간행물

Journal of the Earthquake Engineering Society of Korea KCI 등재 한국지진공학회논문집

권호리스트/논문검색
이 간행물 논문 검색

권호

제27권 제3호 (통권 제153호) (2023년 5월) 4

1.
2023.05 구독 인증기관 무료, 개인회원 유료
This study presents a dry precast concrete (PC) beam-column connection, and its target seismic performance level is set to be emulative to the reinforced concrete (RC) intermediate moment resisting frame system specified in ACI 318 and ASCE 7. The key features include self-sustaining ability during construction with the dry mechanical splicing method, enabling emulative connection performances and better constructability. Test specimens with code-compliant seismic details were fabricated and tested under reversed cyclic loading, which included a PC beam-column connection specimen with dry connections and an RC control specimen. The test results showed that all the specimens failed in a similar failure mode due to plastic deformations in beam members, while the hysteretic response curve of the PC specimen showed comparable and emulative performances compared to the RC specimen. Seismic performance evaluation was quantitatively addressed, and on this basis, it confirmed that the presented system can fully satisfy all the required performance for the intermediate RC moment resisting frame.
4,000원
2.
2023.05 구독 인증기관 무료, 개인회원 유료
It is essential to determine a proper earthquake time history as a seismic load in a seismic design for a critical structure. In the code, a seismic load should satisfy a design response spectrum and include the characteristic of a target fault. The characteristic of a fault can be represented by a definition of a type of possible earthquake time history shape that occurred in a target fault. In this paper, the pseudo-basis function is proposed to be used to construct a specific type of earthquake, including the characteristic of a target fault. The pseudo-basis function is derived from analyzing the earthquake time history of specific fault harmonic wavelet transform. To show the feasibility of this method, the proposed method was applied to the faults causing the Gyeong-Ju ML5.8 and Pohang ML5.3 earthquakes.
4,000원
3.
2023.05 구독 인증기관 무료, 개인회원 유료
This study aims to present a method to evaluate the relative risk of failure due to liquefaction of domestic small to medium-sized earthfill dams with a height of less than 15 m, which has little information on geotechnical properties. Based on the results of previous researches, a series of methods and procedures for estimating the probability of dam failure due to liquefaction, which calculates the probability of liquefaction occurrence of the dam body, the amount of settlement at the dam crest according to the estimation of the residual strength of the dam after liquefaction, the overtopping depth determined from the amount of settlement at the dam crest, and the probability of failure of the dam due to overtopping was explicitly presented. To this end, representative properties essential for estimating the probability of failure due to the liquefaction of small to medium-sized earthfill dams were presented. Since it is almost impossible to directly determine these representative properties for each of the target dams because it is almost impossible to obtain geotechnical property information, they were estimated and determined from the results of field and laboratory tests conducted on existing small to medium-sized earthfill dams in previous researches. The method and procedure presented in this study were applied to 12 earthfill dams on a trial basis, and the liquefaction failure probability was calculated. The analysis of the calculation results confirmed that the representative properties were reasonable and that the overall evaluation procedure and method were effective.
4,000원
4.
2023.05 구독 인증기관 무료, 개인회원 유료
As a result of active geological investigation of faults in Korea, many Quaternary faults have been identified and some of them were judged to have potential to generate earthquakes. Those faults need to be considered as additional seismic sources in the seismic hazard analysis. When a fault is introduced as a new source, the earthquakes generated by the fault should be removed from the area sources that include any part of the fault, to avoid double counting. In practice, however, double counting cannot completely be avoided as the complete separation of the fault-generated earthquakes from the area sources is impossible due to uncertainties related to the earthquake location, subsurface structures of faults, etc. When a new fault source is introduced, the only constraint is the invariance of earthquake frequency. The maximum earthquake and the Richter-b value should also be subject to change, but there are no competent approaches to estimate the change due to incomplete separation of earthquakes. To gain insight into the effect of a new fault source, an example calculation of the seismic hazard were carried out. The example calculation shows that addition of a new fault source centers seismic hazard around the fault source.
4,000원