검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 7

        2.
        2004.05 구독 인증기관 무료, 개인회원 유료
        Last 2003, the CRM mayor was not lively glaringly. At beginning of the year, it may be said that gained result fewer than half of that is forecasted. Enterprises are seen that there are a lot of occasions that did not carry CRM project that planned very first time in practice or put off investment program until 2004 altogether. This can see that it is thing which CRM's accuracy of data analysis process drops up to now and investment of enterprises is unprepared. In this paper, It consolidates the necessity on a LTV (Life Time Value) and analyzes data which is concerned of Customer Value. Under the these environments, defines the LTV rule that can improve the customer value. And then, Scheduling plays an important role in shop floor planning. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem.
        3,000원
        3.
        2004.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        We can be acquire the conformation about on the due date of supplier by using the A TP(A vail able to Promise) function of management about real and concurrent access on the supply chain, also decide the affect about product availability due to forecasting or customer's orders through the A TP. Under the these environments, defines the A TP rule that can improve the customer value and data flow related the LTV(Life Time Value) and builds on a algorithm. In this paper, It consolidates the necessity on a LTV (Life Time Value) and analyzes data which is concerned of Customer Value. Under the these environments, defines the LTV rule that can improve the customer value. And then, Scheduling plays an important role in shop floor planning. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem.
        4,000원
        4.
        2003.05 구독 인증기관 무료, 개인회원 유료
        There is only one server available and arriving work require services from this server. Job are processed by the machine one at a time. The most common objective is to sequence jobs on the severs so as to minimize the penalty for being late, commonly called tardiness penalty Based on other objectives, many criteria may serve as s basis for developing job schedules. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem and reducing inventory, product development time, cycle time, and order lead time.
        4,000원
        5.
        2003.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Scheduling plays an important role in shop floor planning. A scheduling shows the planned time when processing of a specific job will start on each machine that the job requires. It also indicates when the job will be completed on every process. Thus, it is a timetable for both jobs and machines. There is only one server available and arriving work require services from this server. Job are processed by the machine one at a time. The most common objective is to sequence jobs on the severs so as to minimize the penalty for being late, commonly called tardiness penalty. Based on other objectives, many criteria may serve as s basis for developing job schedules. The process also comprises all strategic planning, capital investments, management decisions, and tasks necessary to create a new product. manufacturing processes must be created so that the product can be produced in the product facility. Purchasing new equipment and training workers may be required if new technology is to be used. Tools, fixtures, and the sequence of steps in the manufacturing processes must all be developed to allow rapid, high-quality, cost effective production. Also, it may be needed to be rearrange the production facility to adapt to the new manufacturing processes. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem and reducing inventory, product development time, cycle time, and order lead time.
        4,000원
        6.
        2002.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Today's environment of enterprise is changing, They have to face customer' demands with the right product, the right service and supply them at the right time. And also cut down logistics and inventory cost and bring up the profit as much as they can. This means the change of putting enterprise first in importance to putting customer first importance. therefore to correspond to customer's demand, shorting lead time is becoming a essential condition. The answer to this changes of environment is supply chain management. In this paper, It consolidates the necessity on a LTV(Life Time Value) and analyzes data which is concerned of Customer Value. Under the these environments, defines the LTV(Life Time Value) rule that can improve the customer value. We solved this problems using AHP(Analytic Hierarchy Process) for consistency at relationship matrix, AHP(Analytic Hierarchy Process) is based on Saaty's consistency rate. If consistency rate is under 0.1 point, preference rate's weights are acceptable. This study develop a program for AHP weights and support Satty's consistency rate.
        4,000원