        In the decommissioning process of nuclear power plants, Ni-59, Ni-63 and Fe-55 present in radioactive waste are crucial radionuclides used as fundamental indicators in determining waste treatment methods. However, due to their low-energy emissions, the chemical separation of these two radionuclides is essential compared to others. Therefore, this study aims to evaluate the suitability of various pre-treatment methods for decommissioning waste materials by conducting characteristic assessments at each chemical separation stage. The goal is to find the most optimized pre-treatment method for the analysis of Ni-59, Ni-63 and Fe-55 in decommissioning waste. The comparative evaluation results confirm that the chemical separation procedures for Fe and Ni are very stable in terms of stepwise recovery rates and the removal of interfering radionuclides. However, decommissioning waste materials, which mainly consist of concrete, metals, etc., possess unique properties, and a significant portion may be low-radioactivity waste suitable for on-site disposal. Considering that the chemical behavior and reaction characteristics may vary at each chemical separation stage depending on the matrix properties of the materials, it is considered necessary to apply cascading chemical separation or develop and apply individual chemical separation methods. This should be done by verifying and validating their effectiveness on actual decommissioning waste materials.
        2.
        2023.11 구독 인증기관·개인회원 무료
        Chelating agents in low and intermediate radioactive wastes can form complexes with radionuclides and increase the mobility of the radionuclides. According to the Korea Radioactive Waste Agency (Acceptance criteria for low and intermediate radioactive waste, WAC-SIL-2022-1), if the amount of residual chelating agents in the waste are greater than 0.1%, the chemical names and residual amounts should be specified; if greater than 1%, the waste must be solidified and contain no more than 8%. The existing method for analyzing chelates in radioactive waste was based on UV–Visible spectrophotometry (UV-Vis), but the new method is based on liquid chromatography/mass spectrometry (LC-MS). The analysis was performed in aqueous solution before applying to real samples. Since the real sample may contain several heavy metals, it is expected that the chelates will exist as complexes. Therefore, 1.0×10-4 mol L-1 of EDTA (Ethylenediaminetetraacetic acid), DTPA (Diethylenetriaminepentaacetic acid), NTA (Nitrilotriacetic acid), and excess metals in aqueous solution were analyzed using HPLC using RP (Reverse Phase) column and HILIC (Hydrophilic interaction) column. When the RP column was used, each substance eluted without separation at the beginning of the analysis. However, when analyzed using a HILIC column, the peaks of each substance were separated. LC-MS measurements using HILIC conditions resulted in separations with better sensitivity.
        3.
        2023.11 구독 인증기관·개인회원 무료
        As existing nuclear power plants reach the end of their lifespan, 22 nuclear power plants in korea are scheduled to be permanently shut down and decommissioned by 2050. Chelates are used as decontamination agents during nuclear power plant operation and decommissioning, and as a result, decommissioning waste contains chelates. Chelates contained in radioactive waste are complexed with radionuclides and increases their mobility. So, qualitative and quantitative analysis of chelates contained in radioactive waste is necessary. However, the spectroscopic method (UVVis), previously used for chelate analysis in Korea takes too much time for analysis and cannot analyze two or more chemically similar chelates at the same time. Due to these problems, new methods for analyzing chelate must be developed. Overseas, many cases of chelate analysis using advanced analysis equipment have been reported. CEA in France has developed a chelate analysis method for application to radioactive waste using HPLC-MS (J. Chromatogram. A, 1276, 20-25, 2013). In this method, the existing method of measuring EDTA using a complex of Fe and EDTA was improved to measuring a complex of Ni and EDTA. Based on such overseas cases, we would like to develop an analysis method for chelates in radioactive waste. For this purpose, we will verify similar overseas papers and develop pretreatment methods for mixtures of chelates (EDTA, DTPA, NTA) and metals (Fe, Ni, Cu, etc.) in various media. Finally, we will develop a separation analysis technology for multi-component chelates in nuclear decommissioning waste based on LCMS.
        4.
        2023.11 구독 인증기관·개인회원 무료
        The domestic Pressurized Heavy Water Reactor (PWHR) nuclear power plant, Wolsong Unit 1, was permanently shut down on December 24, 2019. However, research on decommissioning has mainly focused on Pressurized Water Reactors (PWRs), with a notable absence of both domestic and international experience in the decommissioning of PHWRs. If proper business management such as radiation safety and waste is not performed, it can lead to increased business risks and costs in decommissioning. Therefore, the assessment of waste volume and cost, which provide fundamental data for the nuclear decommissioning process, is a crucial technical requirement before initiating the actual decommissioning of Wolsong Unit 1. Decommissioning radiation-contaminated structures and facilities presents significant challenges due to high radiation levels, making it difficult for workers to access these areas. Therefore, technology development should precede decommissioning process assessments and safety evaluations, facilitating the derivation of optimal decommissioning procedures and ensuring worker safety while enhancing the efficiency of decommissioning operations. In this study, we have developed a program to estimate decommissioning waste amounts for PHWRs, building upon prior research on PWR decommissioning projects while accounting for the specific design characteristics of PHWRs. To evaluate the amount of radioactive waste generated during decommissioning, we considered the characteristics of radioactive waste, disposal methods, packaging container specifications, and the criteria for the transfer of radioactive waste to disposal operators. Based on the derived algorithm, we conducted a detailed design and implemented the program. The proposed program is based on 3D modeling of the decommissioning components and the calculation of the Work Difficulty Factor (WDF), which is used to determine the time weighting factors for each task. Program users can select the cutting and packaging conditions for decommissioning components, estimate waste amount based on the chosen decommissioning method, and calculate costs using time weighting factors. It can be applied not only to PHWRs, but also to PWRs and non-nuclear fields, providing a flexible tool for optimizing decommissioning process.
        5.
        2023.11 구독 인증기관·개인회원 무료
        Kori Unit 1 was permanently shut down in 2017 and is currently being prepared for decommissioning. Decommissioning waste generated during the decommissioning of a nuclear power plant has the characteristic of being generated in large quantities over a short period. Therefore, if proper management is not carried out, abnormal situations (i.e., unauthorized disposal, diversion, etc.) may occur. According to IAEA General Safety Report Part 6, radioactive waste shall be managed for all waste streams in decommissioning. This means ensuring that all waste streams are managed by the recorded inventory of all decommissioning waste and verifying that the recorded inventory is reasonable. The radioactive waste management has been managed in units such as mass and radioactivity. However, in the case of decommissioning waste, the amount is very large, so management by radioactivity is expected to have limitations. Therefore, in this study, a simple test was conducted to verify the decommissioning waste generated by a hypothetical scenario by mass. In this study, establish a scenario assuming various flows of decommissioning waste expected to be generated and calculate the expected inventory of decommissioning waste using Microsoft Excel. Specifically, using “Material Unaccounted For” (MUF), a material balance equation in IAEA Services Series 15, Nuclear Material Accounting Handbook, the error inventory was calculated as the difference between the physical inventory of decommissioning waste in the area and the ending inventory. We propose a simple test scenario to verify the flow of decommissioning waste by verifying that the error inventory reasonably matches the set allowable error. This study aims to verify the inventory of decommissioning waste using the material balance methodology used for nuclear material accounting. It is expected that the safety and reliability of the nuclear power plant decommissioning process can be secured by verifying that the total inventory of equipment before decommissioning and the inventory of remaining equipment and decommissioning waste after decommissioning are reasonably consistent.
        6.
        2023.09 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        This paper described a method for analyzing the structural performance of a metal container used for disposing radioactive waste generated during the decommissioning of a nuclear power plant, and numerical analysis results of a method for reinforcing the container. The containers to be analyzed were those that can be used in near-surface and landfill disposal facilities scheduled to be operated at the Gyeongju radioactive waste disposal facility. Structural reinforcement of the container was performed by lattice reinforcement, column reinforcement, and bottom plate reinforcement. Accordingly, a total of 14 reinforcement cases were modeled. The external force causing damage to the container was set equivalent to the impact of a 9-m fall, accounting for the height of the vault at the near-surface disposal facility. The reinforcement methods with a high contribution to the structural performance of the container were concluded to be lattice and column reinforcements.
        5,100원
        7.
        2023.06 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        Compared to operational wastes, nuclear power plant (NPP) decommissioning wastes are generated in larger quantities within a short time and include diverse types with a wider range of radiation characteristics. Currently used 200 L drums and IP-2 type transport containers are inefficient and restrictive in packaging and transporting decommissioning wastes. Therefore, new packaging and transport containers with greater size, loading weight, and shielding performance have been developed. When transporting radioactive materials, radiological safety should be assessed by reflecting parameters such as the type and quantity of the package, transport route, and transport environment. Thus far, safety evaluations of radioactive waste transport have mainly targeted operational wastes, that have less radioactivity and a smaller amount per transport than decommissioning wastes. Therefore, in this study, the possible radiation effects during the transport from NPP to disposal facilities were evaluated to reflect the characteristics of the newly developed containers and decommissioning wastes. According to the evaluation results, the exposure dose to transport workers, handling workers, and the public was lower than the domestic regulatory limit. In addition, all exposure dose results were confirmed, through sensitivity analysis, to satisfy the evaluation criteria even under circumstances when radioactive materials were released 100% from the container.
        4,800원
        8.
        2023.05 구독 인증기관·개인회원 무료
        Gamma imaging devices that can accurately localize the radioactive contamination could be effectively used during nuclear decommissioning or radioactive waste management. While several hand-held devices have been proposed, their low efficiency due to small sensors have severely limited their application. To overcome this limitation, a high-speed gamma imaging system is under development which comprises two quad-type detectors and a tungsten coded aperture mask. Each quad-type detector consists of four rectangular NaI(Tl) crystals with dimensions of 146×146 mm2 and 72 square-type photomultiplier tubes (PMTs). The detectors are placed in front and back to serve as scatter and absorber, respectively, for Compton imaging. In addition, a coded aperture mask was fabricated in rank 19 modified uniformly redundant array pattern and placed in front of the scatter for coded aperture imaging. The system offers several advanced features including 1) high efficiency achieved by employing large-area NaI(Tl) crystals and 2) broad energy range of imaging by employing a hybrid imaging combining Compton and coded aperture imaging. The imaging performance of the system was evaluated through experiments in various conditions with different gamma energies and source positions. The imaging system provides clear images of the source locations for gamma energies ranging from as low as 59.5 keV (241Am) to as high as 1,330 keV (60Co). The imaging resolution was within the range of 7.5–9.4°, depending on gamma energies, when a hybrid maximum likelihood estimation maximization (MLEM) algorithm was used. The developed system showed high sensitivity, as the 137Cs source at distance, incurring dose rate lower than background level (0.03 μSv/h above background dose rate), could be imaged in approximately 2 seconds. Even under lower dose rate condition (i.e., 0.003 μSv/h above background dose rate), the system was able to image the source within 30 seconds. The system developed in the present study broadens the applicable conditions of the gamma ray imaging in terms of gamma ray energy, dose rate, and imaging speed. The performance demonstrated here suggests a new perspective on radiation imaging in the nuclear decontamination and radioactive waste management field.
        9.
        2023.05 구독 인증기관·개인회원 무료
        Kori unit 1, the first PWR (Pressurized Water Reactor) in Korea, was permanent shut down in 2017. In Korea, according to the Nuclear Safety Act, the FDP (Final Decommissioning Plan) must be submitted within 5 years of permanent shutdown. According to NSSC Notice, the types, volumes, and radioactivity of solid radioactive wastes should be included in FDP chapter 9, Radioactive Waste Management, Therefore, in this study, the types depending on generation characteristics and radiological characterization methods and process of solid radioactive waste were analyzed. Solid radioactive waste depending on the characteristics of the generation was classified into reactor vessel and reactor vessel internal, large components, small metals, spent nuclear fuel storage racks, insulation, wires, concrete debris, scattering concrete, asbestos, mixed waste, soil, spent resins and filters, and dry active waste. Radiological characterization of solid radioactive waste is performed to determine the characteristics of radioactive contamination, including the type and concentration of radionuclides. It is necessary to ensure the representativeness of the sample for the structures, systems and components to be evaluated and to apply appropriate evaluation methods and procedures according to the structure, material and type of contamination. Therefore, the radiological characterization is divided into concrete and structures, systems and components, and reactor vessel, reactor vessel internal and bioshield concrete. In this study, the types depending on generation characteristics and radiological characterization methods and process of solid radioactive waste were analyzed. The results of this study can be used as a basis for the preparation of the FDP for the Kori unit 1.
        10.
        2023.05 구독 인증기관·개인회원 무료
        Kori Nuclear Power Plant Unit 1, which began operating in 1978, is Korea’s oldest commercial nuclear reactor. The reactor was permanently shut down in June 2017, and now the decommissioning process has begun. The decommissioning process will generate a significant amount of waste that requires appropriate management to minimize the impact on the environment and human health. And the waste routing, i.e. the activities and logistics for managing the material generated, is a key point in a decommissioning project. It determines the routes from the material inventory to the envisaged material end states. In this study, we review on several factors for the selection of the waste routes in a decommissioning project. In terms of sustainability, the ‘waste hierarchy’ should be applied to routing materials from nuclear facilities. According to the waste hierarchy, the preferred end state is reuse or recycling of the waste as material or, more preferably, the avoidance of waste generation. In addition, treatments (such as decontamination and thermal treatment) that can reduce the volumes requiring disposal as radioactive waste should be considered. Another important parameter is the need to secure availability and capacity of waste routes. Short-term bottlenecks or any delay in the removal of the waste from the site often has an impact on other site activities. If possible, at least two alternative waste routes should be identified for the main categories of waste and kept available throughout the decommissioning project. All routes should be direct to the material end state if possible, but it is more important that waste is removed from the site so that other site operations are not impeded.
        11.
        2023.05 구독 인증기관·개인회원 무료
        The type of radioactive waste that may occur in the process of nuclear power plant dismantling can be classified into solid, liquid, gas, and mixed waste. The amount of these wastes must be defined in the Final Decommissioning Plan for approval of the licensing. Also, in the case of liquid radioactive waste, it is necessary to calculate the generation amount in order to treat radioactive waste at a Radioactive Waste Treatment Facility (RWTF) or on-site. In this regard, there is no Code and Standard for the amount of liquid radioactive waste generated during NPP are dismantled, but ANSI/NS-55.6 describes the amount of liquid radioactive waste generated from a light water reactor type NPP. This code is applied to nuclear power-related facilities such as domestic NPP and radioactive waste disposal facility. Therefore, this review intends to suggest an application plan for domestic NPP decommissioning through codes for liquid radioactive waste expected to generate during nuclear power plant decommissioning.
        12.
        2023.05 구독 인증기관·개인회원 무료
        The decommissioning of Korea’s nuclear power facilities is expected to take place starting with the Kori Unit 1 followed by the Wolsong Unit 1. In Korea, since there is no experience of decommissioning, considerations of site selection for the waste treatment facilities and reasonable selection methods will be needed. Only when factors to be considered for construction are properly selected and their effects are properly analyzed, it will be possible to operate a treatment facility suitable for future decommissioning projects. Therefore, this study aims to derive factors to be considered for the site selection of treatment facilities and present a reasonable selection methodology through evaluation of these factors. In order to select a site for waste treatment facilities, three virtual locations were applied in this study: warehouse 1 to warehouse 3. Such a virtual warehouse could be regarded as a site for construction warehouses, material warehouses, annexed building sites, and parking lots in nuclear facilities. If the selection of preliminary sites was made in the draft, then it is necessary to select the influencing factors for these sites. The site of the treatment facility shall be suitable for the transfer of the waste from the place where the dismantling waste is generated to the treatment facility. In addition, in order for construction to take place, interference with existing facilities and safety should not be affected, and it should not be complicated or narrow during construction. Considering the foundation and accessibility, the construction of the facility should be economical, and the final dismantling of the facility should also be easy. In order to determine one final preferred plan with three hypothetical locations and five influencing factors, there will be complex aspects and it will be difficult to maintain consistency as the evaluation between each factor progresses. Therefore, we introduce the Analytic Hierarchical Process (AHP) methodology to perform pairwise comparison between factors to derive an optimal plan. One optimal plan was selected by evaluating the three virtual places and five factors of consideration presented in this study. Given the complexity and consistency of multiple influencing factors present and prioritizing them, AHP tools help users make decisions easier by providing simple and useful features. Above all, it will be most important to secure sufficient grounds for pairwise comparison between influencing factors and conduct an evaluation based on this.
        13.
        2023.05 구독 인증기관·개인회원 무료
        The type of radioactive waste that may occur in the process of nuclear power plant dismantling can be classified into solid, liquid, gas, and mixed waste. In addition, according to the level of radioactivity, it can be divided into high level, intermediate level, low level, and clearance level waste. In the case of solid radioactive waste, it is necessary to secure disposal suitability in order to deliver it to a disposal facility, so safe and efficient treatment of a large amount of radioactive waste generated during decommissioning is one of the most important issues. For the treatment of radioactive waste generated during decommissioning, technologies in various fields such as cutting, decontamination, melting, measurement, and packaging are required. Therefore, this study intends to present and application plan for decommissioning domestic nuclear power plants through overseas case studies for the treatment of radioactive waste expected to occur during nuclear power plant decommissioning.
        14.
        2023.05 구독 인증기관·개인회원 무료
        The concept of clearance is to manage radioactive waste by incineration, reclamation, or recycling as non-radioactive waste, excluding those found to have a concentration of less than the allowable concentration of clearance. Among the types of waste subject to clearance, concrete is managed by recycling and landfill, metal by recycling and reuse, combustible materials by incineration, and soil by landfill. In Korea, clearance has been implemented in earnest since 2000, and the types and quantity of waste subject to clearance are increasing. For clearance, the nuclear-related operator submits its clearance plan to the regulatory body, and the regulatory body reviews the clearance plan and notifies the operator of its suitability. Since a significant amount of radioactive waste generated when decommissioning nuclear power plants is expected to be classified as clearance waste, this study will present clearance waste disposal measures for nuclear power plant through a review of overseas cases related to clearance.
        15.
        2023.05 구독 인증기관·개인회원 무료
        A large amount of small and medium-sized metal waste is generated during the decommissioning of nuclear power plants (NPPs). Metal waste is mostly contaminated with low-level radioactive, so it needs decontamination for self-disposal and recycling. A large amount of Organic Decontamination Liquid Waste during decontamination will be generated. The generated organic liquid waste is low in concentration, so the decomposition efficiency is low in the decomposition process. A conditioning process is necessary to concentrate at a high concentration. For effective treatment for Organic Decontamination Liquid Waste, the composition of organic liquid waste and conditioning process were analyzed. Organic acids, metal ions, radioactive nuclides, surfactants, etc. are present in the Organic Decontamination Liquid Waste, and suspended solids are sometimes generated by various reactions. According to previous studies, the concentration of organic acids including surfactants obtained results from several tens of ppm to a maximum of 1,000 ppm, so the maximum value of 1,000 ppm was assumed. For the composition and total amount of metal ions, the average value (52.7wt% Fe, 16.3wt% Ni, 15.1wt% Cr, 15.9wt% Mn) of the distribution of metal species removed by the actual decontamination process is applied, and the total amount is 1,000 ppm was assumed. As for the radionuclides, only 60Co and 137Cs, which are expected to be mainly present, were considered, and 60Co was assumed to be 2,000 Bq/g and 137Cs to be 360 Bq/g by referring to the literature. The amounts of suspended solids were assumed to be 500 ppm by referring to the characteristics of the liquid waste generated in the decontamination process of the NPPs. Based on the estimated value, a reaction formula was established and a simulated Organic Decontamination Liquid Waste was prepared. As a result of measurement using an analysis device, the composition of the estimated and simulated Organic Decontamination Liquid Waste had similar values. The conditioning and treatment process largely consists of pretreatment, conditioning, decomposition processes. Organic Decontamination Liquid Waste goes through a pretreatment process to remove impurities with large particles. In the conditioning process, treated water that has passed through the UF/RO membrane system is discharged into the environment. At this time, Concentrated water goes through a decomposition process for processing the Organic Decontamination Liquid Waste, and is discharged to the environment through a secondary RO membrane system. The conditioning process is the low-concentration Organic Decontamination Liquid Waste in the UF membrane system is forming a micelles in an RO membrane system, concentrating it to a high concentration and then go through a recirculation process in the UF membrane system. An experiment was conducted to confirm whether the concentration of surfactants occurred during the conditioning process. As a result of the experiment confirmed that the highly concentrated surfactant formed micelles and was filtered out in the UF membrane system.
        16.
        2023.05 구독 인증기관·개인회원 무료
        Domestic nuclear power plants developed the scaling factors for the radioactive waste generated from 2004 to 2008 for the first time. Afterwards, the effectiveness of continuous application of the scaling factors have been evaluated for newly generated radioactive waste over the past two years. It was confirmed that most of the initially developed scale factors were effective within a factor of 10 principle, which is an acceptable range. The scaling factors were updated using the analysis data base from 2004 to 2016. A scaling factor refers to the calculated abundance ratio between Key (Easy-to- Measure) and DTM (Difficult-to-Measure) nuclide at the time of generation of radioactive waste based on the source term in the reactor of an operating nuclear power plant. The effectiveness of continuous application of scaling factors can be evaluated at regular intervals regardless of operation status or when there are events that change scaling factors during nuclear power plant operation, such as zinc injection, large-scale facility replacement, and long-term shutdown etc. Even in the case of a permanently shut down nuclear power plant in which fuel is withdrawn from the reactor and generation of new nuclides by nuclear fission and radiation has stopped, periodic verification is conducted to confirm whether the scaling factor developed before permanent shutdown can be effectively applied to the radioactive waste generated after permanent shutdown. However, depending on the nuclear power plant decommissioning strategy or conditions, the period of permanent shutdown prior to decommissioning can be very long, so preparations are needed to ensure the appropriateness of scaling factor operation. In the case of domestic nuclear power plants, Kori Unit 1, a light water reactor, was permanently shut down in June 2017, and as a heavy water reactor nuclear power plant, the permanent shutdown of Wolseong Unit 1 was finally decided in December 2019 after twists and turns including large-scale facility replacement and long-term shutdown. In this paper, we have predicted when the scaling factors will change significantly due to radioactive decay and the difference in halflife between the Key and DTM nuclides over time after permanent shutdown. We also have tried to find appropriate countermeasures for the operation of scaling factors during permanent shutdown period, such as updating scaling factors or applying correction factors.
        17.
        2023.05 구독 인증기관·개인회원 무료
        In Korea, many characteristic component facilities and technologies in general experimental areas for non-radiative materials are owned by industry-academia research. Still, no characteristic analysis test technology has been developed for large, intermediate-level decommissioning waste emitted by neutron irradiation. Since Korea plans to decommission nuclear power plants in 2027, securing analysis technology for intermediate-level decommissioning waste is essential. Accordingly, the Korea Research Institute of Decommissioning (KRID) plans to secure an infrastructure (hot cell) to analyze the characteristics of intermediate-level dismantled waste. Afterward, we intend to stably dispose of the waste generated while decommissioning the current Gori Unit 1/Wolseong Unit 1 using the intermediatelevel dedicated hot cell. It aims to secure high-dose/high-radiation decommissioning waste handling technology through intermediate-level hot cells for the first time in Korea, supports domestic nucleardecommissioning projects, and secure and validate procedures related to material characteristics and nuclide analysis of intermediate-level waste. Furthermore, research on intermediate-level radioactive materials is expected to be carried out in cooperation with schools and research institutes.
        18.
        2023.05 구독 인증기관·개인회원 무료
        In the Kori-1 radioactive waste storage, the concentrated waste and spent resin drums generated in the past are repacked and stored in large concrete drums. In order to dispose of radioactive waste generated before the establishment of the waste acceptance criteria, it is necessary to develop a large concrete drum treatment and waste treatment process to evaluate disposal suitability and secure technology that meets the latest technical standards. In addition, for worker safety and waste reduction, it is important to develop secondary waste treatment technology generated during waste treatment. In this study, the types and characteristics of secondary wastes that can be generated when large concrete drums are decommissioned were investigated. In addition, considering the characteristics of possible secondary wastes, suitable treatment methods and characteristic evaluations were analyzed. We plan to develop an optimal process for secondary waste treatment in consideration of on-site work space, economic feasibility, and safety.
        19.
        2023.05 구독 인증기관·개인회원 무료
        Korea currently has two permanent shutdown Nuclear Power Plants (NPPs), and the decommissioning project is expected to begin soon, starting with the first commercial NPP. The decommissioning project will eventually be the disposal of radioactive waste in the final stage of the work, and in that respect, proper tracking and history management should be well established in the management of waste. This is in line with the guidelines that regulatory agencies should also properly manage radioactive waste. Therefore, this study intends to examine the factors that should be considered in terms of tracking and management of radioactive waste in decommissioning nuclear facilities. The starting and final point of tracking radioactive waste generated during decommissioning is the physical inventory of the current as-is state and the final container. In this respect, the tracking of waste starts from the beginning of the dismantling operation. Thus, at the stage of approval of the decommissioning work, it may begin with an ID scheme, such as the functional location in operation for the target System, Structure, and Components (SSCs). As the dismantling work progresses, SSCs will be classified by nature and radiological level, which will be placed in containers in small packaging units. At this time, the small package should be given an ID. After that, the dismantling work leads to the treatment of waste, which involves a series of operations such as cutting, decomposition, melting, and decontamination. Each step in which these tasks are performed will be placed in a container, and ID assignment is also required. Until now, the small packaging container is for transfer after each treatment, and it is placed in the storage container in the final stage, at which time the storage container also gives a unique ID. Considerations for follow-up management were reviewed assuming solid waste, which is the majority of dismantled radioactive waste considered in this study. The ID system should be prepared from the start of the dismantling work, ID generation of the small transporting container and ID generation of the final disposal container during the intermediate waste treatment process, and each ID generation of the previous stage should be linked to each generation stage. In addition, each ID must be generated, and the definition of the grant scheme and attributes is required.
        20.
        2022.10 구독 인증기관·개인회원 무료
        In this study, a manual that can be applied to conflict management of clearance waste recycling by stakeholders was researched to recycle clearance waste that is most frequently generated when decommissioning nuclear power plants. In order to develop a manual that can be applied to conflict management, the content of the conflict should be derived first. In order to derive conflict, it is necessary to organize major issues in recycling clearance waste in consideration of domestic nuclear energy and social environment. In order to organize major issues in consideration of the domestic environment, a literature survey and a domestic current situation investigation were conducted. At this time, the subject of the major issue was selected based on the Level 1 influencing factors of the previous study. As a result of the investigation, it was confirmed that there were many major issues due to lack of reliability/understanding in nuclear energy/radiation. Through this Conflicts caused by recycling clearance waste were derived based on the organized issues. As a result of deriving conflicts, eight conflicts were derived below. 1) Reduced business availability due to lack of understanding/reliability 2) Lack of reliability in the selection and technology of nuclide analysis technology 3) Additional time and equipment required due to establishment of clearance waste regulatory requirements 4) Low economic benefits due to reduction in the effect of substituting raw materials 5) Political interference due to worsening public opinion 6) Rejection of final products due to recycling due to distrust of radiation 7) Public acceptance along the transport route from the source to the recycling plant 8) Business promotion deteriorated due to changes in energy policy As a result of the derived conflict analysis, the most conflicts related to lack of reliability/understanding in nuclear energy/radiation were derived. Accordingly, in future research, it is necessary to prepare a specific plan to enhance the understanding of stakeholders about self-disposal waste recycling. Considering that research that can solve the conflicts that will be faced when the domestic/foreign clearance waste recycling industry is activated is not activated, this study is meaningful in that it derived the conflicts that will be faced when recycling clearance waste. Also, it is expected that the conflicts derived from this study will be used meaningfully in the establishment of the clearance waste recycling management manual.