검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 11

        2.
        2023.01 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Considering the non-linear behavior of structure and soil when evaluating a nuclear power plant's seismic safety under a beyond-design basis earthquake is essential. In order to obtain the nonlinear response of a nuclear power plant structure, a time-domain SSI analysis method that considers the nonlinearity of soil and structure and the nonlinear Soil-Structure Interaction (SSI) effect is necessary. The Boundary Reaction Method (BRM) is a time-domain SSI analysis method. The BRM can be applied effectively with a Perfectly Matched Layer (PML), which is an effective energy absorbing boundary condition. The BRM has a characteristic that the magnitude of the response in far-field soil increases as the boundary interface of the effective seismic load moves outward. In addition, the PML has poor absorption performance of low-frequency waves. For this reason, the accuracy of the low-frequency response may be degraded when analyzing the combination of the BRM and the PML. In this study, the accuracy of the analysis response was improved by adjusting the PML input parameters to improve this problem. The accuracy of the response was evaluated by using the analysis response using KIESSI-3D, a frequency domain SSI analysis program, as a reference solution. As a result of the analysis applying the optimal PML parameter, the average error rate of the acceleration response spectrum for 9 degrees of freedom of the structure was 3.40%, which was highly similar to the reference result. In addition, time-domain nonlinear SSI analysis was performed with the soil's nonlinearity to show this study's applicability. As a result of nonlinear SSI analysis, plastic deformation was concentrated in the soil around the foundation. The analysis results found that the analysis method combining BRM and PML can be effectively applied to the seismic response analysis of nuclear power plant structures.
        4,200원
        3.
        2021.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구는 스탠다드 국화 ‘백마’의 삽목기간(15, 30, 45일)과 단일처리 시기(정식 후 40, 50, 60, 70일 후)에 따른 버들눈 발생과 절화의 생육에 미치는 영향을 알아보기 위해 실시하였다. 삽목기간이 30일과 45일 처리는 15일 처리보다 초장이 길었고 뿌리수가 많았으나, 잎의 황화현상이 나타났다. 삽목기간이 길수록 정식 후 버들눈 발생률이 높았고, 삽목기간이 45 일 처리에서 버들눈의 발생률이 28.3%로 가장 높았다. 절화의 생육에서 절화장은 삽목기간 15일 처리에서 110.9cm로 가장 길었고, 삽목기간이 길수록 절화장이 짧았다. 절화의 엽수와 무게는 삽목기간 15일 처리에서 가장 양호하였다. 화폭, 설상화 수, 꽃 무게 등 꽃의 생육은 삽목기간이 길어질수록 불량하였고, 꽃목길이는 삽목기간 30일과 45일 처리에서 6.5~8.9cm 로 길게 나타나 절화의 품질이 떨어졌다. 개화소요일수는 다른 처리들보다 삽목기간 45일 처리에서 버들눈 발생으로 인하여 가장 짧았다. 단일처리 시기에 따른 절화의 버들눈 발생률은 정식 60일과 70일 후 단일처리에서 각각 20.1%와 45.8%로 나타나, 정식 40일과 50일 후 단일처리보다 높게 나타났다. 절화의 길이, 엽수, 무게 등의 절화 생육은 영양생장기간이 길었던 정식 70일 후 단일처리에서 가장 양호하였고, 정식 40일 후 단일처리에서 가장 불량하였다. 그러나 화폭, 설상화수, 꽃의 무게 등의 꽃의 생육은 정식 50일 후 단일처리에서 가장 우수하였다. 정식 60일과 70일 단일처리에서 꽃목에 유엽이 발생함에 따라 꽃목길이가 길어져 품질이 하락하였고, 개화소 요일수는 단일처리 시기가 늦을수록 지연되었다. 따라서 스탠다드 국화 ‘백마’의 버들눈은 삽목기간이 길어져 15일 이상된 노화된 삽목묘를 정식하거나 정식 후 단일처리 시기가 50일 이상으로 늦어질 경우에 많이 발생하며, 버들눈 발생으로 화폭, 설상화수, 꽃 무게, 꽃목길이 등 절화의 품질이 크게 하락하는 것으로 나타났다.
        4,000원
        4.
        2018.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recently domestic manufacturing companies have been experiencing worsening profitability and stunted growth due to the long-term economic recession and the rapid rise of developing countries such as China and Southeast Asia. These difficulties force many companies to concentrate their core competencies on new value creation and innovation in order to gain momentum for new growth. Enterprise Resource Planning (ERP) has been considered as one of viable solutions. Among the various modules in ERP, shop floor control function in the production management module is rather limited. In order to overcome this problem, Manufacturing Execution System (MES) has been used as a subsystem which has a strong information gathering power and flexibility. Both systems interact closely with each other. In particular, ERP requires fast, accurate shop floor information at MES. This paper describes how to synchronize relevant information between ERP and MES with theory of constraints (TOC). The processing time information transmitted from the MES workplace is received at the ERP workplace. In the process, the received processing time is causing information distortion in ERP, when the information gathering standard of MES is different from the ERP information interpretation standard. The Drum-Buffer-Rope theory of TOC was applied to resolve this problem, therefore, information synchronization between both systems was made. As a precondition, the standard time of the upper ERP system was rearranged according to the capacity constraints resource. As a result, standard time restructuring has affected changes in labor costs. Standard labor costs have come close to actual ones, and information synchronization of MES transmission data has improved the reliability of standard product costs, such that it enabled various company-wide restructuring actions to be much more effective.
        4,300원
        6.
        2012.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        It is not easy to establish the correct standard time and standard manhour in a process of small quantity batch production system, especially in a case of irregular quantity of production. Therefore, how to establish rational standard time about manufactu
        4,000원
        7.
        2010.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        We constructed a standard curve to quantify Listeria monocytogenes in ready-to-eat product, especially sausage samples, using real-time PCR. A standard curve was generated using serially diluted L. monocytogenes cells in distilled water. When cells were artificially inoculated in 10 g of sausage samples in 90㎖ buffered peptone water, the cell concentration of range was approximately 1.0×108 to 100 CFU/㎖. The standard curve of the serially diluted cells was linear for at least seven orders of magnitude from 103 to 109 CFU/㎖ of L. monocytogenes. When cells were diluted in sausages, the linearity range was from 104 to 108 CFU/㎖. The correlation coefficient (R2) of diluted cells was 0.9888 and the slope of the curve was —2.6621. The coefficient and slope of inoculated samples were 0.9916 and —2.747, respectively. The R2 value for serially diluted L. monocytogenes and artificially contaminated sausage samples were acceptable. The approach described in this study represents the potency of the quantification of L. monocytogenes in sausage samples by quantitative real-time PCR. It can be used in monitoring the presence and persistence of this pathogen in sausages.
        4,000원
        8.
        2002.08 KCI 등재 구독 인증기관 무료, 개인회원 유료
        우리 나라는 현재 표준시로 경도 135 E를 기준으로 하는 I-시간을 사용하고 있으면서 I-시간대역의 서쪽 경계에 위치하고 있어 표준시가 태양시보다 30분 정도 빠르게 운용되고 있다. 우리 나라가 적용하고 있는 이 I-시간이 우리나라의 표준시로 적합한가를 판단하기 위하여 세계 각국의 표준시 사용 현황을 조사 분석하여 다음과 같은 결론을 얻었다. 현재 세계의 각 국가가 사용하고 있는 표준시를 검토해보면 주요 국가 중 56% 정도는 그 지리적 위치가 태양시와 표준시가 어느 정도 일치하고 있으며(Table 4 참조), 18% 정도는 태양시보다 30분 정도 빠른 표준시를, 그리고 또 21% 정도는 태양시보다 1시간 이상 빠른 표준시를 운용하고 있어서 대체로 태양시보다 빠른 표준시 운용을 긍정적으로 받아들이고 있다. 표준시를 태양시보다 늦게 운용하는 국가는 5% 정도가 있을 뿐이다. 이와 같이 세계 대부분의 나라에서 표준시를 태양시보다 30분∼1시간, 또는 그 이상까지도 앞세워 적용하고 있으면서 그 중에서 또 많은 나라가 서머타임까지를 시행하고 있다는 사실은 태양시에 대해 표준시를 어느 정도 앞세워 생활하는 것은 인간의 생체리듬에 악영향을 미치지 않으면서 오히려 시간 이용을 효율화하는 장점이 있다는 결론을 얻을 수 있다. 이는 한국의 경우에도 적용될 것으로 보아 태양시보다 30분 정도 빠른 현재의 표준시 I-시간이 한국인의 생체리듬에 나쁜 영향을 주지 않으면서, 오히려 하루의 시간을 효율적으로 사용할 수 있는 장점을 가진 시간환경인 것으로 판단된다. 뿐만 아니라 이러한 시간환경은 여름철에 일광절약시간제(서머타임제) 시행의 필요성을 완화시켜주는 효과도 있어 표준시를 안정적으로 운용하는 데에도 크게 기여하고 있는 것이다. 또한 이 I-시간은 UTC와 정수 시간차를 유지하면서 안정적으로 운영하려는 세계 각국의 표준시 운영 경향과도 잘 일치한다. 따라서 우리 나라가 태양시에 맞게 H*-시간을 사용해야 한다는 것은 태양시와 비슷한 표준시를 사용한다는 장점은 인정되지만, 그에 못지 않게 UTC와는 비 정수 시간차 시간을 운용하게 되며, 또한 하절기에는 서머타임을 도입해서라도 태양시보다 1시간 빠른 시간을 이용해야 한다는 필요성을 유발하게 된다는 점에서 결코 바람직하지 않다고 생각된다.
        4,500원
        10.
        2014.02 서비스 종료(열람 제한)
        최근 도시의 발달과 기후변화로 인해 재난발생이 다양하고 복잡한 상태가 되어 예측이 어려워져 많은 피해가 발생하고 있다. 이러한 재난에 대응하기 위하여 표준운영절차를 작성하여 운영하고 있으나 활용 및 운영상의 문제 등 다양한 문제가 발생하고 있다. 따라서 본 연구에서는 재난 표준운영절차에 대한 개념 및 현황을 검토하고 도시재난 사례를 통해 표준운영절차를 분석하여 그 지역 피해주민 의식조사를 통해 표준운영 절차상 시사점을 도출하였다. 이를 바탕으로 도시재난 발생에 따른 표준운영절차상 개선방안을 제시하였다. 첫째, 표준운영절차 활용 및 관리체계 향상을 위한 법·제도 개선이 필요하다. 표준운영절차에 대한 법/제도적 근거는 현재 미비한 부분이 많으며 개념도 명확하게 법적 근거로 명시되어 있지 않은 것이 현 실정이다. 이에 표준운영절차 활용의 의무화, 활용을 통한 관리체계화 등 법적 근거를 마련하여 체계적인 활용할 수 있는 여건을 마련해야 한다. 둘째, 표준운영절차 활용을 위한 교육 및 훈련 실시가 요구된다. 재난 발생 시 대응 조직 및 피해지역 주민은 혼란으로 당황하게 된다. 이에 혼란 없이 신속하게 대응하기 위해서는 교육 및 훈련에 대한 필요성을 인식하여 자발적으로 참여하는 여건을 만들고 반복적이고 지속적인 훈련을 통해 대응역량을 강화해야 한다. 이러한 체계적인 표준운영절차를 수립하여 교육 및 훈련에 활용할 수 있도록 학습해야 한다. 셋째 표준운영절차상 주민대피를 위한 예·경보체계를 강화해야 한다. 표준운영절차상에서는 주민대피를 위한 예·경보 방송, 대피를 위한 방송 등 예·경보체계가 운영되고 있다. 실질적으로 의식조사를 살펴보면 방송, 사이렌 등이 주민에게까지 전달되는 것이 미비한 실정이다. 이에 표준운영절차사상 주민대피를 위한 예·경보체계 강화를 위해 법·제도적으로도 개선이 요구되며 주민까지 신속하고 정확하게 전달하기 위한 세부적인 방안이 마련되어야 한다.넷째 주민조직 및 주민에 대한 표준운영절차상 역할을 명시하여 체계적인 대응이 이루어질 수 있도록 한다. 주민조직 및 주민에 대한 행동요령은 명시되어 있으나 상황 및 단계별로 주민조직 및 주민의 역할이 명시되어 있지는 않다. 이에 신속하게 대피하여 인명피해를 줄이기 위해서 주민조직 및 주민의 표준운영절차상 역할을 명시해야 한다.
        11.
        2002.03 KCI 등재 서비스 종료(열람 제한)
        Generally hull insurance is undertaken by mean of a contract of hull insurance. A contract of hul1 insurance here is a contract whereby the insurer undertakes to indemnify the assured against the loss and damage to the vessel mused by maritime perils. A contract of hull insurance is consists of printed main insurance clauses and a clause includes many sub-clauses. Now the Institute Time Clauses-Hulls (hereunder refer to as "English hull insurance clauses"made by the Institute of London Underwriters is much used as the standard from or basic from by many countries ail over the world Now Korean insurance companies hue not made our their own hull insurance clauses, they have just adopted the made-out English hull insurance clauses and the english law and practice to solve the problem related to marine insurance. On the other hand, the United States of America and Japan have made out their own hull insurance clauses based on English hull insurance clauses and used the clauses for many years. Now American is using American Institute Hull Clauses(hereunder refer to as "American hul1 insurance clauses"as its own clauses which was made out by American Institute of Marine Underwriters in 1977 and Japan is also wing its own clauses named Japanese Hull Standard Clauses(hereunder refer to as "Japanese hull clauses") which was made out by japanese Hull Insurance Association in 1990. Therefore the purpose of this study is not only to make a comparative study on English hull insurance clauses 1995, American hull insurance clauses 1977 and Japanese hull clauses l990, but also to supply on some legal materials necessary for Korea to establish and perform our own hull insurance clauses.