검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 1,121

        623.
        2003.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        4,300원
        625.
        2003.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        4,000원
        626.
        2003.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This paper proposes a heuristic scheduling algorithm to satisfy the customer''s due date in the production process under make to order cnvironment. The goal is to achicve the machine scheduling in the transformer winding process, in which consists of para
        4,000원
        627.
        2003.05 구독 인증기관 무료, 개인회원 유료
        In this paper, we proposed the optimal process conditions on the electro-gilding process. The responses are plating thickness and Sn proportion. The factors are temperature, current density, and addition. We minimized the total number of experiments based on the principle of dividing into small part. We grouped the factors using the plating process information which we already knew. We did Hull Cell test to find relationship between plating solution and electric effects, and applied ANOVA and RSM to estimate the optimal process conditions.
        3,000원
        628.
        2003.05 구독 인증기관 무료, 개인회원 유료
        본 연구에서는 철강 공정의 생산 계획 문제들 중에서 가장 중요하다고 판단되는 원료 충당 문제, 용량 할당 문제 및 BAF 설비 운영 문제를 설명하고, 이 문제점들을 해결하기 위한 방법을 제시한다. 또한, 특정의 툴을 사용하여 적용이 가능한 기능을 제시하는데 이 때 사용되는 생산 계획 툴은 i2사의 Factory Planner이다.
        4,000원
        629.
        2003.05 구독 인증기관 무료, 개인회원 유료
        Recently, a number of enterprise have introduced Information Systems(IS) to cope with the rapidly changing circumstances and to improve their competitive advantage and successful implementation of Information Technology influence the success of business. Managements identify that it is necessary for systematic analysis and plan to adopt IS throughout the failure of IS projects. So Information Strategy Planning(ISP) is presented as the alternative. Recent, researches in the ISP have concentrated on the examination of large and successful corporations. For this reason, it is difficult that we apply the result to small and medium sized enterprise(SMEs). Thus, this paper searches characteristic of SMEs form informatization point of view and the ISP approach for successful informatization of SMEs.
        3,000원
        630.
        2003.05 구독 인증기관 무료, 개인회원 유료
        There is only one server available and arriving work require services from this server. Job are processed by the machine one at a time. The most common objective is to sequence jobs on the severs so as to minimize the penalty for being late, commonly called tardiness penalty Based on other objectives, many criteria may serve as s basis for developing job schedules. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem and reducing inventory, product development time, cycle time, and order lead time.
        4,000원
        631.
        2003.05 구독 인증기관 무료, 개인회원 유료
        The process of railway traffic planning is composed of several steps such as long - term, mid - term, short - term, and real - time plan. The planning of vehicle and manpower resources is a main research topic in tactical short - term planning step Railway vehicle is usually consisted of a power car, passenger/freight cars and human resource is composed of engine driver, cabin crew, ground personnel. So far , power car was main research target in railway vehicle scheduling problem. Recently according as the light electric railway or high - speed railway is introduced, the operational planning of train set vehicles become important . In this paper , we introduce the conceptional model for trainset restoring problem and developed heuristic algorithm.
        4,000원
        632.
        2003.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        난온대 지역인 완도난대수목원과 신지도, 장도 등을 사례연구 대상지를 선정하여, 기초환경 조사 및 훼손등급 사정 후, 산림기능과 복원목표식생 설정, 식생복원유형과 복원기법 등을 구상하여 사례지의 난온대 상록활엽수림 복원계획안을 제시하였다. 사회적 요구와 복원목표 등을 고려하여 산림기능은 생태계보존기능, 풍치보전기능, 임목생산기능으로 구분하였고, 복원목표식생은 붉가시나무림, 구실잣밤나무림, 후박나무림. 생달나무림, 황칠나무림 등으로 설정하였다. 식생복원유형은 보존형 복원형. 재현형, 조림형으로, 복원기법은 훼손등급에 따라 보존, 유도, 개량, 조성으로 세분하였다.
        4,300원
        634.
        2003.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Scheduling plays an important role in shop floor planning. A scheduling shows the planned time when processing of a specific job will start on each machine that the job requires. It also indicates when the job will be completed on every process. Thus, it is a timetable for both jobs and machines. There is only one server available and arriving work require services from this server. Job are processed by the machine one at a time. The most common objective is to sequence jobs on the severs so as to minimize the penalty for being late, commonly called tardiness penalty. Based on other objectives, many criteria may serve as s basis for developing job schedules. The process also comprises all strategic planning, capital investments, management decisions, and tasks necessary to create a new product. manufacturing processes must be created so that the product can be produced in the product facility. Purchasing new equipment and training workers may be required if new technology is to be used. Tools, fixtures, and the sequence of steps in the manufacturing processes must all be developed to allow rapid, high-quality, cost effective production. Also, it may be needed to be rearrange the production facility to adapt to the new manufacturing processes. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem and reducing inventory, product development time, cycle time, and order lead time.
        4,000원
        635.
        2002.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        6,900원
        636.
        2002.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구는 경기도 용인시 학고개지역에서 도로건설에 의하여 훼손된 산림지역의 브릿지형 생물이동통로 식재계획을 수립하고자 실시하였다. 연구내용은 대상지 및 주변지역 자연생태계 조사 분석단계와 식재계획단계로 구분하여 실시하였다. 자연생태계 조사분석은 지형구조, 식물군집구조, 동물서식구조를 분석하였으며, 식재계획은 이동종선정, 식재공간구분 및 개념, 식재종 및 식재밀도를 제시하였고, 식재기본계획도를 작성하였다. 대상지의 지형구조는 산림능선을 훼손한 급경사 지형에 브릿지형의 생물이동통로 유형 조성이 가능하였고 동물의 이동은 생물이동통로 양쪽 끝부분에만 가능한 것으로 판단되었다. 식물군집구조 분석은 도로를 기점으로 동서 지역으로 구분하여 실시하였다. 이들 두 지역 모두 산복과 산록부는 졸참나무와 굴참나무가 우점종인 군집이었으며, 능선부에는 소나무림이 토지극상으로 분포하였고 이들 두 지역간 유사성도 높은 상태이었다. 야생동물서식구조는 야생조류와 일부 포유류를 대상으로 하였으며, 야생조류는 총 7종 57개체, 설치류는 2종 2개체가 관찰되었다. 식재계획에서 이동목표종은 야생조류와 일부 포유류로 설정하였고, 이들 종의 이동을 위한 식재공간은 야생조류 이 동 및 서식 공간과 포유류 이동지 역 을 구분하였으며 , 세부적으로 완충지역으로 브릿지 입출구 사면지역의 관목식재지, 차폐식재지, 양쪽 산림지역과 연결된 급경사지역 초본식물 군락식재지, 야생동물 유도식재지 야생조류 이동을 위한 군락식재지, 포유동물 이동을 위한 군락식재지, 야생조류 서식처 조성을 위한 군락식재지로 구분하였다. 식재종은 주변산림지역에서 상재도가 높은 종을 중심으로 선정하였고 각 공간별 식재밀도를 고려하여 식재기본계획도를 작성하였다.
        5,100원
        637.
        2002.11 구독 인증기관 무료, 개인회원 유료
        The product process is sequence of all the required activities that a company must perform to develop, and manufacture a product. These activities include marketing, research, engineering design, quality assurance, manufacturing, and a whole chain of suppliers and vendors. The process also comprises all strategic planning, capital investments, management decisions, and tasks necessary to create a new product. manufacturing processes must be created so that the product can be produced in the product facility Purchasing new equipment and training workers may be required if new technology is to be used. Tools, fixtures, and the sequence of steps in the manufacturing processes must all be developed to allow rapid, high-quality, cost effective production. Also, it may be needed to be rearrange the production facility to adapt to the new manufacturing processes. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem and reducing inventory, product development time, cycle time, and order lead time.
        4,000원
        638.
        2002.10 구독 인증기관 무료, 개인회원 유료
        In this paper, we propose a case study to treat planning and scheduling in factory of supply chain. In fact, the planning and the scheduling of a factory are not easily solved because of constraints of facility resources, material requirements, allowed planning times, and so on. However many packages are developed by vendors in Advanced Planning and Scheduling(APS) aspects to solve these problems. We, therefore, analyze problems of an electronic company and apply the tool, Factory Planner(FP), to solve problems.
        4,000원
        639.
        2002.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        교량의 내진성능확보를 위한 유지보수계획을 수립하는데 있어서, 전체 생애주기비용의 최소화를 통하여 최적의 검사 및 수리회수의 결정방법을 제시한다. 생애주기 비용에는 초기비용, 파괴비용 뿐만 아니라, 검사 및 보수비용이 포함된다. 시간에 따른 내진성능저하모델을 손상함수를 이용하여 표현하였으며, 손상감지정도에 따른 Event Tree Analysis를 통하여 유지보수에 따른 파괴확률을 랜덤진동이론을 이용하여 산출한다. 예제로서 10경간 연속교의 최적유지보수방법을 살펴본 결과, 가속도계수가 증가하고, 연약지반일수록 최적유지보수회수는 증가하는 것으로 나타났다.
        4,000원