Potholes on urban expressways are a critical pavement maintenance problem because they threaten driving safety, generate vehicle-damage claims, and require repeated emergency repairs. However, network-level evidence integrating climate, traffic, maintenance execution, and detection practice remains limited. This study addressed this gap through a stage-1 empirical assessment of pothole occurrence and pavement maintenance response on the Seoul urban expressway network. The novelty lies in integrating six years of operational data, including pothole repair records, compensation cases, monthly rainfall, monthly average temperature, route-level traffic volume, maintenance budget and execution records, detection pathways, and repeated pothole locations. A total of 28,821 pothole repairs were recorded between 2020 and 2025, with Olympic-daero (11,330 cases), Dongbu Trunk Road (6,594 cases), and Gangbyeonbuk-ro (5,067 cases) accounting for approximately 79.8% of the total. The compensation burden was also concentrated, with 158 cases and a total payout of KRW 48,592,000. Pothole occurrence showed a clear dual-season pattern, with high counts during the thawing period and a stronger summer peak, increasing from 1950, 3100, and 3773 cases in June, July, and August when rainfall rose from 174.60 mm to 333.68 mm and 352.15 mm, respectively. Traffic remained consistently high (48,576–96,700 vehicles/day) but varied by only approximately 5.1% annually, indicating that climate governed outbreak timing, while traffic acted mainly as a chronic aggravating factor. Artificial intelligence (AI)-based Camera Detection System (CDS) detection contributed to 54.3% and 57.2% of external detections in 2024 and 2025, respectively, while repeated repairs accounted for 3,957 cases across 783 locations (13.7% of total repairs). These findings support seasonal preventive maintenance, route-based prioritization, AI-assisted detection, and hotspot-focused management.
본 연구에서는 개별 상수도관이 상수도관망 유지관리 데이터베이스에서 관의 격리 밸브 사이의 개체로 정의되지 않은 경우 상수도관의 사고 위험도를 산정할 수 있는 기법을 개발하였다. 이 기법은 사고 위험도 산정 과정에서 상수도관에서 사고 발생시 수리 및 복구 작업에 따른 상수도 관망의 일부 구간의 격리로 인한 사고 영향의 확장을 반영할 수 있도록 설계되었다. 이 기법을 활용하여 우리나라의 한 지자체 상수도 관망내 관들에 대한 사고 위험도를 평가하였다. 또한, 연구대상 상수도 관망의 관들에 대해 노후도를 산정하였으며, 이를 추정된 사고 위험도와 같이 활용하여 연구대상 상수도 관망의 유지관리 우선순위를 설정하였다. 마지막으로, 사고 위험도와 노후도에 적용한 가중치가 상수도 관망의 유지관리 우선순위 산정 결과에 미치는 영향을 분석하였다.
This study aims to quantitatively evaluate the life cycle carbon emissions of continuously reinforced concrete pavements on Korean expressways. The analysis focuses on assessing the effect of the changes in pavement design life and maintenance frequency on total carbon emissions to provide a basis for effective carbon reduction strategies. In accordance with ISO 14040 and ISO 14044, carbon emissions were calculated using actual design documents, including bills of quantities and unit price lists. National emission factors were applied to each life cycle stage, including the maintenance stage that was modeled based on the standard maintenance scenarios of the Korea Expressway Corporation. The study also conducted a scenario-based evaluation to examine the impact of extending the pavement design life from 20 to 30 years on maintenance-related emissions. The usage stage accounted for the largest share of total emissions, followed by the material production and maintenance stages. Notably, repeated asphalt overlay maintenance contributed significantly to emissions. Extending the design life reduced the number of high-emission maintenance activities, leading to a significant reduction in the total life cycle emissions. Extending the pavement design life and optimizing maintenance cycles were effective strategies for reducing the life cycle carbon emissions in road infrastructure. Furthermore, applying eco-design principles—such as incorporating recycled aggregates or low-carbon cement during the design stage—could further enhance sustainability. Future research should include various case studies and support the development of standardized national life cycle inventory databases for road infrastructure systems.
최근 4차 산업 혁명의 도래와 함께 기술의 발전에 따라 자율운항 선박에 대한 관심이 높아지고 있다. 미래의 선박은 고기량 선원들 의 육상 근무 선호도 증가와 승선 인원 제한으로 인해 점차적으로 낮은 기량의 선원들이 승선하며 선원 수가 감소될 전망이다. 따라서 선박의 안전 운항을 위한 운동 및 조종의 제어뿐만 아니라 자율운항 선박의 원활한 유지보수를 위해 증강현실 기반의 원격 유지보수 시스템이 필요하며 현재 개발이 활발히 진행 중이다. 증강현실 기반 원격 유지보수 시스템에서는 3D모델만 가시화하는 것은 활용성 이 떨어진다. 또한, 애니메이션을 개발하는 것은 개발 플랫폼에 대한 의존도가 높기 때문에 호환성 및 활용성이 떨어진다. 이러한 문 제를 해결하기 위해 손쉽게 정비 애니메이션을 만들 수 있는 저작도구가 필요하다. 따라서, 본 연구에서는 이러한 문제를 해결하기 위 해 Json 파일 형식으로 정비 애니메이션 중립 포맷을 만들어 경량화 및 호환성 높은 정비 애니메이션을 위한 저작도구를 개발하였다. 또한, 프로토타입을 개발하여 활용성을 검증하였고, 다른 플랫폼과의 호환성 검증을 진행하였다. 마지막으로, 애니메이션을 제작할 수 있는 소프트웨어와의 비교를 통해 제안한 저작도구의 유효성을 입증하였다.
This study aims to enhance the efficiency of the after-sales service (A/S) process for commercial trucks by implementing a data-driven approach. Traditional A/S methods result in long repair wait times, especially for intermittent faults requiring symptom reproduction. To address this, a system that records Diagnostic Trouble Code (DTC) and Vehicle Running Mode (VRM) data at failure moments is proposed. By storing data from 10 seconds before and after an event, fault diagnosis can be performed without symptom reproduction. Additionally, for exported vehicles, stored data enables remote analysis, overcoming real-time data limitations due to varying environmental factors. This approach improves maintenance reliability, optimizes repair accuracy, and supports proactive quality improvements for newly developed vehicles.
도로 관리는 교통 시스템과 국가 경제에 중대한 영향을 미치며, 이에 따라 도로 유지관리는 시민들의 삶의 질을 향상시 키는 데 중요한 역할을 한다. 따라서 체계적인 유지관리는 도로 안전성과 경제적 효율성을 높이는 데 필수적이다. 기존 의 도로 관리 방식은 대부분 반응적이며, 종이 문서를 기반으로 이루어져 정보 손실, 데이터 손상, 검색의 어려움 등의 여러 제한점을 가지고 있다. 이러한 문제를 해결하기 위해 본 논문에서는 3D 모델과 관련 데이터를 일대일 매핑하여 자 동으로 입력할 수 있도록 하는 BIM (Building Information Model)을 활용한 접근 방식을 제안한다. 본 연구는 주로 BIM 생성을 위해 널리 사용되는 Autodesk Revit을 활용하여 3D 도로 모델을 생성하고, 도로의 손상 정보 (길이, 폭, 보수 면 적, 보수 부피, 유지보수 이력 등)를 통합 관리하는 방법을 연구한다. 하지만 Revit은 디지털 정보를 3D 모델에 자동으로 가져오는 기능이 없기 때문에, Visual Programming 도구를 이용하여 유지관리 기록 정보를 BIM으로 자동 입력하는 방 법을 개발하였다. 이를 통해, 사용자가 특정 도로 손상 모델을 선택하면 해당 손상의 통합 이력을 표시할 수 있는 새로 운 통합 이력 관리 시스템을 구축하였다. 이러한 접근 방식은 종이 문서 기반의 기록 방식에서 발생하는 데이터 손상, 기록량 증가, 특정 데이터 검색의 어려움 등의 문제를 해결할 수 있으며, 신속하고 정확한 의사 결정을 지원한다. 본 연 구는 BIM을 활용한 도로의 통합 이력 관리 시스템 구축을 통해 새로운 방향성을 제시한다.
Automobiles are an essential means of transporting passengers and cargo, but traffic accidents are inevitable in their operation. These accidents can occur in various forms, such as front, rear, and side collisions. The resulting damage to the vehicle can also be seen similarly; it is inherently distinct: the complexity of repairing the car body makes a simple reliance on textbook knowledge insufficient. Successful correction of the damaged body largely depends on the experience of the practitioner. Discussions on body repair techniques should be based on empirical data reflecting current industry standards and associated costs. The variability of individual repair methodologies can result in significant time and financial expenditure in the field of automotive bodies. Application of new material technologies to vehicle fabrication requires continuous training and empirical research, especially on the body repair process involving new materials. In particular, since the left and right aprons and side members are made of different materials, such as aluminum and high-strength steel, careful restoration of these parts is required. Technical considerations are needed. Interest in safety and environmental impacts. In this study, SPR bonding technology analyzes experimental results.
현재 국내에서는 아스팔트 포장의 예방적 유지보수공법의 사용이 미미하며, 시공 기준 또한 부재한 실정이다. 이에 따라 포장가속시 험시설을 활용하여 예방적 유지보수공법 적용에 대한 공용성 변화 분석을 진행하였다. 본 연구에서는 포그씰 A, B 공법에 대해 도포 량을 다르게 시공하여 기능성 인자인 BPN, MPD와 물성 인자인 공극률에 대해 추적조사를 진행하여 공용성 변화를 분석하였다. 주행 횟수의 산정은 가속시험기의 등가단축하중(ESAL, Equivalent SIngle Axle Load)의 관계식을 통해 실제 교통량을 등가단축하중으로 환산 하여 가속시험 주행 횟수를 산정하여 시공 후 공용 1년까지의 성능을 분석하였다. 분석 결과 기능성 인자인 MPD는 차량 주행으로 인 해 점차 감소하였으며, BPN은 시공 직후 포그씰 처리로 인한 미끄럼 저하가 지배적으로 나타났으나 점차 회복되는 것으로 나타났다. 물성 인자인 공극률은 주행 횟수가 증가할수록 포그씰이 포장 표면으로 채워져 공극률이 줄어드는 것으로 나타났다. 도포량별 분석 결과 도포량이 가장 많은 구간에서 저하율이 모든 인자에서 가장 큰 것으로 나타났으며, 두 도포량의 경우 인자별로 미세한 차이는 존재하였으나 대부분 비슷한 경향을 보이는 것으로 확인되었다.
국내 도로 연장은 2023년 기준 115,878km로 매년 증가하는 추세를 보이고 있다. 이중 준공 30년 이상된 노후도로의 비율은 51.5%에 해당하고 있어 도로 유지관리의 중요성이 대두되는 실정이다. 본 연구에서는 아스팔트 예방적 유지보수공법인 포그씰(Fog Seal)을 실 제 공용중에 있는 도로에 적용하여 공용성 변화를 분석하였다. 공용성능 분석을 위해 차량의 휠패스 부분에서 공법당 6개의 코어를 3 차년간 채취하여 공극률 및 바인더 함량 값을 비교하였다. 분석 방법으로는 포그씰 공법을 시공하지 않은 구간을 대조군으로 선정하 여 추적조사 기간에 따른 변화 추이를 분석하였다. 분석 결과, 공극률은 포그씰 시공 이후 지속적인 감소를 보였다. 바인더 함량의 경 우 공용연수가 증가할수록 바인더 함량 또한 점차 증가하는 것으로 확인되었다. 이는 공용연수가 증가함에 따라 차량의 주행으로 인 해 표면에 도포된 포그씰이 점차 도로 표면 및 균열 속으로 스며들어 내부의 공극이 채워지는 것으로 판단된다.
In the contemporary era, 3D printing technology has become widely utilized across diverse fields, including biomedicine, industrial design, manufacturing, food processing, aerospace, and construction engineering. The inherent advantages of automation, precision, and speed associated with 3D printing have progressively led to its incorporation into road engineering. Asphalt, a temperature-responsive material that softens at high temperatures and solidifies as it cools, presents distinctive challenges and opportunities in this context. For the effective implementation of 3D printing technology in road engineering, 3D printed asphalt (3DPA) must exhibit favorable performance and printability. This requires attributes such as good fluidity, extrudability, and buildability. Furthermore, materials utilizing 3DPA for crack repair should possess high viscosity, elasticity, toughness, superior high-temperature stability, and resistance to low-temperature cracking. These characteristics ultimately contribute to enhancing pavement longevity and ensuring worker safety.
PURPOSES : This study proposes a framework for promoting future expressway remodeling projects by reviewing similar overseas cases and comparing them with current Korean expressway remodeling projects. METHODS : Based on a literature review, this study examines the major issues in expressway remodeling projects and proposes the development of a framework for establishing and promoting such projects. This framework provides detailed guidance by categorizing the project into legal system adjustments, traffic management plans, and social consensus. RESULTS : The diagnosis of issues in domestic expressway remodeling projects revealed significant problems in conceptual aspects, criteria for project evaluation, formulation of traffic diversion strategies, and deficiencies in related legal frameworks. To address these issues, a framework for advancing future remodeling projects was established based on the results of overseas case studies. CONCLUSIONS : As roads deteriorate, the demand for remodeling projects to restore them increases. However, the current implementation of remodeling projects lacks systematic procedures. This study serves as foundational research for establishing an environment conducive to the smooth progress of such projects. By initiating subsequent research, conditions for the smooth progress of remodeling projects are expected to be established.
PURPOSES : The purpose of this study was to evaluate the common performance of asphalt pavements, determine the timing of preventive maintenance, and determine the optimal timing of application of the preventive maintenance methods by analyzing PMS data. METHODS : Using PMS data on asphalt pavement performance on highways, we derived the major damage factors and evaluated them according to the public period and traffic level. Among the factors evaluated, we determined those that could be improved by preventive maintenance, calculated the amount of change annually, and derived the timing of the application of the preventive maintenance method through correlation analysis. RESULTS : Among highway PMS data factors, crack variation was found to affect preventive maintenance, which increased rapidly after five years of performance. Traffic analysis showed that changes increased rapidly in the fifth, sixth, and seventh years when AADT exceeded 20,000, exceeded 10,000, and was under 10,000, respectively. Analysis of the amount of crack variation according to the pavement type showed that crack variation increased rapidly in the overlay section compared to the general AP section. CONCLUSIONS : Crack variation is the performance factor that was expected to be effective in preventive maintenance, and the PMS data showed that the initial application time of the preventive maintenance method varied by one year, depending on the traffic volume.