검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 954

        41.
        2023.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The public safety management guidelines were introduced in 2019 and continue to be dedicated to advancing comprehensive measures for public safety management, with a primary focus on prioritizing the safety and well-being of the public within governmental institutions. To achieve this goal, our previous study developed a establishment procedure of risk assessment-based safety inspection system for public institutions that order construction projects and applied it to highway construction projects to evaluate its effectiveness. To enhance the practicality of the establishment procedure, it is essential to collect and analyze feedback from stakeholders regarding its performance and suitability. This study conducted a survey involving 200 participants who had experience with the establishment procedure, and performed statistical analyses to evaluate its performance and applicability. The survey results indicated that the participants reported a high level of satisfaction (scoring 4 and above on a 5-point Likert scale) in several areas: specialization of safety inspection items for different types of work (with a satisfaction rate of 65%), the evaluation process for safety ratings (64.5%), and their willingness to recommend the procedure to other institutions (75.5%). In the factor analysis with Varimax rotation, two factors emerged: (1) a specialization factor related to safety inspection items, and (2) a grading factor associated with safety evaluation results. Regression analyses of these factors unveiled significant positive relationships with improvements in safety and health performance, including the prevention of fatal accidents, heightened safety responsibility, and raised safety inspection standards. The establishment procedure of safety inspection system developed in our previous study can play a crucial role in reducing accidents resulting in fatalities and injuries at construction sites, ultimately contributing to a safer working environment for all involved parties.
        4,000원
        44.
        2023.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        To investigate the national science and technology policy direction in the field of construction machinery, an analysis was conducted on projects selected as national research and development (R&D) initiatives by the government. Assuming that the project titles contain key keywords, text mining was employed to substantiate this assumption. Project information data spanning nine years from 2014 to 2022 was collected through the National Science & Technology Information Service (NTIS). To observe changes over time, the years were divided into three-year sections. To analyze research trends efficiently, keywords were categorized into groups: ‘equipment,’ ‘smart,’ and ‘eco-friendly.’ Based on the collected data, keyword frequency analysis, N-gram analysis, and topic modeling were performed. The research findings indicate that domestic government R&D in the construction machinery field primarily focuses on smart-related research and development. Specifically, investments in monitoring systems and autonomous operation technologies are increasing. This study holds significance in analyzing objective research trends through the utilization of big data analysis techniques and is expected to contribute to future research and development planning, strategic formulation, and project management.
        4,000원
        49.
        2023.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The construction industry stands out for its higher incidence of accidents in comparison to other sectors. A causal analysis of the accidents is necessary for effective prevention. In this study, we propose a data-driven causal analysis to find significant factors of fatal construction accidents. We collected 14,318 cases of structured and text data of construction accidents from the Construction Safety Management Integrated Information (CSI). For the variables in the collected dataset, we first analyze their patterns and correlations with fatal construction accidents by statistical analysis. In addition, machine learning algorithms are employed to develop a classification model for fatal accidents. The integration of SHAP (SHapley Additive exPlanations) allows for the identification of root causes driving fatal incidents. As a result, the outcome reveals the significant factors and keywords wielding notable influence over fatal accidents within construction contexts.
        4,000원
        50.
        2023.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.
        4,000원
        53.
        2023.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..
        4,000원
        54.
        2023.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recently, defects that occurred during the construction of apartment houses have become a social issue. Defects in apartment houses lead to waste of resources and economic loss, causing psychological and physical damage to customers, and a decrease in reliability and financial loss to construction companies. The purpose of this study was to analyze the impact of defect occurrence according to the difference in project management level in the apartment housing construction stage, and to investigate the extent to which the project manager's experience affects the defect occurrence rate. For the empirical analysis of the study, statistical analysis was conducted using data collected from 130 actual projects. The results of the analysis showed that schedule management, cost management, and quality management had a positive effect on reducing the defect occurrence rate in the execution stage of apartment housing construction, while human resource management productivity had a negative effect. This study theoretically demonstrated the importance of project management, and in practice, showed that schedule management, cost management, and quality management should be faithfully performed in the execution stage to reduce the rate of defects after project completion. It was also suggested that hiring an experienced project manager would help reduce project defects.
        4,300원
        55.
        2023.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구는 복수노조 하에서 건설업에서의 교섭창구단일화 및 소수노조 보호제 도의 운영실태를 분석하여 개선방안을 모색하였다. 나아가 교섭창구단일화제 도가 형식이 아닌 실질적인 의미에서 소수노조의 노동3권을 보장하고 사용자 의 경영권과도 균형을 이루기 위한 제도로 자리매김하도록 교섭창구단일화제 도 전반에서 소수노조 노동3권 강화를 위한 실질적인 개선방안을 도출하였다.
        6,400원
        56.
        2023.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        건설공사도급계약 체결 시 도급인과 수급인 간에 지체상금약정을 체결하는 것 이 일반적이고, 그에 대한 구체적인 내용은 국토교통부 고시상 ‘민간건설공사 표준도급계약 일반조건’이나 공정거래위원회 ‘건설공사도급계약 표준약관’에 의하고 있다. 지체상금은 건설공사 진행 단계 중 공기지연 등으로 인한 문제가 발생할 경우를 대비하여 건설공사도급계약 체결 시 수급인(시공사 및 계약상 대자)이 건설공사도급계약상 이행의무를 지연할 경우 지급하여야 할 배상금액 을 미리 정하고 있는 것인데, 분쟁의 사전 예방과 공사이행의 담보 등 많은 역 할을 해 줄 것이라는 기대에도 불구하고 실제 건설공사도급계약에서는 지체상 금 약정과 관련한 분쟁이 끊임없이 발생하고 있다. 무엇보다도 지체상금 관련 조건이 제대로 이행되지 않아 그로 인한 조건 구비 여부 자체가 문제되는가 하면, 보다 강력한 이행 강제를 부담지우려는 목적으 로 발주자가 미리 지체상금액을 과다하게 책정하거나 청구할 수 있도록 함으 로써 도급계약 자체가 수급인 쪽에 불리하게 이루어지는 경우도 많아 논란이계속되고 있다. 이러한 현실에서 본 연구에서는 지체상금에 관한 그동안의 판 례 및 선행연구들을 분석하고 정리함과 동시에 현재 지체상금 약정 운용 시에 나타나고 있는 몇 가지 주요 문제들인 지체상금의 면책사유 및 구체적 운영 과정에서의 지체상금 부과와 관련한 판단기준이나 당사자 귀책사유에 따른 지 체상금의 적절한 분배 문제 등에 대하여 판례 및 그에 대한 해석론을 중심으로 고찰하였다.
        8,900원
        57.
        2023.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Construction industry is considered as one of the most high-risk industries for work-related injuries and fatalities, accounting for more than half of fatalities in Korea. Advanced countries have recognized the critical role of designers in preventing construction accidents and have established regulations on design for safety. In line with this, the Korean government have also implemented regulations that require owners and designers to review the safety of design outcomes. However, it has been observed that designers face challenges in identifying hazards and integrating design solutions at the design stage mainly due to their shortage of required knowledge and skills. This study aimed to examine design solutions that can be applied to prevent fall accidents in the construction industry, and to establish a relationship between these solutions and fatal fall accidents occurred over the past three years in Korea. This study also analyzed the relationships of four variables (construction type, cost, work type, and fall location) with design solutions. The results indicated that all four variables have significant relationships with design solutions, with fall location showing the strongest relationship. The design solutions and their relationships with fatal fall accidents identified in this study can be utilized in identifying hazard and integrating design solutions to ensure design for safety.
        4,000원
        58.
        2023.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Occupational safety and health management expenses in the construction industry are statutory and separately included in the cost statement to prevent occupational accidents and health problems. The expenses are determined by multiplying the standard amount by the rate decided according to construction types and scales. However, the current expense appropriation method does not properly reflect the recent changes in the construction industry such as industry size, industry diversification, and social atmosphere about safety reinforcement. This study surveyed 1579 questionnaires in total and analyzed expense execution rate and proportion of each expense category. The expense execution rate was relative higher in complex construction (e.g., heavy construction = 126%, civil engineering = 125%) and long-period project (equal to or over 48 months construction = 133%) compared to general construction (98~116%) and short-period project (less than 48 months construction = 115%). The proportion of spending expenses was higher in the category of safety manager labor costs (25~52%), safety facility costs (22~40%), and personal protective equipment costs (10~25%). The analysis results of the study can be utilized in revising the standard expense appropriation method by reflecting the current usages of the occupational safety and health management expenses in the construction industry.
        4,000원
        59.
        2023.06 구독 인증기관 무료, 개인회원 유료
        4,600원
        60.
        2023.06 구독 인증기관 무료, 개인회원 유료
        5,800원
        1 2 3 4 5