검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 930

        502.
        2004.05 구독 인증기관 무료, 개인회원 유료
        The establishment and application of risk management system is one of the current issues in world-wide leading companies. Poor risk management might bring large-scale accident in construction industry by its features(large scale, diversity). Standardization system and standard for risk should be managed timely. In this paper, we do comparative analysis of standardization systems and standards concerned on risk, so thus present basic data for safety reinforcement and risk zero in the construction life cycle process.
        4,000원
        503.
        2004.03 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        To validate the previous conceptual design of cover system, construction of the engineered barrier test facility is completed and the performance tests of the disposal cover system are conducted. The disposal test facility is composed of the multi-purpose working space, the six test cells and the disposal information space for the PR center. The dedicated detection system measures the water content, the temperature, the matric potential of each cover layer and the accumulated water volume of lateral drainage. Short-term experiments on the disposal cover layer using the artificial rainfall system are implemented. The sand drainage layer shows the satisfactory performance as intended in the design stage. The artificial rainfall does not affect the temperature of cover layers. It is investigated that high water infiltration of the artificial rainfall changes the matric potential in each cover layer. This facility is expected to increase the public information about the national radioactive waste disposal program and the effort for the safety of the planned disposal facility.
        4,300원
        504.
        2004.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        얼음골 주변의 지표면 변화에 따른 중규모 대기순환장에 미치는 효과를 보기위하여 수치실험을 실시하였다. 얼음골 남북 경사면에서 발생하는 순환장은 지형과 단파복사에 의한 영향으로 다르게 나타나며, 비대칭을 이룬다. 그리고 이러한 비대칭은 18시까지 계속된다. 야간의 경우, 도로건설에 따른 대기순환장의 차이는 크지 않다. 이것은 주간 단파 복사에 의한 현열플럭스가 감소하며, 현열플럭스외의 다른 요소는 크게 영향을 미치지 않는다는 것을 의미한다. 도로의 건설은 현열플러스의 증가와 관련되고, 주간의 경우, 지형에 의한 곡풍과 결합하여 도로가 없는 경우에 비하여 상승류가 강하여진다. 최대풍속은 4.67 m/s이다. 그리고 이때 도로의 위치역시 주요한 요인으로 작용한다.
        4,800원
        506.
        2003.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study suggests a safety management model for construction management (CM) suitable to domestic conditions so that inefficiency resulted from the operation of construction projects by public and private institutes according to different systems can be eliminated for the securing of systematic and efficient safety management. Based on the suggested safety management model, this study also develops a safety management information system that can efficiently and consistently manage and maintain a large quantity of information, and give necessary supports in a speedy way in the managing of construction projects.
        5,100원
        507.
        2003.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In this paper, we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM method. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries,' thereby strengthening there competitive edges. Boost of safety control system by PSM method will make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.
        4,000원
        508.
        2003.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        10,500원
        509.
        2003.11 구독 인증기관 무료, 개인회원 유료
        Construction Management(CM) system, which was introduced some years ago to large national construction projects, such as the construction of Incheon New Airport, construction of high-speed railroad and World Cup stadiums, is considered to be still in its early stage and safety at each step of CM is very poorly controlled. In an attempt to improve such inferior safety management of domestic CM, this study made comparative analysis about operation system of safety management with CM system in domestic and abroad. Also suggested the model under consideration with CM, which is suitable for the situation of Korea.
        4,200원
        510.
        2003.11 구독 인증기관 무료, 개인회원 유료
        산업재해의 직접적인 원인은 작업자의 불안전한 행동과 작업과정에서의 안전시설 설치미흡으로 인한 불안전한 상태로와 기술적, 교육적, 관리적 원인의 복합적인 형태로 발생되는데 그 가운데 산업안전보건법상의 건설공사 각 공종 별 기술적인 안전시설설치 기준이 건설업 종사자에게 쉽게 적용하기가 현행 법기준에는 문제점이 있으며 이러한 복잡한 법기준을 분석하여 안전사고 예방 기법에 적용하고자 제시하고자하며, 향후에 이를 바탕으로 산업안전보건법상의 안전기준을 체계적으로 분석하여 제시하고자 한다.
        4,000원
        512.
        2003.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Construction Management(CM) system, which was introduced some years ago to large national construction projects, such as the construction of Incheon New Airport, construction of high-speed railroad and World Cup stadiums, is considered to be still in its early stage and safety at each step of CM is very poorly controlled. In an attempt to improve such inferior safety control of domestic CM, this study analyzed safety control operation system in CM home and abroad and suggested a model for the construction of safety control management information system suitable to the conditions of Korea.
        4,200원
        513.
        2003.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        As domestic buildings have been large-scaled, diversified and high-rise, there have been a consistent demand for design, development of construction technology and accident prevention activity as well as quality enhancement. In spite of governmental and r
        4,000원
        515.
        2003.09 구독 인증기관 무료, 개인회원 유료
        4,000원
        516.
        2003.05 구독 인증기관 무료, 개인회원 유료
        As domestic buildings have been large-scaled, diversified and high-rise, there have been a consistent demand for design, development of construction technology and accident prevention activity as well as quality enhancement. In spite of governmental and related institutions' efforts for reducing national losses which come from numerous accidents, there have been endless small and large accidents on the construction site and thus, it is urgent to conduct empirical researches in this area. Currently safety supervision system in construction industry has enforced harm and danger prevention planning system, however it merely stick to other existing materials. In addition, it is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM(Process Safety Management) method Using AHP(Analytic Hierarchy Process) and to Development of PSM evaluation method in the construction. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries,' thereby streng3thening there competitive edges. Boost of safety control system by PSM method will make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.
        4,000원
        520.
        2002.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        As domestic buildings have been large-scaled, diversified and high-rise, there have been a consistent demand for design, development of construction technology and accident prevention activity as well as quality enhancement. In spite of governmental and related institutions' efforts for reducing national losses which come from numerous accidents, there have been endless small and large accidents on the construction site and thus, it is urgent to conduct empirical researches in this area. Currently safety supervision system in construction industry has enforced harm and danger prevention planning system, however it merely stick to other existing materials. In addition, it is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM method. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries,' thereby strengthening there competitive edges. Boost of safety control system by PSM method will make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.
        4,600원