In this study, the effect of Distribution efficiency through the fishery production base distribution center (FPC) on the production site board facility was studied. FPC is a new distribution system for Korean fishery products that has been promoted in earnest since 2012, and in this study, the effect before and after the introduction of FPC was analyzed using the DID (Difference in Difference) model for the effect of FPC in the fishery industry. The results of analysis shows that in the case of Wando Geumil FPC, the volume and unit price of consignment sales decreased during the analysis period, which was statistically significant. In the case of Sokcho FPC, the volume of consignment sales decreased during the analysis period, which was statistically insignificant. But the unit price of consignment sales rose during the analysis period, which was statistically significant. In the case of Gyeongju FPC, the volume of consignment sales increased during the analysis period, which was statistically significant at the 90% confidence level. But the unit price of consignment sales fell during the analysis period, which was statistically significant.
Up to date cosmetic OEM/ODM (original equipment manufacturing/original development manufacturing) industry receives attention as a future growth engine due to steady growth. However, because of limited research and development capability, many companies have employed commercial management platforms specialized for large-sized companies; thus, overall system effectiveness and efficiency is low. Especially, MRP (material requirement planning) system introduced originally in 1970s is employed to calculate the requirement of the parts. However, dynamic nature of production lead time usually results in incorrect requirements. In addition, its algorithm does not consider the capability of the production resources. Also, because the commercial MRP system calculates all subcomponent for fixed period, the more goods have subcomponent, the slower calculation is. Therefore, conventional MRP system cannot respond complicated situation in time. In this study, we will suggest a new method that can respond to complicated situations resulting from short lead time and urgent production order in Korean cosmetic market. In particular, a distributed MRP system is proposed, that consists of multi-functional and operational modules, based on the characteristic of the BOM (bill of material). The distributed MRP system divides components (i.e. products and parts) into several fields and decrease the problem size; thus, we can respond to dynamically changed data any time. Through this solution, we can order components quickly, adjust schedules and planned quantity, and manage stocks reasonably. In addition, a prototype of the distributed MRP system is presented in this paper, in which ERP (enterprise resource planning) sever data is associated with an excel spreadsheet via MSsql. System user interface is implemented by a VBA (visual basic for applications) tool. According to a case study, response rate for delivery and planning achievement rate were enhanced about 20%, and inventory turnover was also decreased. Consequently, the proposed system improves overall profit.
21세기 들어서 더욱 나빠지는 기후변화로 가뭄이나 물 부족현상이 전 세계적으로 확대되고 있다. 또한, 화석연료 사용으로 발생하는 이산화탄소는 전체 온실가스의 80%를 차지하기 때문에 지구 온난화의 요인이 되고 있다. 따라서 수처리 멤브레인, 가스분리용 멤브레인, 2차전지용 분리막의 중요성은 증대하고 있으나, 미국, 일본, 독일 등 선진국에서 기술을 독점 하고 있어서 국내 멤브레인 기술의 고도화 및 경쟁력 강화가 시급히 요구되고 있다. 그래서 국가에서도 연구예산을 지원하고 있으나, NTIS 데이터를 이용하여 효율성을 분석하였다. 분석 결과, 단기과제 위주로 지원되고 있고, 타 기술 분야에 비해서도 연구비 규모가 작으며, 기초 소재 분야 지원이 취약한 것으로 분석되었다. 따라서 장기과제를, 많은 예산으로, 대학을 중심으 로 많이 투자할 때 멤브레인 기술의 향상과 경쟁력이 강화되어 선진국과 동등한 기술력을 갖출 것으로 기대된다.
우리나라 영해 밖 EEZ내 침몰한 외국선박의 잔존유 제거작업이 국내 최초로 2019년 5월 이행되었다. 우리 관할수역이지만 기 름 제거작업은 홍콩 선주 측 P&I 보험사와 계약을 맺은 일본업체가 수행하고 국내 업무 대행은 S법무법인과 J해운이 맡았다. 해당 선박은 총톤수 4,433톤의 일반화물선으로 2015년 4월 제주도 남동방 약 48마일 해상에서 침몰하였다. 침몰 후 기름 제거 작업 개시까지 만 4년이 넘는 기간이 소요되었지만 잔존유 제거작업은 단 22일 만에 끝났다. 대형선박이고 잔존유량이 많았던 Erika호나 Prestige호 등 외국사례 등과 비교하면 기름 제거 결정까지 긴 시간이 걸렸다. 그 원인을 파악하고자 해당선박 침몰 시부터 잔존유 제거까지 생산된 모든 문서 93건을 확보하여 분석하였다. 그 결과, 가장 우선적으로 이루어져야 할 행정적 절차 즉, 잔존유 제거에 대한 관할 행정기관의 의사결정이 지연 되었음이 확인되었다. 관할청에서 긴 시간 동안 많은 검토를 하였지만 최종 결과는 초기방안과 별로 달라지지 않았다. 4년의 시간이 흐르는 동안 선내 잔존유 상당량이 유출되고 화물 전체가 유실되었다. 의사결정 지연에 영향을 미친 원인으로 관할청의 사고 관련 기본 사실 이나 자료 확인 소홀부터 법률적, 기술적, 환경적 그리고 인적 측면 등 여러 문제점이 식별되었다. 연구 마지막에 식별된 문제점에 대한 개선안, 즉 의사결정 효율화 방안을 제시한다. 이 연구는 국내 최초 EEZ내 외국 침몰선박 잔존유 제거 사례를 고찰하여 향후 유사한 작업 계획이나 정책수립 등에 도움이 될 것으로 기대한다.
Molding is the root industry of the manufacturing as a means to mass-produce developed prototypes. Molds are typically divided into injection molds and press mold industries. Injection molds produce the products by injection of molten plastic into a mold, and press molds are molded and bended plate. The ejection system, such as eject pins, is used to separate the manufactured products from the mold, which involves a number of hole operations. Location, diameter and depth of holes are often tabulated and managed collectively when designing 2D drawings. The design efficiency was realized by applying CATIA Automation to the 3D model and bringing in the data of the holes in the Excel data.
Owing to the development in information and communications technologies have improved the technology for high-speed transmission of massive data, which has changed closed-circuit television (CCTV) video transmission technology. In particular, digitization of the CCTV video format and streaming technology has made it possible to minimize transmission loss and integrate video transmission and camera control(pan/tilt). It has also become possible to provide additional services like remote emergency warning broadcasting with just Internet Protocol (IP). However, because of the structural problems of IP, these changes have also brought about the threat of hacking of CCTV monitoring systems. In this study, we propose a methode to optimize network management by examining cases of enhancement of operational efficiency and security by improving the structure of CCTV monitoring network.
This paper tries to show the efficiency of water financing between central and local governments. From the year of 2017, the operation and maintenance costs for change water pipes has been provided by central government as block grants system(RDSA: Regional Development Special Account). Even though the water financing is responsible for local government, water drought and high production cost in poor area affects the quality of life nowadays. Then, fiscal transfer through block grant for water financing has been decided to invest regional SOC. The purpose of the paper sheds light on the function of the block grant for public provision by water financing. The firstly tried empirical results are based on the survey from local governments and ministry of environments. The point of the empirical analysis shows that the local governments does not have proper measurement for unexpected water leakage and termination until now. In a policy manner, the paper raises the issues about benefit principle for water users by the increase of tariffs. In order to do so, the paper investigates the relationship between the water provision and fiscal status of each local governments.
MTO (Make to Order) is a manufacturing process in which manufacturing starts only after a customer’s order is received. Manufacturing after receiving customer’s orders means to start a pull-type supply chain operation because manufacturing is performed when demand is confirmed, i.e. being pulled by demand (The opposite business model is to manufacture products for stock MTS (Make to Stock), which is push-type production). There are also BTO (Build to Order) and ATO (Assemble To Order) in which assembly starts according to demand. Lean manufacturing by MTO is very efficient system. Nevertheless, the process industry, generally, which has a high fixed cost burden due to large-scale investment is suitable for mass production of small pieces or ‘mass customization’ defined recently. The process industry produces large quantities at one time because of the lack of manufacturing flexibility due to long time for model change or job change, and high loss during line-down (shutdown). As a result, it has a lot of inventory and costs are increased. In order to reduce the cost due to the characteristics of the process industry, which has a high fixed cost per hour, it operates a stock production system in which it is made and sold regardless of the order of the customer. Therefore, in a business environment where the external environment changes greatly, the inventory is not sold and it becomes obsolete. As a result, the company’s costs increase, profits fall, and it make more difficult to survive in the competition.Based on the customer’s order, we have built a new method for order system to meet the characteristics of the process industry by producing it as a high-profitable model. The design elements are designed by deriving the functions to satisfy the Y by collecting the internal and external VOC (voice of customer), and the design elements are verified through the conversion function. And the Y is satisfied through the pilot test verified and supplemented. By operating this make to order system, we have reduced bad inventories, lowered costs, and improved lead time in terms of delivery competitiveness. Make to order system in the process industry is effective for the display glass industry, for example, B and C groups which are non-flagship models, have confirmed that the line is down when there is no order, and A group which is flagship model, have confirmed stock production when there is no order.
Pressure monitoring is expected to be expanded in a water distribution system according to accelerated development of smart water network management technologies caused by appearances of affordable digital infrastructures like computing, storage and bandwidth. However, the placement of pressure sensors has been determined by engineer’s technical decisions since there is no well-defined criteria for deciding a suitable location of pressure sensor. This study presents a placement method of pressure sensors based on the consideration of allowable error in calibrating water network analysis modeling. The proposed method is to find a minimum set of pressure sensors for achieving a reliable management of water transmissions main and increasing the efficiency of their real-time operation. In the case study in Y area’s transmission main, the proposed method shows equally distributed pressure sensors in terms of hydraulics. It is expected that the proposed method can be used to manage transmission mains stably and construct a robust real-time network analysis system as a minimal criteria.
The definition of an apartment is a building more than 5 stories high and which is the standard law. Currently, the number of apartments is increasing much faster than detached houses. Owning an apartment is a normal trend these days. However, the increasing number of apartments has been increasing the number of apartment fires which also has been making social problems. Therefore, this study was conducted for the fire extinguisher among other fire facilities because it is important for initial fire suppression. The research subject is on the fire extinguisher that is in the underground parking lot of 40 apartment complexes which are more than 10 stories. Survey and analysis were conducted for 80 fire extinguishers. There are two fire extinguishers for each apartment. The result of this study is that all installed fire extinguishers are ABC dry chemical type, 92% of them is 3.3kg and that meet the legal height(less than 1.5m). However, the condition such as appearance, inspection, manufactured year, appearance of signs, material of signs, size of signs, etc. was insufficiency. So improvement of law and system that are fire facility construction, maintenance implementation and additional designation of type approval about sign will be needed in my opinion.
Logistics had only been perceived as a supporting means or auxiliary of corporate activity, but is now surfacing as a priority sector for competitiveness in the infinite competition of the global market.
This study looks into the current status of logistics and sets forth the improvement tasks by analyzing the problems of the returned goods logistics.
In order to improve the manual process of returned goods, the POS system (point-of-sales system) was implemented and DAS (Digital Assorting System) and SORTER System were synchronized for utilization, which cut the prime cost of the once expensive returned goods logistics, and analyzed the efficiency of establishing automated logistics system for efficiency of returned goods logistics in the aspects of one-stop BPR (Business Process Re-engineering).