검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 404

        222.
        2011.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study is on the pedagogical convention of architectural history in Korea, especially that of Western Architecture. Recent institutional change in architectural school in Korea has caused overall restructuring of academic program. In spite of extension in the field of history there was no progress of method and way of thinking. There is no change in the point of view to see the western architecture and its history as a unique and specialized phenomenon in the civilization of mankind. Because of no recognition about for what, for whom, and how to, and because of orientalism, the cultural position of western architectural history and its narrative was not asked. With the help of post-colonialism, de-constructivism and critical historiography this paper tries to show the fundamental premise of western architectural history as a myth and show its prejudice as not being justifiable. The background of the discourse there has been a representation effect with regard to knowledge as a power. we need to escape from this kind of cognitional frame With the analysis of the its premise and narrative we can find it is a historical construct that was made in the age of imperialism. In fact it has a lot of false information and problematic point of view. The Identity and originality of western architecture and its history has no logical reason or foundation if we think that it depends on the difference and comparison with other civilization. For example the explanation of its historical origin western architecture has big difference with Islamic architecture in spite of the resemblance each other. This paper try to show several reasons that discourse of western architectural history can not be survived any longer. So we need to reconstruct new pedagogy with deconstruction for the students of non western, or Korean students. Because it has important effect to see and think about architecture and its history.
        5,500원
        223.
        2011.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In the history of visual art the images were often combined with linguistic text, as it is exemplified by the early egyptian mural, medieval religious painting with biblical quotation and the cubist paintings in 20st century. In those works the image and text cooperated complementarily with each other, pursuing the representation of the real. But in the second half of 20st century the poststructuralists proclaimed that the real doesn't exist at all and it is no more than the construction pursued by the signs such as language and image. Facing the crisis of representation the role of image and text in the visual art should have been changed. One of the leading video artist Gary Hill explored in his single channel video works in 1980's the working mechanism of image and text and their interaction, treating them as open signifier, which can be related numerous changeable new meanings. He also concentrates his inquiries on the role and meaning of language within our culture and other human context and destructed the existing mechanism of representation, which based on the solid relationship between signifier and signified. So, in <Why Do Things Get in a Muddle> he questions paradox of the logic, which served to produce the meaning of the world. In <Incidence of Catastrophe> he showed that all the metaphysical basement of our experience are not in itself real but they are just constructed through the semiotic process of image and words. These aspects of his arts are in some degree influenced by intellectual disposition of conceptual art in 1970's years, which revolved around the language instead of images. But his works explored not only the language but also the images as sign. Therefore his approach differ from the conceptual art, which eliminated the retinal aspects from their work. His works also set themselves apart from the ideology critical provocative work in 1980's, which targeted specific political and social issues. As he himself reaffirmed, his work focused on semiotic process and revealed unreliability of the working mechanism of logic, on which all the value system in our world based. In this sense his work in 1980's could be called meta-semiotic work.
        6,400원
        230.
        2011.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Unit cost for asbestos removal work which have been made out at government contract award for recent three years has been reviewed and shown with table. And the cost have been compared with ones made out by two agencies, American asbestos removal specialists, government ministry for making out comparison tables. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there in introduction possibility of separate contract-awarding system, it is found out. In interior removal work case, it is thought that 50% by owner, 60% unit work cost by the expert of which removal specialist think as reasonable unit cost. the results for exterior and spray work method are shown with almost same context. Impact factors for determining unit work cost such as project mount, project kind, contract-awarding method, subcontract method have been compared with parties. Removal specialist and expert group have almost same ideas for project amount which has been hightestly weighed but owner's recognition has partially lower than specialists idea. There are almost no difference of recognition between three(3) parties for project kind. Idea comparison of reasonable unit work cost for asbestos removal work between three concerned parties has been analyzed and found out that expert group do unit work cost, 65% of which removal specialists estimate, in interior tex removal. And there is almost no difference between them in exterior roof slate removal. But there is considerable difference between them that owner estimates 50% unit cost of specialist one while expert group estimate 50% of specialist idea of unit removal cost.
        4,000원
        231.
        2011.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Project owner, asbestos removal specialist, experts on asbestos removal work, as counter parts to be defined in the study to make out research goals have been asked with questionnaire survey and replied with 65, 275, 32 cases, respectively. And additionally, direct interview 73 sheets have been collected to find out current status of required engineers and equipments assigned and provided to the field, from them, three(3) concerned parties. Questionnaire subjects are composed of common items, reasonable unit cost, need of separate contract-awarding system, status of performing standard contract, status of providing legal engineers and equipments. Concentrated review of two~three questions by subject has been made to find out and compare idea results between three(3) concerned parties. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there is introduction possibility of separate contract-awarding system, it is found out. The possibility of separate contract also has been confirmed by comparison of domestic legal grounds. Justificating grounds to introduce separate contract-awarding system have been shown. Standard contract status between asbestos removal specialists has been compared using two cases of providing removal work contract and receiving it. It is shown that case of 50 percent or less contains 38.5% when they receive contract, but only 10 percent reduction of original contract amount has been made when they provide it. It means that asbestos removal specialists do not keep occupational safety and health regulations.
        4,000원
        232.
        2011.06 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        해체의 최종단계는 대상 부지 및 건물을 규제로부터 제외하는 것이다. MARSSIM은 부지를 개방하기 위한 최종현황조사를 수행함에 있어 요구되는 자료의 수집 등의 다양한 요건을 만족키기 위한 총괄적인 지침을 제 공한다. 연구로 해체 후 부지 및 건물의 최종현황조사를 위해 MARSSIM에서 제시하고 있는 방법을 적용하였 다. 연구로 부지의 특성을 반영한 개방기준을 도출하기 위해 RESRAD 및 RESRAD-Build 전산코드를 이용하여 부지 및 건물에 대해서 계산하였다. 부지 및 건물의 조사설계(Survey Design)를 위해서 잠재적 오염도 및 측정 결과를 활용하여 조사구역을 구분하였고, 개략조사 및 특성조사를 통해 수집된 다양한 결과에 기초하여 통계 학적 검사를 통해 조사구역 별로 요구되는 시료의 수를 산정하게 된다. 측정된 결과에 기초하여 연구로 최종 현황조사는 개방기준에 만족하는 것으로 평가되었다.
        4,000원
        238.
        2010.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        It is necessary that End-of-life Vehicle (ELV) should be recycled from the point of view of environmental preservation and resource recycling. This paper deals with two issues. The first one is the basic functional construction and plant layout of the ELV dismantling system that can maximize the reusability of parts and the recyclability of materials. The second issue is the development of a simulation model which can be used to estimate the performance of the layout design. The simulator has been interfaced with an interactive layout design system, and used to effectively determine an optimal layout design of the ELV dismantling system.
        4,000원
        239.
        2010.09 KCI 등재후보 구독 인증기관 무료, 개인회원 유료
        This study has attempted to investigate current asbestos laws in the amended Occupational Safety and Health Act on the removal and disposal of asbestos. Among 800 registered asbestos removal and disposal companies, 499 firms were investigated from August 7 to December 10, 2009. The qualified inspectors (those with Industrial Hygiene Engineer’s License or higher-level technical license) are educated for more than three hours before starting the inspection. In terms of regional distribution, Gyeonggi / Incheon was the highest with 105 companies(21%), followed by Daegu / Gyeongbuk(100, 20%), Chungbuk(97, 19.4%), Jeonbuk(37, 7.4%), Gwangju / Jeonnam (35, 7.0%) and Seoul(33, 6.6%). In terms of the number of education and technical assistances(1,348 in total) among 499 asbestos removal and disposal companies ,‘personal protective equipment and putting it on(287, 21.3%)’ was the highest, followed by ‘safety & health actions by asbestos removal and disposal work(171, 12.7%),’ ‘hazard of asbestos(168, 12.5%),’ ‘NO SMOKING and NO FOOD(164, 12.2%)’ and ‘prevention of asbestos fibers from being airborne(12, 0.9%).’A questionnaire consisted of 11 questions regarding the obse tance of enforcement ordinances associated with the removal and disposal of asbestos. According to an investigation on the current status of the workplace based on inspectors’ checklists, 3 scores were maintained in average. This paper has limitations because it has failed to randomly investigate the workplace because it is very strict to visit the asbestos removal and disposal sites.
        4,500원