검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 33

        1.
        2015.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The purpose of this study is to confirm the removal effect of odorous gas through the multi process. The combination of Scrubber, UV and Adsorption was analyzed using the odor gas of reservoir. Analysis was carried out for six times in total and collection was made once per each process. Sampling was performed in the afternoon during August (1:00 pm~4:00 pm). Multi process has been designed to facilitates the accessories exchange. The advantage is that it facilitates the replacement of the activated carbon and it is convenient to change the type of chemical according to the type of pollution materials. As a result, for odor gas removal efficiency, ammonia 91.8%, trimethylamine 72.0%, hydrogen sulfide 99.9%, methyl mercaptan 99.9% were removed respectively. Removal efficiency of the process is the scrubber (alkali), activated carbon adsorption, scrubber (acid) and UV procedure from the highest order. Further studies on the operating method and efficiency of multi process by the change of wind speed and chemical are recommended.
        4,000원
        2.
        2014.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        We studied the changes in the concentration of total volatile organic compounds generated in newly-built schools (five kindergarten schools, two primary schools, three middle schools, one high school) by the bake-out. Samples were collected in classrooms. By using the bake-out technique the removal efficiency of total volatile organic compounds was 89.1%(maximum) and 27.5%(minimum). By using this bake-out technique the removal efficiency was 42.5% greater than the ventilation method. Therefore, we determined that it is appropriate to apply both the bake-out and ventilation methods in the case of newly-built schools
        4,000원
        3.
        2013.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study aimed to identify the recognition of fire risks on their field operations among firefighters and contribute to setting up safety measures accordingly. A self-administered questionnaire were used to evaluate their recognition of job risks. About 93.4% of respondents answered they have exposed to job risks and 73.4% answered that they had high safety awareness. Our study showed that the lower service years and ranks the fire officers had, the lower relevance in statistics their awareness of the risk of the field operations and safety concerns had. The vulnerable group is those aged 20 to 39, with under 10 years of service, at a lower rank of senior fire sergeant. The study suggests coming up with the measures to motivate the officers to perform safe operations by improving their safety awareness.
        4,000원
        4.
        2013.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study is aimed to investigate the occupational safety and health management of contractor company in the car industry. The questionnaire survey was conducted on the suppliers and contractors of car industry. Data were collected from 10 contractor companies and their 291 contractor companies(each outside and inside company). From the survey result, it was found that the level of all-round safety and health management is above the average. To strengthen the relationship for safety and health management, it is needed that the supplier company employ the person in exclusive charge to support contractor. Also it is needed the active support of the contractor company and needed that the supplier company employ the person in exclusive charge to support contractor. Finally, Many of the problems associated with the safety and health management by strengthening contractor company responsibility will have to be solved simultaneously.
        4,000원
        5.
        2013.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Based on a literature review regarding shift work, it is recognized that it has an adverse effect on workers' health. Especially, the night shift rather than the day shift imposes severe disorders on workers, which are indicated to dyssomnia, maladaptation to social life, and health problems such as gastroenteric trouble, cardiovascular diseases and depression. As the shift work can be explainable by using workers' labor ability necessarily to maintain company business consistently, it does not consider biorhythm, active mass and health condition of workers Actually duration of shit work would deprive workers of fundamental life rights by causing physical and mental effects. As a result of reviewing previous case studies related to effect of work pattern (day shift and night shift) on workers' health, an incidence of physical diseases like dyssomnia, gastroenteric trouble, cardiovascular diseases and premature delivery was higher in shift workers than normal workers. Additionally the incidence of mental disorders such as busy brain, social isolation, depression and work stress was also higher in shift workers than normal workers. These adverse physical and mental problems were intensified to night shift workers compared to day shift workers. Considering current various reports and study results, it is recommended that the shift work, especially the night work pattern, should not apply to contemporary work situation for sustaining workers' health condition constantly.
        4,000원
        6.
        2012.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        To verify the effect of driver's personal characteristics of driver on the accident frequency through railway accidents caused by human errors and the relationship with aptitude test. To prove the relevance between the driver's personal characteristics and human error accidents. Accident data from 2010 to 2011 was analyzed which collected from a train crew department in K national corporation, and 31 drivers gave an personal interview from Sep. 2011 to Nov. 2011 who had controlled a train alone and caused an accident. Compared between driver's personal characteristics and accident rate, and accident induction possibility surveyed from normal person and disqualified in aptitude tests. Accidents was occurred with the age 40s (27%) and 50s (25%), and with the experience between 15 years and 20 years (38%) and over 20 years (30%). Because more aged, more experienced, it can be seen in the correlation between driver's age and accidents induction caused by human errors like illusion. First of all it must be checked whether working conditions and environmental factors are human error-prone. Most accidents occur when received civil complaints or manager at the riding. Therefore accidents can be prevented when investigated through subsequent surveys how often human error happens, even though no accident, and safety device installed based on the error frequency.
        4,000원
        7.
        2012.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Steel industry in Korea is a key national industry that has led economic growth for a long time. And accidents occurred from a variety of causes has endlessly made as much as remarkable achievements of steel industry. It is a fact that research achievements of disaster prevention in steel industry has not been significantly, compared to production technique achievements. And the level of interest on safety management in the steel industry is conspicuously low. Although support activity for a various safety management are provided reasonably to prevent disasters occurring with subcontractors. A method capable of quantitative evaluation, applied to subcontractors in most business places are relatively rare except parent firms-leading places. This study is to make and show safety management activities to purcue in advance in conjunction with a parent firm through development of a more systematic and quantitative evaluation model for disaster prevention with steel industry subcontractors, and to contribute to disaster prevention in domestic steel industry through advanced safety management method, by applying a proposed evaluation model of safety management activities as subcontractors in steel industry.
        4,000원
        8.
        2011.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Unit cost for asbestos removal work which have been made out at government contract award for recent three years has been reviewed and shown with table. And the cost have been compared with ones made out by two agencies, American asbestos removal specialists, government ministry for making out comparison tables. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there in introduction possibility of separate contract-awarding system, it is found out. In interior removal work case, it is thought that 50% by owner, 60% unit work cost by the expert of which removal specialist think as reasonable unit cost. the results for exterior and spray work method are shown with almost same context. Impact factors for determining unit work cost such as project mount, project kind, contract-awarding method, subcontract method have been compared with parties. Removal specialist and expert group have almost same ideas for project amount which has been hightestly weighed but owner's recognition has partially lower than specialists idea. There are almost no difference of recognition between three(3) parties for project kind. Idea comparison of reasonable unit work cost for asbestos removal work between three concerned parties has been analyzed and found out that expert group do unit work cost, 65% of which removal specialists estimate, in interior tex removal. And there is almost no difference between them in exterior roof slate removal. But there is considerable difference between them that owner estimates 50% unit cost of specialist one while expert group estimate 50% of specialist idea of unit removal cost.
        4,000원
        9.
        2011.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Project owner, asbestos removal specialist, experts on asbestos removal work, as counter parts to be defined in the study to make out research goals have been asked with questionnaire survey and replied with 65, 275, 32 cases, respectively. And additionally, direct interview 73 sheets have been collected to find out current status of required engineers and equipments assigned and provided to the field, from them, three(3) concerned parties. Questionnaire subjects are composed of common items, reasonable unit cost, need of separate contract-awarding system, status of performing standard contract, status of providing legal engineers and equipments. Concentrated review of two~three questions by subject has been made to find out and compare idea results between three(3) concerned parties. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there is introduction possibility of separate contract-awarding system, it is found out. The possibility of separate contract also has been confirmed by comparison of domestic legal grounds. Justificating grounds to introduce separate contract-awarding system have been shown. Standard contract status between asbestos removal specialists has been compared using two cases of providing removal work contract and receiving it. It is shown that case of 50 percent or less contains 38.5% when they receive contract, but only 10 percent reduction of original contract amount has been made when they provide it. It means that asbestos removal specialists do not keep occupational safety and health regulations.
        4,000원
        10.
        2010.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Risk level for each construction work can be very important factors to establish advanced prevention measures. But it is important how to produce it. There are three different methods to set it up for construction situation. They are as follows; 1) occurrence frequency = the number of accident workers of each work kind / yearly accident workers 2) occurrence frequency = the number of accident workers of each work kind / yearly workers 3) occurrence frequency = the number of accident workers of each work kind / the total workers All these three concepts(=averaged concept)are analyzed. Additionally frequency based on discrete curve, and severity based on continuous curve are also combined for producing risk level with more scientific approach. This risk level can be very useful to make prevention plan or take measures at construction sites. This is study result can change existing risk level concept to new concept of it, namely rail way work and in-water work showed be high risk level and RC work be low risk level, different from the situation which we have thought commonly, so far.
        4,000원
        11.
        2010.04 구독 인증기관 무료, 개인회원 유료
        Risk level for each construction work can be very important factors to establish advanced preventionmeasures. But it is important how to produce it. There are three different methods to set it up for consturuction situation. They are as follows; 1) occurrence frequency = the number of accident workers of each work kind / yearly accident workers 2) occurrence frequency = the number of accident workers of each work kind / yearly workers 3) occurrence frequency = the number of accident workers of each work kind / the total workers All these three concepts(=averaged concept)are analyzed. Additionally frequency based on discrete curve, and severity based on continuous curve are also combined for producing risk level with more scientific approach. This risk level can be very useful to make prevention plan or take measures at construction sites. This is study result can change existing risk level concept to new concept of it, namely rail way work and in-water work showed be high risk level and RC work be low risk level, different from the situation which we have thought commonly, so far.
        4,000원
        12.
        2009.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        As shown in the accident analysis from 2007, it has been found that causes of accidents on large-scale projects are different from those found in general construction projects. A 300-question survey regarding systematic and practical aspects of safety problems at construction sites was distributed to ten (10) different companies. Participants were to respond subjectively, so that the results could be used to assemble the first formal questionnaire survey. They were collected and compiled by an advisory committee for this study. The resulting surveys were then sent to the division chiefs of the top 100 construction companies in Korea, in order to improve the response rate. The Department of Safety & Health Direction, and the :Ministry of Labor, ROK sent the same sheets to medium and small construction companies that placed within 101-200th of all Korea construction companies. The above safety engineers were classified into four (4) levels, from 1st to 4th, followed by the project dollar amount and risk level. Formulae were developed to assign safety engineers to construction sites by engineer level, the project dollar amount, and the project risk level. Conclusions are summarized as follows: 1) Reviewing the assignment system of experienced safety engineers to large scaled projects - The more experienced the engineers assigned to a project, the higher the level of accident prevention. 2) Enforcing the assignment of advanced level safety engineers to large-scaled sites - At least one advanced-level safety engineer should be assigned to construction sites with projects valued at 15million USD (15,000,000,000). 3) For assigning safety engineers by risk level - Twenty models have been developed to calculate the number of safety engineers to be assigned by risk level. In the future, risk level for each job should be established by the government (as is now the practice in Germany).
        4,000원
        13.
        2008.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        It is a fact that domestic performance art has been sharply progressed but it is focused on only performance quality technique, not on safety of performers and the audience. It is a pity that people's effort to keep safe stage environment have not traced to innovative change, eventually leading to be forced to perform under hazardous condition. This study is to find out and identify that domestic regulation and accident cases are investigated and compared with cases of advanced countries, to verify that performer and the audience are main elements to develop performance art. And it is to show more effective safety measure after pointing out hazardous elements. Research change is limited to review only performance ones of all cultural facilities and to review accident cases from these places to show reasonable safety measures for stage facilities. Operation manager covers almost all of areas such as devices, management, despite a fact that they take charge of stage facilities, illumination, sounds, already. Some conclusions are as follows; 1) performance theatre-related regulations should be established again. domestic safety standards for performance theatre safety should be established. 2) characteristic and purpose of performance place should be clarified at the stage planning and design of them 3) operation expert performance place is required to be trained to cover emergency situation at any time.
        4,000원
        14.
        2008.04 구독 인증기관 무료, 개인회원 유료
        공연예술의 급속한 발전이 이루어지고 있으나 공연의 질, 연출 기법이나 공연에 필요한 시설에만 초점을 맞추고 있고 정작 공연장을 사용하는 배우와 관객들의 안전은 등한 시 되어 최근 수년간 공연장의 물리적 환경의 미비와 무대시설의 운영 미숙 등에 따른 각종 사고가 연이어 발생하고 있는 것이 국내 실정이다. 본 연구는 공연장 안전에 대한 국내 외 공연장 관련법규와 무대사고의 사례를 살펴보고 공연장의 무대 공간에 잠재해 있는 각종 위험 요소를 분석함으로서 공연장 사고예방을 위한 체계적 안전대책을 제시하는데 그 목적이 있다.
        4,200원
        16.
        2007.08 KCI 등재 구독 인증기관 무료, 개인회원 유료
        There are something unreasonable, unsatisfactory on the law system for laboratorial safety enforced by the government from April 2006. Therefore, the system should be reviewed and revised to be satisfactory for current research condition. This study is to analyze research areas for improving laboratorial safety and to show safer ideas. With more detail, more practically improving ideas have been shown for systemizing safety assessment in advance, effective organization of laboratory, safety committee and their regulation. It is expected that better safety level all the concerned engagement, reasonable revision of safety regulation of laboratory, can be made by this research result.
        4,000원
        1 2