Unit cost for asbestos removal work which have been made out at government contract award for recent three years has been reviewed and shown with table. And the cost have been compared with ones made out by two agencies, American asbestos removal specialists, government ministry for making out comparison tables. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there in introduction possibility of separate contract-awarding system, it is found out. In interior removal work case, it is thought that 50% by owner, 60% unit work cost by the expert of which removal specialist think as reasonable unit cost. the results for exterior and spray work method are shown with almost same context. Impact factors for determining unit work cost such as project mount, project kind, contract-awarding method, subcontract method have been compared with parties. Removal specialist and expert group have almost same ideas for project amount which has been hightestly weighed but owner's recognition has partially lower than specialists idea. There are almost no difference of recognition between three(3) parties for project kind. Idea comparison of reasonable unit work cost for asbestos removal work between three concerned parties has been analyzed and found out that expert group do unit work cost, 65% of which removal specialists estimate, in interior tex removal. And there is almost no difference between them in exterior roof slate removal. But there is considerable difference between them that owner estimates 50% unit cost of specialist one while expert group estimate 50% of specialist idea of unit removal cost.
Project owner, asbestos removal specialist, experts on asbestos removal work, as counter parts to be defined in the study to make out research goals have been asked with questionnaire survey and replied with 65, 275, 32 cases, respectively. And additionally, direct interview 73 sheets have been collected to find out current status of required engineers and equipments assigned and provided to the field, from them, three(3) concerned parties. Questionnaire subjects are composed of common items, reasonable unit cost, need of separate contract-awarding system, status of performing standard contract, status of providing legal engineers and equipments. Concentrated review of two~three questions by subject has been made to find out and compare idea results between three(3) concerned parties. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there is introduction possibility of separate contract-awarding system, it is found out. The possibility of separate contract also has been confirmed by comparison of domestic legal grounds. Justificating grounds to introduce separate contract-awarding system have been shown. Standard contract status between asbestos removal specialists has been compared using two cases of providing removal work contract and receiving it. It is shown that case of 50 percent or less contains 38.5% when they receive contract, but only 10 percent reduction of original contract amount has been made when they provide it. It means that asbestos removal specialists do not keep occupational safety and health regulations.
This paper presents the loading safety of slab structures during building demolition to establish practical criteria of demolition work. The weight of stacking debris and woring machine.are loaded on the slab structures and the structural safety of slab structures is investigated based on structural analysis.
건설해체공사와 유사한 특성을 갖는 원전 제염해체공사에서 구조적 리스크 관리는 매우 중요하다(DOE). 하지만 제염해체작업 중 발생할 수 있는 구조적 재난재해 및 위험요소는 크게 고려하지 않고 있다. 이로 인해, 구조적 재난 및 재해에 의해 발생할 수 있는 작업자 리스크 역시 체계적으로 정립되어 있지 않다. 또한, 재난 및 재해 그리고 리스크 분류체계는 작업의 특성(작업프로세스, 활용장비, 작업 위치 등)별로 분류되어 있지 않아 실제 해체공사를 위한 매뉴얼로 활용하기에 무리가 있다. 따라서 차폐 콘크리트 구조물 제염해체공사의 건설해체공사와의 유사성을 기반으로 작업의 특성별로 분류한 리스크를 도출하는 것은 원자력 발전소 해체공사 리스크 관리에 필수적으로 판단한다.
해체공사는 건설행위에 의해 건립된 건축물의 수명이 평균 22년 이상 경과한 후에 시행되는 후행 건설공종이다. 90년대 이후 해체대상물이 고층화, 대형화됨에 따라 그에 대한 중장기적인 대비가 없었으며, 해체산업 관련 제도나 법 등이 체계적으로 마련되어 있지 않았다. 본 연구에서는 국내 해체공사 안전관리 관련법의 개선방안을 마련하고자 3가지 법령 개선(안)을 제안하였으며 그 내용은 다음과 같다. 첫째, 건설기술관리법의 안전관리계획 수립에서 해체공사 대상의 기준에 대하여 방안을 제시하였다. 둘째, 산업안전보건법의 해체공사표준안전작업지침의 문제점을 보완한 개선방안을 마련하였으며, 셋째, 건설기술관리법의 안전관리계획과 산업안전 보건법의 유해․위험방지계획의 중복성에 대한 통합화 방안을 제시하였다.