검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 103

        21.
        2017.04 구독 인증기관 무료, 개인회원 유료
        Preventive measures against industrial accidents should take into account the safeguards of unsafe states, education, and managerial measures to control the underlying sources of unsafe and unsafe behavior. Technical and managerial problems are also attributable to the educational cause. In particular, in the in-house safety education system, many construction sites form formal safety education.Inherent safety education is the best safeguard against disaster prevention. In the future, the safety education coordinator and the safety education coordinator of the management and supervision of the safety supervisor and hazardous hazard workers will need to improve the active legal system that can be pursued by all trained persons.
        3,000원
        22.
        2017.04 구독 인증기관 무료, 개인회원 유료
        Safety accidents, which are called industrial accidents in construction work, are often caused by unstable physical and personal conditions combined during preparation and execution of work. It is difficult to manage all the construction works, but especially in the field of apartment construction work, complex and many kinds of works are being carried out at the same time. In the current construction, safety regulations such as safety management guidelines are generally well maintained, but the execution of manpower resources that can fulfill them is limited, and it is difficult to reduce the accident rate and loss cost. Therefore, in this study, it is a reality that most of the types of construction work are under contruction by subcontracting contract, so they are limit by methods of manual maintenance and safety education. Currently, the subcontractor is also allowed to perform safety management through the composition of the safety management review body, but it is operated formally. So alternatives to this were studied. As a result, safety accidents occur in the subcontractor's workplace due to vertical integration, which is a characteristic of the construction industry. Therefore, the safety management should be carried out by the subcontractor as well as the subcontractor It is concluded that effective and practical safety management can be achieved when management based on the personality that can communicate with each other through the management team is able to reduce the accident rate and loss cost.
        4,000원
        24.
        2017.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In construction work, safety accidents often occur in combination with unstable physical and human conditions during preparation and execution of work. In Korea, the accident rate is higher to that of any country in the world. Therefore, it is necessary to take measures by fundamental prescription. In this paper, in the case of construction safety management, we tried to find a reasonable alternative through a questionnaire survey to apply to subcontracting and small-scale construction. In conclusion, workers who are well aware of the task could be able to reduce the accident rate by deploying them as safety management officers after receiving the training.
        4,000원
        25.
        2017.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In the construction sites, rush (speedy construction) work have recently been overused because of budget reductions by reducing the construction duration after the long-term economic recession and construction business stagnation with institutional change including the instruction of the duration shortening bidding system and the introduction of the post-construction sales system by the Korea Research Institute for Human Settlements. Due to this, negligent accidents have frequently occurred by forcing manpower, equipment, finance, and material procurement and pressing ahead with impractical construction wok at night according to the reduction of construction schedules. Therefore, this paper has the necessity of this study to seek for alternatives to prevent negligent accidents by finding factors related to rush work in the reality that the importance for preventing negligent accidents is more emphasized while they have not been reduced in construction sites.
        4,200원
        27.
        2016.11 구독 인증기관 무료, 개인회원 유료
        Safety accident in Building construction work in the process of preparation and implementation of the insecure human, material status is often caused by combining the reality is that many things. Accident rate is a similar level in the case of Korea and foreign countries than any country in the measures by the higher fundamental prescription is needed. In this paper, construction safety management of subcontracting work and small construction plan to apply through a survey to reach a sensible alternative. I did In conclusion, the educated workers know well, and so on the work schedule then quickly if safety management personnel in disaster will be able to reduce the rate to a miracle appeared.
        4,000원
        28.
        2016.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Due to increased demand for remodeling and repair in construction market in recent year, the usage of horse scaffold is increasing in the indoor finish works. Injuries related horse scaffold are mainly caused by poor installation or of careless handling of scaffold. Approximately 300 workers are injuried at construction site every year, it is accounting for about 1.5% of the total construction sector and has increased on a year-to-year trends. But the main contents between national standards and speccifications related to the manufacture and usage of horse scaffolds are mutually inconsistent, In particular, the rules on occupational safety and health standards are the basis for the prevention of industrial injuries, there is no explicit application being made to the horse scaffold commonly used on construction sites. The purpose of this study was to analye the manufacture and usage situations in order to reduce construction injuries that occur at the horse scaffolds. It will be utilized the results of the analysis as the basis data for unifying the major domestic standards and specifications associated with the manufacture and usage of horse scaffold.
        4,000원
        29.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recent News patrons of incidents can be called sinkhole that occurred one after another (Sink Hole). Due to this anytime, anywhere I do not know how the land is turned off worry and anxiety is the reason why you can never be dismissed as exaggerated. As we have seen today through the video, the vehicle was traveling on a road or pedestrian who was walking down the street they look out of the basement of a sudden they still come to mind vividly. Here, examples and corresponding measures to prevent the sinkhole off the ground, including the causes and impact on society because of this that occurred, and policy measures and abroad are evaluated with respect to what it is.
        4,000원
        30.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study analyzed the safety management efficiency through input-oriented BCC Model using DEA by making of Models, in which this study selected the number of staff affiliated with the construction site, number of staff members on the construction team, and number of safety personnel as Input Factor, along with the number of disaster victims and zero-accident accomplished hours as output elements, targeting 40-or-so apartment building construction sites which are being built by 3 domestic construction companies. As a result of efficiency, it was 0.643, the number of efficient DMU was 4. In the aspect of returns to scale, 21 construction sites(52.5%) found to be in a state of increasing returns while 14 construction sites(35%) was in a state of Decreasing returns. The reason for inefficiency was found to lie in technical factors in case of 30 construction sites(75%). Lastly, inefficient DMU is in need of 38.9 % and 66% reduction in site personnel and safety personnel. Based on study results, the 29 construction sites accounting for 72.5% of DMU for safety management efficiency evaluation object turned out to do inefficient safety management that doesn't fit the size of each company.
        4,000원
        31.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recently, the domestic air construction site is shortened rapidly, Ltd. is inevitable for reasons such as reduced air according to client's demands have been made. Accidents that occur during rapid construction is a situation that occurs accordingly indispensable. In the rapid construction and a study about the impact on safety and prevention measures and to contribute to accident prevention.
        4,000원
        32.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recently, the Ministry of Employment and Labor Management is a trend to strengthen all men death rate than the accident rate. Points reduction in the accident rate change orders related to credit rating score to +2 points in his plans as part of +1 point. In addition, according to the fancy linger RISK treatment in the event of a disaster site and fiction treatment to achieve accident-free during processing the scene interspersed with equity issues have been raised. In general disaster for the problem in the first two cases occurs when abnormal process according to the disaster site manager positions dismissal policy, each division headquarters itself, interspersed disasters performance compared to processing in accordance with the refrain, processing expenses in accordance with the composition of untreated industrial accident, costs and burdens partners FTC , there is a possibility that the issues raised, such as the Ministry of Employment and Labor. In response to domestic social practices focused on the construction site practices and prevention measures should be evaluated with respect to what.
        4,200원
        33.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Total accident rate in the construction industry is a very meaningful reduction to establish a comprehensive disaster reduction measures, including through the Survey, the disaster prevention projects whilst driving status and problem analysis in order to reduce the mature workers in the construction industry is growing rapidly in all disaster disasters (share) The days. It is urgent to establish a framework and measures that can identify the specific cause for this than for the middle-aged workers and disaster reduction in disaster reduction efforts, which continue to increase. Used as measures of information and data presented in the basic requirements of mature workers also been.
        4,000원
        34.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recent construction site large disaster occurs in, even normal disaster not be reduced, the efforts of pre-disaster prevention for this is also a need to study the evaluation index. By comprehensive examination zero reform the current lowest bid system has included the social responsibility index is scheduled, objective and quantitative evaluation indicators making construction safety areas that are included in the item of social responsibility is required ing. In this study, the construction, in order to prevent disasters, efforts pre disaster prevention be presented metrics in the construction safety in the field of comprehensive examination system and the evaluation index, it is intended to examine the evaluation items for the evaluation indices .
        4,300원
        36.
        2015.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Depending on the growth of the construction industry, size of construction sites are becoming enlarged, and construction work is becoming diversified as well. However, this increases risks of safety accidents. In order to alleviate this problem, some large construction companies have implemented a Safety Patrol Management System (SPMS) in order to reduce accidents on construction sites. Aimed at the construction sites where SPMS has been applied, the purpose of this research is to calculate the proper number of SPMS safety mangers by comparing and contrasting the number of safety managers per person for each site with different sizes and the converted accident ratio. In addition, we also aim to calculate the adequate amount of SPMS safety management costs compared to the total amount of construction expenses required once SPMS is introduced.
        4,000원
        37.
        2015.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Domestic plant construction sites have a tendency to become bigger, more various and complicated. Moreover frequency of industrial incident is increasing due to short project period, coexistence work condition and using heavy construction equipment. Installing safety facilities and safety training contribute to prevent incident. But mostly incident happens due to workers’ unsafe action and wrong work method. Technically, it is very difficult for us to closely manage workers preventing incident. Therefore, the role of foreman who ordinarily works together with his workers is considered more important. Specific execution plan was drawn through industrial incident statistics from Ministry of Labor and questionnaire survey to interest parties(supervisor, safety staff and foreman). If foreman has raised sense of belonging and responsibility by conducting practical safety training for his workers, manages job site and receives proper compensation for these roles, it will be expected that it fully influences incident decrease.
        4,300원
        38.
        2015.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The torque shear high strength bolt is clamped normally at the break of pin-tail specified. However, the clamping forces on slip critical connections do not often meet the required tension, as it considerably fluctuates due to torque coefficient dependent on lubricant affected temperature. In this study, the clamping tests of torque shear bolts were conducted independently at indoor conditions and at construction site conditions. During last six years, temperature of candidated site conditions was recorded from -11℃ to 34℃. The indoor temperature condition was ranged from -1 0℃ to 50℃ at each 10℃ interval. As for site conditions, the clamping force was reached in the range from 159 to 210 kN and the torque value was from 405 to 556 Nㆍm. The range of torque coefficient at indoor conditions was analyzed from 0.126 to 0.158 while tensions were indicated from 179 to 192 kN. The torque coefficient at site conditions was ranged from 0.118 to 0.152. Based on this test, the variable trends of torque coefficient, tension subjected temperature can be taken by statistic regressive analysis. The variable of torque coefficient under the indoor conditions is 0.13%/℃ while it reaches 2.73%/℃ at actual site conditions. When the indoor trends and site conditions is combined, the modified variable of torque coefficient can be expected as 0.2% /℃. and the modified variable of tension can be determined as 0.18%/℃.
        4,000원
        39.
        2015.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구는 건설현장 소장의 진성리더십이 현장직원의 조직시민행동, 종업원몰입에 미치는 영향과 이들 간의 관계에 있어서 조직후원인식의 매개역할을 살펴보았다. 본 연구의 조사대상자는 고속도로건설현장(37개), 인천공항건설현장(12개), 철도건설현장(10개), 광역지자체건설현장(14개), 국도건설현장(2개) 등 75개 건설현장에 근무하고 있는 현장직원을 대상으로 하였다. 회수된 설문지 630부 중에서 불성실한 응답자를 제외한 622부가 분석 자료로 활용되었다. 설문분석결과는 다음과 같다. 첫째, 현장소장의 진성리더십이 현장직원의 조직후원인식, 조직시민행동과 종업원몰입과 정(+)의 관계를 나타났다. 둘째, 현장직원의 조직후원인식이 조직시민행동과 종업원몰입과 정(+)의 관계를 나타났다. 셋째, 현장직원의 조직후원인식이 현장소장의 진성리더십과 현장직원의 조직시민행동, 종업원몰입 사이에서 부분매개 하는 것으로 나타났다. 이러한 결과는 현장소장의 진성리더십이 현장직원의 조직후원인식을 향상시키고 향상된 조직후원인식은 현장직원들의 조직시민행동, 종업원몰입에 영향을 발휘한다는 것을 알 수 있었다. 본 연구는 건설현장 내에서 절대적 권한을 갖고 있는 건설현장 소장의 진성리더십의 영향력을 평가하였다는 점과 매개변수로써 조직후원인식의 역할을 검증하였다는 점에서 의의가 있다.
        5,800원
        40.
        2015.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Total industrial accident rate in Korea is facing a record 0.7% for 10 years since 2000. After entering the continuous versus 0.6% (0.69%) in 2010. In 2011, the decrease was reduced to 0.65%. Conversely In contrast to foreign workers' share has increased dramatically over 10 years since 2000 to 2010 are expected to be difficult in the accident rate of 0.5% for the entry. Despite the ongoing disaster reduction efforts to reduce disaster (share) of foreign workers has been increasing rapidly Survey, Whilst the provision of disaster prevention system status and problem analysis and identify measures that can be established through such disaster reduction measures are urgently needed.
        4,200원
        1 2 3 4 5