuously along with corrective measures against institutional deficiencies.
        4,000원
        439.
        2008.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구에서는 현재 실존하는 제방을 대상으로 제방겸용도로 건설에 따른 안정성의 변화를 살펴보기 위해 건설단계별로 도로건설을 위한 성토 후, 겸용도로 건설 후 도로를 주행하는 차량에 의한 교통하중이 재하될 경우로 구분하여 안정성 변화를 분석하였다. 연구결과 겸용도로 건설을 위한 성토 후와 교통하중(DB-24)을 적용하였을 경우 모두 일반적인 안전율 기준인 1.3을 상회하고 있어 겸용도로 건설에 따른 제방의 안전은 확보되는 것으로 분석되어 제방겸용도로의 건설은 부지 확보 비용 절감을 위해 건설이 가능할 것으로 판단된다. 그러나 겸용도로의 건설로 인해 제방의 안전율 감소 현상이 발생하기 때문에 안정성에 대한 사전 검토가 충분히 이루어져야 할 것이다. 특히 안전율 감소가 가장 큰 경우는 비정상류 상태의 수위상승의 경우로 분석되어 하천제방과 같이 수위변화가 빈번한 경우에는 비정상류 해석으로 설계하는 것이 바람직하며 제내지의 사면경사는 기존제방과 동일한 1:2의 경사를 유지하도록 설계하는 것이 필요할 것으로 판단된다. 또한, 교통하중에 의한 안전율 감소현상도 발생하는 것으로 분석되어 겸용도로 건설 후 주행차량의 하중제한 등 유지 관리에도 지속적인 관심을 기울여야 할 것으로 판단된다.
        4,000원