검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 394

        161.
        2016.10 서비스 종료(열람 제한)
        There has been a growing interest in the seismic performance of existing structures. Have been enacted most of the evaluation criteria, there is a need for specific seismic performance evaluation methods and standardization of the dam. In the present study, we carried out the seismic performance evaluation of two of the concrete dam with different shape, for explaining the relationship of the dam of the shape and seismic safety.
        162.
        2016.10 서비스 종료(열람 제한)
        In this study, in order to understand the stratification characteristics of a lake, temperature monitoring by water depths was performed at the upstream of the ○○ dam. The seasonal stratification changes were investigated through the temperature data by water depths acquired during about 10 months.
        163.
        2016.09 KCI 등재 서비스 종료(열람 제한)
        After large-scale flooding damage occurred along the Imjin river in 1996, 1998, and 1999, the Hantan river flood control dam was planned, and it has since been under construction. Unlike existing dams in Korea, the Hantan river flood control dam will remain fully open except during high floods, when the dam will store flood water temporarily to reduce flood peaks and flood water volume downstream. During past flooding seasons, floating debris has caused difficulties in the management of large-scale dams. Most of the existing multipurpose dams in Korea have installed nets to collect floating debris based on many years of experience with and data about inflow and distribution of floating debris in the dams. For the Hantan river flood control dam, however, collection of data about inflow and distribution of floating debris is not possible as the dam is located near the border area between North and South Korea. In order to devise a preliminary plan to collect floating debris in the Hantan river flood control dam, an EFDC hydrodynamic model was used to analyze the behavior of floating debris during high floods. The Lagrangian particle tracking method was utilized to simulate the behavior of floating debris in the dam. Based on the analysis of paths and final destinations of the particles, seven collection points were selected where it seemed to be effective to collect floating debris, as debris is likely to accumulate there in high density.
        164.
        2016.07 KCI 등재 서비스 종료(열람 제한)
        가뭄의 피해를 줄이기 위해서는 시기적절한 용수관리와 지역주민의 절수 유도가 필요하며, 이를 위해서는 가뭄의 현황 및 전망에 대한 정보가 무 엇보다 중요하다. 특히 생·공용수를 공급하는 다목적댐의 경우 저수량에 대한 향후 전망은 용수관리를 위한 가장 중요한 정보이다. 이에 본 연구에 서는 핵밀도함수를 활용하여 유입량의 불확실성을 고려한 확률론적 저수량 예측 모형을 구축하고, 그 적용성과 활용성을 분석하였다. 확률론적 저 수량 예측 모형은 현재의 저수량을 기준으로 시간의 변화에 따른 저수량을 확률적으로 예측할 수 있다. 이를 통해 현재의 가뭄상황에서 향후 저수 량의 변화 양상을 파악하여 중장기적인 대응이 가능하고 특정시점의 목표 저수량을 달성하기 위한 용수 비축량을 산정할 수 있어 용수관리에 관한 의사결정을 위한 도구로 활용이 가능할 것으로 판단된다.
        165.
        2016.05 KCI 등재 서비스 종료(열람 제한)
        지 신뢰성 있는 댐유입량의 장기예측은 효율적인 댐운영에 필수적이다. 2000년대 이후 엘리뇨-남방진동(ENSO) 등의 전구기후지수와 지역수문기후 와의 원격상관성이 규명되면서, 이를 활용한 미래의 수문조건을 예측하기 위한 연구가 활발히 시도되고 있다. 본 연구에서는 안동댐유역을 대상으로 미국 NOAA에서 제공하는 40개 전구기후지수의 원격상관을 분석하고, 이를 기반으로 1개월 선행 댐유입량의 예측성능 및 활용성을 평가하였다. 본 연구에서는 1) 원격상관을 통해 강수와 기온을 예측하고 SWAT 모델을 이용하여 예측 댐유입량을 산정하는 방법(SWAT-Forecasted), 직접 댐유입 량을 예측하는 기법(CIR-Forecasted), 예측시점의 관측값이 과거자료에서 해당하는 순위(rank)에 근거한 방법(Rank-Observed)을 비교하였다. 결 과적으로 통계적 방법으로 댐유입량을 직접 예측하는 접근 방식(CIR-Forecasted)이 12월을 제외하고는 다른 방법에 비해 우수한 예측성을 보였다. 이것은 강수량 및 기온 예측정보를 일단위로 상세화하는 가정과 유출모델링과정에서 발생하는 불확실성이 예측결과에 포함되지 않기 때문인 것으로 판단된다. 본 연구결과는 원격상관기반의 1개월 선행 댐유입량 예측이 안동댐 운영에 유용한 정보를 제공할 수 있는 것을 시사하였다.
        166.
        2016.05 KCI 등재 서비스 종료(열람 제한)
        이 논문은 표면 차수벽형 석괴댐(Concrete-Faced Rock-Filled Dam) 콘크리트의 내구성능 개선에 관한 것이다. 댐은 영구 구조물이 며 그 중요성을 감안할 때 충분한 내구성능이 확보되어야 한다. 이 논문에서는 플라이애시와 PVA 섬유를 혼입함으로써 차수벽 콘크리트의 내 구성능을 개선하고자 하였으며, 플라이애시와 PVA 섬유 혼입율에 따른 내구성능 향상 검증을 위하여 기본물성 (강도, 소성수축, 자기수축)을 포함한 내구성능 검증 실험(염소이온 침투, 마모 저항성, 동결융해 저항성)을 수행하였다. 실험 결과, 플라이애시 15%와 PVA 섬유 0.1%를 혼 입하였을 때 내구성능 개선 효과가 뛰어난 것으로 나타났다. 검증된 차수벽 콘크리트의 현장 적용을 통해 표면 차수벽형 석괴댐의 안전성 및 내 구성 개선에 기여할 수 있을 것으로 판단된다.
        167.
        2016.04 KCI 등재 서비스 종료(열람 제한)
        일반적으로 하천의 유량은 댐과 같은 수공구조물에 의해 조정된 유량으로 수자원계획을 위해서 필요한 자연유량과는 차이가 크다. 수자원계획 을 수립함에 있어 자연 유입량 정보는 댐 운영과 수문분석을 위한 필수적인 정보이다. 본 연구에서는 댐 유역 일유입량 모의기법을 위한 통합 모형 을 개발하였다. 첫째, 장기 강우-유출 모형의 입력강우자료로 사용하기 위하여 평균 및 중앙값과 같은 통계적 모멘트를 효과적으로 재현하고 극치 강우량 재현에 유리한 불연속 Kernel-Pareto 확률분포 기반의 강우모의기법을 통하여 강우모의를 수행하였다. 둘째, SAC-SMA 장기 강우-유출 모형의 매개변수를 Bayesian MCMC 기법을 통하여 최적화하여 산정된 매개변수의 사후분포를 활용하여 댐 유입량 시나리오 도출하였다. 댐 유 역을 대상으로 개발된 모형을 평가한 결과 자연유량과 통계적으로 유사한 특성을 가지는 시나리오를 생성할 수 있었으며, 물수지 분석 등과 같은 수자원계획을 위한 시나리오로 활용이 가능할 것으로 판단된다.
        168.
        2016.04 서비스 종료(열람 제한)
        Climate change is one of the most essential factors that should be taken into account for dam safety assessment. In this study infiltration/slope stability analyses are performed based on various flood scenarios. Using the results of the numerical analyses, a safety assessment is performed on a fill dam in Nak-Dong River, South Korea.
        169.
        2016.04 서비스 종료(열람 제한)
        In this study, quartile control chart method is tried to apply to determine limit values of existing dams of K-water’s instrumentation data for dam safety, show asymmetric distributed data, and the example of application is presented. The determined limit values of concrete stress meter and concrete non-stress meter by Shewhart method and quartile method show that the determined limit values by Shewhart method indicate that the majority of instrumentation are on abnormal condition, although the measured values are normal behavior. But, in case of the result of quartile method has such an error. Like this, it is judged that the determination of the limit values of dam instrumentation, show asymmetric and abnormal distributed data, by the quartile method is appropriate. Therefor The quartile method is applied to the determination of limit values of existing dam instrumentation of K-water.
        170.
        2016.04 서비스 종료(열람 제한)
        In this study, repair and reinforcement priority determining method for each component of existing dams is suggested. Condition assessment results from in-depth inspection followed by “specific guide for in-depth inspection on dams” are used. Condition assessment is subdivided into several steps and evaluation indices are determined by considering weights such as influence coefficients and adjustment factors for each component through all of the steps. These weights are counted backward to determine the priority for each component and facility. An algorithm is designed to analyze this procedure and 4 target dams are adopted to verify the method. This method can be used for establishing an efficient maintenance strategy related to the repair and reinforcement priority determination.
        171.
        2016.04 서비스 종료(열람 제한)
        Defects of diversion tunnel have been analyzed by using the precise inspection for safety and diagnosis in 7 dams. Leakage from joint, crack, and material segregation is crucial damage in dam as well as crack, corrosion, and drainage system. Maintenances of diversion tunnel have been suggested with common and unique characteristics of defects.
        172.
        2016.04 서비스 종료(열람 제한)
        It is important to analysis a Response change of measured data in order to observe displacement of Dam. So, we are able to judge what problems happen in dam throughout this analysis. In this study, Response Change judged abnormal behavior show about an example of analysis on a Dam in South Korea and we supposed current condition of this dam.
        173.
        2016.04 서비스 종료(열람 제한)
        Recently, various types of landslide occurs frequently in domestic and foreign. The purpose of this study is to evaluate dam safety due to landslide in dam area. In order to evaluate dam safety on overtopping which may be occur by landslide, the scales of landslide were calculated through empirical formula and results of field survey in valleys, and wave heights of impulse were computed through numerical simulation for each case. Dam safety assessment was performed by the numerical analysis.
        174.
        2016.04 서비스 종료(열람 제한)
        In this study, in order to enhance the quality of concrete dam it is mentioned that the influenced factors which effect on the water leak and methodology for weak zone repair and retrofit before filling water of concrete dam.
        175.
        2015.10 KCI 등재 서비스 종료(열람 제한)
        댐 위험도 해석시 수문학적 변량(강수, 유출 및 수위)들의 상호관계를 고려한 체계적인 분석과정이 요구된다. 그러나 기존 댐 위험도 해석 연구에서는 변량간의 체계적인 관계 평가를 수행하는데 있어서 한계점을 나타내고 있다. 이러한 점에서, 본 연구에서는 수리·수문학적 변량간의 관계를 효과적으로 평가하고자 Bayesian Network 기반의 댐 위험도 해석 기법을 개발하였다. 실제 댐에 대해서 제안된 모형을 적용한 결과 파괴인자간의 상호관계 규명 및 불확실성을 평가하는데 있어서 기존 연구보다 쉽게 가장 큰 파괴인자를 파악할 수 있는 장점이 있었다. 이와 더불어 다양한 시나리오에 따른 댐의 안정성을 파괴확률 및 예상피해의 함수인 위험도로 평가할 수 있도록 하였다. 즉, 기존 댐 위험도 기법으로 수행한 결과에서는 월류 확률이 도출 되지 않았지만, Copula 함수를 도입하여 댐 초기수위를 고려한 결과 댐 월류 확률이 발생하였 으며, 피해결과 역시 크게 증가하고 있는 것을 확인할 수 있었다. 이러한 결과를 기반으로 향후 댐의 보수보강 등의 우선순위 결정을 위한 도구로서 활용이 가능할 것으로 판단된다.
        176.
        2015.10 서비스 종료(열람 제한)
        In this study, in order to measure the seepage through dam body and foundation, we conduct geophysical survey such as electromagnetic survey in A dam that has not been measured quantitative seepage. Therefore we will analyze the reasons and establish the improvement.
        177.
        2015.10 서비스 종료(열람 제한)
        Currently in Korea, there are about 1200 dam (height 15m or more) Recently, natural disasters are caused by abnormal climate and they have caused a lot of damage. but many institutions about dam don’t resolve this problem because dam was owned and managed by other institutions. Therefore, to develop Web2.0 Smart Management System, it will be possible to combine different institutions and do efficiently intelligent management of dam.
        178.
        2015.10 서비스 종료(열람 제한)
        Deformation monitoring of dams has been widely used for its safety management. In this study, improvement of the deformation monitoring with a total station was suggested by calibrating coordinate of a total station. The position of TS was initially measured through 3∼4 given points and the coordinate of total station was considered as an absolute value. However, when the targeting point was measured by the total station, the coordinate of the total station was changed and it means that deformation of the total station was also occurred. Therefore, the deformation of dams was increased by deformation of the total station. Before the calibrating, the deformation of the target point located at 50m from total station was ±20mm. After the calibrating, the deformation was decreased by ±2mm.
        179.
        2015.10 서비스 종료(열람 제한)
        Recently, assessment of vulnerability of existing dam structures is a rising key issue in aspects of entire life year from design, construction to maintenance even in Korea due to more frequent earthquakes and effects of climate change. This study aims to develop a vulnerability assessment method for existing dam structures by using fragility analysis method based on 2-D FEM analyses, which can take into consideration various uncertainty information to dam structure safety assessment, and which may be incorporated into an integrated safety management platform under development by K-water.